ESA UNCLASSIFIED – For Official Use HYLAS ESA-Avanti Success Story A. Cotellessa Harwell 19/10/2011

HYLAS ESA-Avanti Success Story ESA-Avanti Success Story A. Cotellessa Harwell 19/10/2011 Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications |

Embed Size (px)

Citation preview

ESA UNCLASSIFIED – For Official Use

HYLAS ESA-Avanti Success Story

A. Cotellessa Harwell 19/10/2011

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 2

ESA UNCLASSIFIED – For Official Use

What is Hylas-1

1. HYLAS is the first satellite system developed in Europe to provide low-cost internet access across parts of the continent. Hylas-1 is the name of the first satellite.

2. The satellite system has been developed through a Public Private Partnership between ESA and the British satellite operator Avanti Communications.

3. Hylas-1 embarks an advanced telecommunication payload whose design, development, production and test has been financed by ESA

4. The support of UKSA (then-BNSC) has been fundamental to realise the project.

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 3

ESA UNCLASSIFIED – For Official Use

From myth to hi-tech reality

1. HYLAS stands for Highly Adaptable Satellite, a product of third millennium state of the art European Space technology

2. In Greek mythology, Hylas was a handsome young man, son of Heracles, who joined his father as one of the Argonauts in the quest for the Golden Fleece

3. Abducted by a nymph, fallen for Hylas’ beauty, he was never to be found again

4. Hercules was very fond of Hylas whom he considered as a young apprentice

5. Hercules is a candidate name chosen by Avanti Communication for one of their future “big” satellites

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 4

ESA UNCLASSIFIED – For Official Use

J.W. Waterhouse painting (1896)

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 5

ESA UNCLASSIFIED – For Official Use

Satellite coverage Map

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 6

ESA UNCLASSIFIED – For Official Use

Who did what

1. ESA awarded a contract to Avanti for the HYLAS Mission, funding payload development and contributing to the launch costs

2. Avanti have awarded the Satellite procurement contract to EADS Astrium

3. The satellite is based however on an Indian platform, developed by the Indian Space Research Organisation (ISRO)

4. Inmarsat provide the satellite control centre infrastructure and services in London and Italy

5. Avanti Communications set up the Network Operations Centre and the Teleport in the United Kingdom (Cornwall)

6. The satellite In-Orbit Testing (IOT) was performed from the ESA Ground Station of Redu (B)

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 7

ESA UNCLASSIFIED – For Official Use

Industrial Team and Roles

Avanti

Astrium

Inmarsat

Antrix/ISRO

Arianespace

Hylas System

Space Segment

Service Segment

Support Segment

Control Segment

Platform

Payload

Satellite Control Centre

TT&C Antennae(Telespazio)

Network Operations

Centre

Broadband Services (Hughes)

Ka band gateways(GD Satcom)

Launcher

Regulatory

Insurance In Orbit Test

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 8

ESA UNCLASSIFIED – For Official Use

Spacecraft Data Sheet

1. Hylas Spacecraft

a. Reference payload

– 8 Ka band spot beams (0.6 deg aperture) 8x120W channels, EIRP 60.0 dBW (max)

– 1 Ku band pan European coverage 2x150 W channels, EIRP 52.0 dBW

b. Spacecraft stabilisation: three axis (momentum bias)

c. Spacecraft mass (dry): 1120.0 kg

d. Spacecraft Mass (lift-off): 2,560 kg (excluding adaptor)

e. Payload mass: 261 kg (including antennae)

f. Payload Power: 2000 W (EOL)

g. Spacecraft Power: 3200 W (EOL)

h. Solar Arrays: 2x deployable 2-panel wings with triple junction cells

i. Batteries: 2x64 Ah Li-ion

j. Overall dimensions: 4.2 m X 2.6 m X 2.5 m (stowed)

k. TM band: Ku for emergency and on-station

l. Operational lifetime: 15 years

m. Orbital location: 33.5o W

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 9

ESA UNCLASSIFIED – For Official Use

Spacecraft Views

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 10

ESA UNCLASSIFIED – For Official Use

GFP technology

1. The use of General Flexible payload Technology allows the configuration of each transponder in terms of bandwidth, frequency plan and power allocation.

2. Bandwidth can be varied between 108 and 250 MHz for each of up to eight Ka Band transponders in 500 KHz steps. The Ku Band transponders can equally be adjusted between 18 and 120 MHz.

3. Power allocation is performed by using Tesat Flexible TWTA technology: this provides nearly-constant efficiency operation while the TWTA works within a 3 dB range.

4. The core of the payload equipment has been designed, developed, manufactured and tested by Atrium UK in their Portsmouth facilities

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 11

ESA UNCLASSIFIED – For Official Use

GFP Hardware

Master Reference Oscillator (MRO)

Single Channel Agile Converter Equipment (SCACE) Agile Integrated Down Converter Assembly (AIDA)

Routing And Switching Equipment (RASE)

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 12

ESA UNCLASSIFIED – For Official Use

Tesat Ka band Flexi-TWTA

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 13

ESA UNCLASSIFIED – For Official Use

Hylas Satellite Control Centre

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 14

ESA UNCLASSIFIED – For Official Use

SCC- Primary TTC antenna in Fucino (I)

4.8 m Primary Ku band TT&C Antenna 14.3 m Ku band Emergency TT&C Antenna

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 15

ESA UNCLASSIFIED – For Official Use

Ka band Gateways: Goonhilly and Lands End

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 16

ESA UNCLASSIFIED – For Official Use

A brief history of Hylas

2006 2007 2008 2009 2010 2011

Payload

Spacecraft

Launch Campaign

In Orbit and System tests

Routine Operations

Europe

Bangalore

Kourou

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 17

ESA UNCLASSIFIED – For Official Use

Repeater testing in Portsmouth

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 18

ESA UNCLASSIFIED – For Official Use

Satellite tests in January 2010 (India)

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 19

ESA UNCLASSIFIED – For Official Use

Ka-band reflector deployment (India)

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 20

ESA UNCLASSIFIED – For Official Use

Final tests in India

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 21

ESA UNCLASSIFIED – For Official Use

Arrival in Cayenne

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 22

ESA UNCLASSIFIED – For Official Use

North solar array deployment in Kourou

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 23

ESA UNCLASSIFIED – For Official Use

Hylas-1 on Ariane 5: final mate

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 24

ESA UNCLASSIFIED – For Official Use

Roll out to launch pad

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 25

ESA UNCLASSIFIED – For Official Use

Lift off

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 26

ESA UNCLASSIFIED – For Official Use

Redu Facilities

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 27

ESA UNCLASSIFIED – For Official Use

Ku and Ka band IOT antennae

Ku-band (foreground) and Ka-band (background) antennae in Redu

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 28

ESA UNCLASSIFIED – For Official Use

System Acceptance Tests

Hylas-1 Ka band gateway in Goonhilly during System tests

Web browsing ESA telecom portal via Hylas-1

Andrea Cotellessa | Harwell | 19/10/2011 | Telecommunications and Integrated Applications | Slide 29

ESA UNCLASSIFIED – For Official Use

THANK YOU

Andrea Cotellessa

Head of the Hylas Project Office [email protected]

THANK YOU