1 PIPELINE INSPECTION Clive Anderson Stolt Offshore

Hydrofest 7 Pipeline Inspection

Embed Size (px)

Citation preview

Page 1: Hydrofest 7 Pipeline Inspection

1

PIPELINE INSPECTION

Clive Anderson

Stolt Offshore

Page 2: Hydrofest 7 Pipeline Inspection

2

Agenda:

•Why Inspect

•Regulations

•The IMR Cycle

•What is a pipeline

•Inspection Methods

•Data Acquisition

•Data Processing

•Reporting

•The Future

•Conclusions

•Questions

The agenda for today’s presentation.

Page 3: Hydrofest 7 Pipeline Inspection

3

WhyInspect ?

•This is the famous pipeline inspection expert Sherlock Holmes checking amarble pillar for signs of corrosion!

•Notice his dress, this is what passed for PPE in Victorian times!

Page 4: Hydrofest 7 Pipeline Inspection

4

Why Inspect?•Car = Major asset, £10K’s

•You want to keep it in condition

•Retains value & operates well

•Maintenance = servicing

•Inspection = MOT

•MOTè Fit for purpose

•MOTè Road Tax & Insurance

If not maintained it’s:•Unreliable

•Not fit for purpose

•Fails the MOT

•Worth nothing

•Costs you money

•SORN & £1000 fine

•Delays you: walk or bus.

•Society (Government) recognises that cars must be fit for purpose &drivers have duty of care to the public

•Hence there are Acts & Statutory Instruments to ensure this happens.

•For cars this means: MOT, Insurance & Road Tax.

Page 5: Hydrofest 7 Pipeline Inspection

5

Why Inspect?:

•Major Asset worth £10 - £100M’s

•Owners have a vested interest to...

–Maintain pipeline in efficient condition.

–Duty of care: environment & marine users

•It will retain it’s value, less depreciation

•Sold on to next field owner / operator

•Just like you & your car

Huge downside if not in good condition:

•Contents may stop flowing or leak out!

–Environmental clean up

–Business Interruption

–X £1M’s DTI / HSE Fines

–X £10M’s lost production - daily

–X £???M’s Law suits, Litigation

•Pipeline operator has a vested interest in keeping the line in goodcondition.

•If the don’t the contents may stop flowing or even leek out!

•Just as the government has lawful MOT regulations for cars.

•So they have lawful regulations - statutory instruments - for pipelines.

•The MOT is actually the “Fitness for Purpose Assessment”, the FPA

Page 6: Hydrofest 7 Pipeline Inspection

6

Regulations

To ensure pipelines are maintained:

•Pipelines Safety Regulations, 1996.

=Statutory Instrument 1996/825

–Obligatory to keep lines in good condition.

–Must Inspect, Maintain & Repair.

–“Fit for Purpose Assessment” = MOT

–The pipeline is then insurable

–Just like your car

•The Ten Commandments, an early example of regulations.

•The rules governing inspection are the Pipeline Safety Regulations.

•Compulsory to keep pipelines in good condition.

•You must service them, like your car.

•That is you Inspect, Maintain & Repair them.

•The MOT for pipelines is the Fitness for Purpose Assessment.

Page 7: Hydrofest 7 Pipeline Inspection

7

• Various regulations• E.g. SI 1513• Complex• Ambiguous• Prescriptive• Open to interpretation

Pipelines Safety Regulations

• Pipeline Safety Regulations• = SI 1996 / 825• Aligned with HSWA• Simple• Goal setting: Clause 13• “The operator shall insure that

a pipeline is maintained in anefficient state, in efficientworking order and in goodrepair.”

• PSR facilitated:– Risk Based Inspection– Cost savings & efficiency– Innovative systems

Up to 1996: Post 1996:

•Up to 1996 there were various regulations including SI 1513.

•They were very prescriptive, open to interpretation and not working well.

•Regulations were revised and consolidated resulting in PSR - SI 1996/825

•Written so that it was aligned with the Health & Safety at Work Act 1974.

•This brought with it a shift from prescriptive to goal setting legislation.

•The crux of the PSR legislation is Clause 13 - a “one-liner”, 21 words.

•The legislation sets goals: I.e. prove the pipeline is in good condition.

•Owners have responsibility to put systems in place to achieve that.

•The new regulations enabled a move to Risk Based Inspection.

•Freed inspection contractors to provide solutions, systems, technology, andto innovate.

Page 8: Hydrofest 7 Pipeline Inspection

8

ABCDEFGH?JKL?NOPQ?STUVWXYZ

The IMR Cycle • RBI• IMR (Repair)• IMR (Routine)

Page 9: Hydrofest 7 Pipeline Inspection

9

• Allocate inspection effort where it is most effective & required.

• Explore alternative survey methods / strategies

• Permits new technology & innovation

• Customised IMR for each asset.

• Based on risk assessment, trend analysis & experience

•RBI: Risk Based Inspection

• An inspection regime such that you are confident the asset will bein the same condition at the next inspection interval.

• Permits flexibility & efficiency, cost effective solutions.

•This is one definition of a Risk Based Inspection - quite succinct, good.

•The move to RBI, facilitated by the Pipeline Safety Regulations 1996, wasliberating.

•It allowed the Operators, Integrity Managers and the survey / inspectioncontractors to develop suitable, cost effective & efficient, techniques andsystems.

•Importantly:- a Customised Inspection & Maintenance Routine means youdon’t have to inspect every component of the asset infrastructure every time.

Page 10: Hydrofest 7 Pipeline Inspection

10

Customised for each “asset”

• Cover asset infrastructure:- Wellheads- Platforms- Risers- SSIV’s- Pipelines- Umbilicals- Cables- Landfalls

• Links & nodes• Surface & subsea

IMR: Inspection & Maintenance Routine.

Sets out for each asset:

•Risks & probability•Pipeline anomaly criteria

•Types of inspection (Controls)+ Recommended:•Interval - each inspection type•Interval - each asset component

= planned inspection schedule.

They can be revised:•Through trend analysis.•Life cycle: new - mature - old(dead or even re-incarnated!)•Change of use

•IMR = document, customised for each particular asset.

•Describes all the infrastructure of an asset

•Notice - logical sets of structures - logical to use different inspectiontechniques.

•To create the IMR each component of the asset is risk assessed.

•Maximum conditions are set above which they are anomalous.

•The IMR is designed, based on:

-RBI philosophy

-Engineering - predicted deterioration of components

-Experience & Common sense.

Page 11: Hydrofest 7 Pipeline Inspection

11

InspectionMaintenance& Repair

Survey & Inspection Contractors:•Gather data•Report•Solution providers

Integrity Management Consultants:•Analysis & Assessment•Recommendations•Fit for Purpose?

Operators:•Accountable•PSR Clause 13•Manage Budget•£££’s & ITT

PSRRBIFPA

Inspection

Main

tena

nce Repair

Visual representation of how regulations & parties involved in IMR interact.

•Survey & Inspection Contractors survey & report pipeline conditions.

•Reporting according to condition & anomaly limits: anomalies.

•IMC’s assess the results & advise on pipeline condition.

•They issue the “Fitness for Purpose Assessment”

•Operators are accountable for pipeline integrity per Clause 13 of PSR 1996.

•Operators manage the cycle in the light of the recommendations.

•They set budgets for Inspection and invite bids to conduct Maintenance &Repair work as it is needed.

•Finally, we need someone to police the whole system and that is……

•The Health & Safety Executive inspectors = Traffic Warden.

•Seen here slapping an improvement notice on an Oil Exec’s car.

•Their experts will visit & audit IMC’s & operators and audit FPA’s.

•If they find things are not in order, they will issue an Improvement Notice.

•And they keep everyone on their ………..Toes.

•This is a closed loop - epitomises much of what happens in IMR.

•It is commonly called the IMR cycle

Page 12: Hydrofest 7 Pipeline Inspection

12

THE IMR CYCLE

Year on Year: GI Survey

GIYear 1

GIYear 2

Workscope

Inspection

Report

Assess IMRSchedule

Maintenance& Repair

Data

Year 1Anomalies

Anomalies

Start

Workscope

Inspection

Data

ReviewSchedule

Anomalies &Monitor Items

Report

Assess

Maintenance& Repair

2 Year Inspection Cycle - GI

•Consult the IMR

•Develop workscope, conduct inspection, acquire data.

•Assess data onboard the vessel.

•Determine anomalies (damage & conditions which threaten integrity)

•Report from the vessel (7 - 14 days)

•IMC’s then assess the data & make recommendations

•= Closed cycle

•Information from year 1 is carried into Year 2

•IMR Schedule plus year 1 findings determine Year 2 workscope.

•Reviewed & adjusted by IMC’s / Operators.

•Survey & Inspect - gather data.

•Determine anomalies & monitor items

•Monitor items = anomalies that are no longer anomalous but needmonitored

•Report from the vessel (7 - 14 days)

•IMC’s then assess the data & make recommendations

•= Closed cycle

Page 13: Hydrofest 7 Pipeline Inspection

13

THE IMR CYCLE

1 Year Cycle: GI then GVI Survey

GIYear 1

GVIYear 1

Workscope

Inspection

Report

Assess IMRSchedule

Maintenance& Repair

Data

Year 1 GIAnomalies

Anomalies

Start

Workscope

Inspection

Data

ReviewSchedule

Anomalies &Monitor Items

Report

Assess

Maintenance& Repair

1 Year Inspection Cycle - 2 Surveys, GI & GVI.

•Consult the IMR for GVI inspection requirements

•IMR Schedule plus year 1 GI findings determine year 1 GVI workscope.

•Written by inspection contractor.

•Reviewed & adjusted by IMC’s / Operators.

•Survey & Inspect - gather data.

•Assess data onboard the vessel.

•Determine anomalies & monitor items

•Report from the vessel (7 - 14 days)

•IMC’s then assess the data & make recommendations

•= Closed cycle

•Build up database of pipeline conditions that are assessed.

•Subsequent inspections: planned based on IMR schedule & historic data

Page 14: Hydrofest 7 Pipeline Inspection

14

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7

Day 8 Day 9 Day 10 Day 11 Day 12 Day 13 Day 14

Day 15 Day 16 Day 17 Day 18 Day 19 Day 20 Day 21

Day 22 Day 23 Day 24 Day 25 Day 26 Day 27 Day 28

Day 29 Day 30 Day 31 Day 32 Day 33 Day 34 Day 35

There are various cycles & feedback loops in the IMR cycle:

•Yearly

–By Inspection type

–Between inspection types.

When you are out inspecting, there is the daily cycle.

Which looks like this.

Page 15: Hydrofest 7 Pipeline Inspection

15

On Groundhog Day the people of Seaway Petrel consult Punxsutawney.

If he sees a shadow that means another 2 weeks of survey……………….

•= Groundhog day.

•Inspection can be a little bit repetitive………..

•But, inspection being inspection, there is always something that comesalong that is interesting.

Page 16: Hydrofest 7 Pipeline Inspection

16

UXO

•This certainly broke the daily cycle!

•This is a “UXO” anomaly, an unexploded object.

•A 3000 pound air dropped mine.

•Dropped sometime in the 1960’s.

•When we find one of these we:

–DO NOT touch it…..!

–Photograph it.

–Call the Royal Navy bomb squad.

–Make it stable - if it isn’t - we sand bagged this one.

–Stay on site until Navy or a guard boat comes out.

–If we’re lucky we see the explosion.

•There are some more UXO slides later.

•Other interesting thingss:

–Usually find 1 or 2 of towed sidescan & pinger fish each year.

–A coffin - assumed a burial at sea.

–Plenty of marine life: lobsters, big monkfish etc.

Page 17: Hydrofest 7 Pipeline Inspection

17

What is a Pipeline?In its simplest form a pipeline comprises:• Risers• Spoolpiece• Sealines• Landfall

There are analogies to human anatomy:• Pumping oil = heart• SSIV = valves• Pipeline = arteries• Umbilicals = nerves– electro - hydraulic umbilcals– fibre optic cables (optical nerve)

•The oilfield is not dissimilar to the human body

•It’s lifeblood is the flow of oil and / or gas through pipelines.

•Burst or clogged arteries are unhealthy as are burst or clogged pipelines.

•An SSIV is a subsea isolation valve, an automatic stop valve.

•They were made compulsory after Piper Alpha, 6/7/88.

•167 people lost their lives then.

•There is no better reason than that to inspect, maintain & repair.

•Safety is paramount.

Page 18: Hydrofest 7 Pipeline Inspection

18

Riser:Connects platformto sealine via aspoolpiece

Sealine (purple):The export pipeline connects riser /spoolpiece to processing facilities ashore

Landfall:The part of theexport pipeline inthe inshore zone

•Here is a diagram of a very simple pipeline system.

•It shows the 3 main sections of a pipeline.

•In reality oil & gas infrastructure is much more complex.

•“Pipeline” is a misnomer, we inspect linear & point features ofinfrastructure.

•There are many different types of point and linear features.

Page 19: Hydrofest 7 Pipeline Inspection

19

Risers can degrade rapidly due to• Instability• Current• Wave Action• Corrosion - electrical & chemical• Wave Action / Movement• Impact

Inspection options:• Above sea level - RATS• Splash Zone - RATS / divers• Subsea - DP Vessel & ROV’s• Subsea - Platform based ROV’s

RISERS

•The pipeline is at its most vulnerable in the splash zone.

•Subjected to alternative wet & dry cycles at different intervals.

•Tidal cycle (12 hour - diurnal) and wave cycle (seconds).

•Above the splash zone it is impacted by salty air.

•And also subjected to sunlight & temperature cycles & wind action.

•Which are the enemies of paint and the allies of corrosion.

•Riser is very susceptible to impact by supply vessel.

We also see the Rope Access Technicians at work.

•They inspect, clean, repair, maintain and lift heavy objects

•Usually to be found swinging from platforms or vertical cliff faces.

•It must be great when your job is your hobby!

•RAT inspection & intervention teams are an innovation:

–Safer than scaffolding - offshore scaffold operations are very dangerous.

–Quicker, more efficient

–They can get into places scaffolding can’t

–Cost effective solution.

Page 20: Hydrofest 7 Pipeline Inspection

20

SEALINESNorth Sea:• 20,000+km “pipeline”• = Linear features- Pipelines: gas & oil & water- Umbilicals - electric, hydraulic,

chemical elements.- Cables - electrical & fibre optic- Multifunction pipeline bundles

At risk from:• Anchors & Trawl gear• Instability• Current & Wave Action• Corrosion - electrical & chemical• Upheaval Buckling (expansion)• Munitions

Survey Platforms:– Vessel, usually “DP”– Plus ROV’s– Eyeball & Workclass

Main Types of Inspection :• GI = Acoustic sensors• GVI = Visual sensors

•There are thousands of km’s of pipeline in the north sea.

•Carry varying products, including water - injected for enhanced recovery.

•Some are still operating, efficiently & safely, beyond original lifecycle.

•Some 30+ years old, still operating due to over-engineering & good IMR.

•These are the main risks to which they are exposed.

•Unlike a car, you can’t wheel pipelines into a garage for inspection / MOT.

•You have to go out & look at them somehow.

•You need survey & sensor platforms: vessels & remotely operated vehicles.

•Usually the vessel will have “DP” capability, I.e. Dynamic Positioning.

•This permits “follow-sub” mode: I.e. “station-keeping” on the movingROV.

•It also facilitates a means of positioning the ROV.

•Sensors are mounted on the ROV which substitute for your eyes and ears.

•Knowing vessel & ROV position & attitude lets you position the sensors.

•Sensor data is then “added” to give you positioned pipeline condition data.

Page 21: Hydrofest 7 Pipeline Inspection

21

LANDFALLS• TOB to @ 3km offshore.• Through the inter-tidal zone.• Buried, rock-dumped or in conduit.= Protected

At Risk From• Anchors & Trawl gear• Munitions• Very Strong Currents• Wave Action - to seabed• Erosion / Deposition• Beach activities• Corrosion - chemical & electrical

Survey Platform:– Shank’s Pony– Inshore survey vesselSensors:• RTK back pack• Radio-detection tools• Innovation:- Divining rods• RTK, SVS, SBP, SSS• Divers, Mini ROV• CP (Trailing wire / snake)

•This is a professional landfall survey team, working very hard.

•PPE = work boots & sun-block!

•A pleasant way to spend a month in summer.

•Landfall is often defined as from top of beach to @ 3km offshore.

•The 3km offshore is not a hard and fast rule.

•In the southern north sea it’s the sort of safe distance that you cancomfortably bring a large vessel into the beach.

•Given that you are going to do an inshore survey with a suitable inshorevessel then why risk the large offshore vessel to unnecessary risk, hence3km.

•In some places a large vessel can get within 10’s of metres of the shoreline.

Page 22: Hydrofest 7 Pipeline Inspection

22

•Inshore, the effects of tidal forces are amplified by shallow water effects.

•Strong currents, erosion & deposition, long shore drift, high energy zone.

•Shallow water means waves impact on seabed: churning it up.

•It is not unusual to see 2 metres of seabed erosion between yearly surveys.

•Various cycles: diurnal tides, seasonal - winter storms, yearly.

•Currents: example here of Bacton, this shows 1.2ms = 2.3 knots.

•They can be a lot stronger than that, e.g Shetland - 7 knots in places.

•Surveyed once a year.

•What would you find if you:

–Monitored daily?

–Or before & after a storm.

–What impact will coastal defence policies have on east coast landfalls?

Page 23: Hydrofest 7 Pipeline Inspection

23

•A few examples of pipeline landfalls.

•LHS: landfall somewhere sunny, a perfect survey / inspection location.

•Top & Middle RHS: Landfall Shetland.

•We use divers at these locations due to local seabed topography & kelp.

•Acoustic methods can’t get through the kelp.

•Bottom RHS: Landfall somewhere with no Working at Height policy.

•You would not get away with this in the north sea = safety is paramount!

Page 24: Hydrofest 7 Pipeline Inspection

24

Survey / Inspection Methods

•This was probably taken in the 19th century sometime, somewhere.

•Maybe on the railroads in the wild west of America.

•The clothes may look daft to us but it is obvious that they are wearing workclothes fit for their activity, I.e. PPE, good for them.

•The instrument on the left is an astroblade.

•Today that would be an intergalactic, in line, roller skates or a rocketpowered skateboard.

•The tripod, table & telescope on the right is what was called a “PlaneTable”.

•Based on tacheometry, it is a fast method for conducting detailed survey.

•The present day equivalent would be the Total Station or RTK backpack.

•In the next few slides we’ll look at the main inspection modes: GI & GVI.

• GI = General Imaging = side scan sonar, acoustic inspection

•GVI = General Visual Imaging = cameras = visual inspection

•Plus the types of sensors utilised for each type of survey

Page 25: Hydrofest 7 Pipeline Inspection

25

Inspection Methods

Inspection Survey Platform Type / Method Component Notes / Restrictions

RATS Platform basedVisual - camerasNDT techniques Riser

Down to splash zoneWeather

DiverPlatform orDP vessel based

Visual - camerasNDT techniques

Riser

PipelinePoint structures

Landfalls

Depth, Current

Weather, Sea stateHSE

Landfall GI Inshore survey vesselHull mountedAccoustic

CP snake

Pipelines

Inshore only

Weather, tidesSeastate @ 1m

Fishing gear

Structural GVIOil platform orDP survey vessel3 X Eyeball ROV’s

Visual – camerasNDT techniquesFMD

LegsStructural members

Risers

WeatherSea state @ 2m

Current, Visibility

Pipeline GISurvey vesselROTV

Towed SSSAccoustic

Pipelines

Structures

Seafloor structures onlyCannot stop

Current restrictionsSeastate @ 2m

Pipeline GVIDP survey vesselWROV

DP follow sub

Visual – camerasCP

Riser

PipelineStructures

Current restrictions

VisibilitySeastate @ 4.5 – 5 m

This table summarises the common types of survey we have conductedhistorically.

•GI = General Imaging inspection = side scan sonar

•GVI = General Visual imaging = cameras

•NDT = Non Destructive Testing

•FMD = Flooded Member Detection

•CP = Cathodic Protection:

–A zinc anode is attached to the structure.

–It corrodes = oxidation, loss of electrodes = sacrificial anode.

–Structure protected by small electric current.

–CP inspection tool is basically a current meter.

–Proximity & contact tools determine milli-volts

–Determines the status of the CP system: is it working

Certain methods require a vessel with Dynamic Positioning capability:

•To keep station next to structures or relatively over a moving vehicle

•To position the subsea survey platform (ROV / Diver) & sensors

Page 26: Hydrofest 7 Pipeline Inspection

26

Inspection Methods

INSPECTION TYPE

GI GVI Combined

Survey Vessel: ü ü üDP r ü üüDGPS ü ü plus XP ü plus XP

Seapath r ü üGyrocompass ü ü üMRU r ü ü

Sensor Platforms: ROTV WROV WROV

OBS ROV OBS ROV

SENSOR PLATFORMS

Platform: ROTV OBS ROV WROV

Sensors: Accoustic only VisualVisual &

Accoustic

Responder Poor tracking ü üFluxgate compass ü ü üGyrocompass r r üMRU r r üSSS ü r üOAS r r üBathy r / ü ü üAltimeter r / ü r / ü üCameras r 1 maybe 2 3+

Lighting r ü üScanning Profilers r r üSwathe Bathy /Profiling

r r ü

CP Contact r ü üCP Continuous r ü üCTD Overside N/A ROV mounted

Manipulators r 1-limited2-multi

function

Historically - single mode GI or GVI inspection cruises:•GI - Spring - general inspection X sidescan•GVI - Summer - detailed inspection X camera

Fast ROV “GI”:•Facilitated by WROV & DP vessel combination•Increased SSS target accuracy < +/- 5m•Can stop & conduct GVI on detected damage•Can intervene if necessary•Multi-tasked cruises with GI & GVI capability

•GI: towed SSS survey, fish or ROTV, low tech, DP not necessary.

–Fast method of amassing general information about pipeline condition.

–Looking for spans, exposures, movement, large anomalies / damage.

–No detail on localised anomalies: cracks, bare metal

–Conducted at start of year - results used to plan GVI workscope.

•GVI: ROV sensor platform positioned by HiPAP / transponder system.

–Visual camera inspection plus accoustic sensors.

–Looking for detailed damage to pipelines & structures.

–Conducted in summer using information from the GI.

•The advent of fast ROV’s, Solo I & Solo II, along with custom built ROVsurvey vessels led to the fast ROV GI survey: speeds up to 8 km/hour.

–Importantly, the ROV / DP vessel combination lets you slow down & stop.

–I.e. you can conduct both inspection types on the same cruise.

–As long as you carry the correct sensors.

–Surveys have started to merge into combination GI / GVI inspections.

–Though still generally planned as GI & GVI.

Page 27: Hydrofest 7 Pipeline Inspection

27

Humber SurveyorSeaway Petrel - Hi-Tech

RRS Ernest Shackleton

SURVEY PLATFORMS

Old Survey Vessel

Seaway Petrel:

•State of the art ROVSV, built 2003.

•Dual Independent HiPAP 500 DP

•Fast RO: GI at @ 8kmh.

•Solo II survey WROV

•Internal ROV hangar

•Custom built Hydrolift launch facility

•Also carries Eyeball ROV

•Operations in sea state of 4.5m+

MV Humber Surveyor:

•Originally Firth of Forth Passenger Ferry

•Catamaran - operated by ABP

•Humber Estuary Survey vessel

•Utilised for inshore survey - landfalls

•Hull mounted sensors

Old Survey Vessel:

•Converted fishing vessel.

•ROTV survey vessel

•Superceded by FAST ROV solution

RRS Ernest Shackleton:

•Antarctic Research Vessel

•Ice breaker

•2005 GI / GVI cruise platform

“Survey Platform” = what you deploy your Sensor Platform from = vessel

Page 28: Hydrofest 7 Pipeline Inspection

28

SENSOR PLATFORMS

Solo II WROV New Tech.

SeaEye Lynx ROTV - Old Tech.

Solo II WROV New Tech.

Solo 2 WROV:

•Stolt Offshore

•Custom built GI & GVI fast WROV

•Weighs @ 6 tonnes

•GI speed to @ 8kmh

•Inspection & Intervention capability.

ROTV:

•Steerable frame with SSS transducers

•Superceded by Fast WROV solution

•Using Seaway Petrel & Solo II.

Lynx:

•Observation ROV

•1 forward looking camera

•Probably another camera on it.

•Manipulator - limited intervention

“Sensor platforms” = vehicle you deploy your sensors on..

Solo 2 Workclass Survey ROV:

•Good view of camera booms

•EM3000 mounts

•Stills cameras.

•Obstacle avoidance sonar

•Camera booms, cameras & lights

•No manipulators - not installed.

Page 29: Hydrofest 7 Pipeline Inspection

29

Combination GI / GVI Inspection Spread

Solo II Sensors:

•Responder - position via HiPAP

•Gyrocompass - heading

•MRU - pitch & roll

•Bathy Unit - depth below sea level

•Altimeter - height over seabed

•Pipetracker - track pipe & DOB

•Profilers / Swathe - cross profiles

•CP - Field gradient & potential

•GI SSS Systems - accoustic

•GVI Camera Systems - visual

•This is now the combination of survey & sensor platforms we conductinspection with, whether for GI or GVI.

•Someone, somewhere, at sometime during the survey is going to ask us toundertake GI when we are conducting GVI or vice versa.

•So we equip the vessel & ROV to accommodate both modes.

Page 30: Hydrofest 7 Pipeline Inspection

30

Petrel Online Survey

Petrel Online ROV

•This is the online ROV & Survey room on the Seaway Petrel

•The ROVERS always get the plushest chairs.

•A busy place when inspecting

RHS: Online survey station:•DGPS:–GPS receivers, Multifix 4–Decoders / demodulators

•NaviPac: positioning•NaviScan: sensor data logging•Helmsmans PC

•PC’s & surface control units for:–Profiler, E.g. TriTech–Swathe. E.g. EM3000–Bathy / Altimeter–Coda–Analogue & digital video control–Video encoders - digital video

•ROV camera monitors: port, centre, starboard

LHS: Online ROV:•L to R:•Co-pilot, pilot, inspection engineer seats.•ROV systems PC’s & monitors–Power management–System status, power, thrust etc.

•Video: 2 X 3 VCR banks - hot swap•Pipe-tracker control•Obstacle Avoidance Sonar (OAS)

•ROV camera monitors

Page 31: Hydrofest 7 Pipeline Inspection

31

Data Acquisition

The future of acquisition & processing?

Page 32: Hydrofest 7 Pipeline Inspection

32

Acquisition

First part of a process:

• Acquisition

• Processing

• Interpretation

• Assessment

• Reporting

Process System• Log sensor data = Network – NAS / RAID Unix• Log position & attitude data = NaviPac / NaviScan - Unix Servers = Acquisition

• Event & QC data (SSS / Video) = SSS – Coda= Video – Seamap / Visualsoft

• Capture anomaly images = Image grabs - Offline• Smooth position & bathy = Seamap – Offline• Smooth & event X-profiles = Seamap – Offline• Smooth long profiles = Seamap – Offline• Smooth & event pipetracker = Seamap – Offline• Apply tides = Seamap / PolPred - Offline• Merge events & position = Seamap – Offline• QC events = Seamap – Offline• Export PRISM Files = Seamap – Offline

= Processing & Interpretation

• QC PRISM Files = PRISM – Offline• Assign anomalies = PRISM – Offline• Assign monitor items = PRISM – Offline• Export Report Data = PRISM - Offline• Collate Reports = Word – Offline• IDC of Reports = C.Doc, onshore

= Reporting

Acquisition is the first part of a sequence of parallel and sequentialprocesses that form the A-P-I-A-R .

This table is a simplified version of the sequence.

Page 33: Hydrofest 7 Pipeline Inspection

33

Acquisition - Sensors

• Echo-sounder• Side Scan Sonar• Sub-Bottom Profiler

• Scanning Sonars• Scanning Profilers• Multibeam-swathe bathy

• Multibeam-profilers

Basics (very):• Transducers = underwater speakers & microphones.

• Sound pulses emitted, reflected & multiple return pulses timed.• 2 way travel time & speed of sound in water known.• Distances to reflectors calculated:- sets of data points.

• Referenced to sensor electrical centre• Sensors referenced on survey platforms via offsets• Vessel (DGPS) & ROV (HiPAP) position known

+ Platform attitude: heading & orientation data= Geospatial data set referenced by time (GPS 1 PPS signal)= Fixed in XYZ framework: geodetic reference system

Hull mountedEcho-sounderSwathe bathy

Towed SSS Towed SBP

These are the basics of acoustic inspection detection / positioning in nonetoo technical terms.

The import points are that:

•sensors collect discreet patterns of points / data

•These can be positioned, absolutely, through positioning of sensors &survey platforms.

•As long as they are synchronised.

Page 34: Hydrofest 7 Pipeline Inspection

34

Acquisition - Position DeterminationPlatform /System / Sensor Measures: Determines:

Survey VesselDGPS Systems = XYZ position = 1. GPS antenna position1. GPS Antenna Position+ Vessel Gyrocompass = Vessel bearing+ MRU5 = Vessel pitch & roll

+ Vessel offsets= XYZ separationGPS Ae. – HiPAP CRP

= 2. HiPAP CRP position

Origin for HiPAPXYZ measurement

2. HiPAP CRP position+ Vessel Gyrocompass = Vessel bearing+ MRU5 = Vessel pitch & roll+ HiPAP 500 range, vertical

& horizontal angles= XYZ separationHiPAP CRP – responder

= 3. ROV position(Responder)

The common link toposition ROV sensors

ROV3. ROV responder position+ ROV Gyrocompass = ROV bearing+ ROV MRU5 = ROV pitch & roll+ ROV Offsets to survey

sensors (SSS)= XYZ separationROV - ROV sensors

= 4. ROV Sensor positions(SSS Port / Starboard)

The common link toposition SSS targets

4. ROV Sensor positions+ ROV Gyrocompass = Bearing to SSS target+ SSS Altimeter = SSS – seabed height+ SSS slant target ranges = SSS – target slant range

= 5. SSS target positions

This is a more quantitative & qualitative version of the previous slide.

The point is that everything must be linked:

•Physically

•By time synchronisation

•By measurement

If this is in place the system becomes automated and massive data sets canbe recorded.

If you don’t achieve this, or miss something the data can be useless.

Page 35: Hydrofest 7 Pipeline Inspection

35

ROVSSS

ROVSensors

VesselSensors

VesselPosition

Depth,AltitudeHeading

Pitch & Roll

HeadingPitch & RollHiPAP XYZ

PositionEasting /NorthingOffsets

Online NaviPac / NaviscanFix, position, KP, time, gyro,depth, altitude, pitch & roll

DigitalSSSData

Online CODA

CODA WaterfallDisplays

Ultra 120Thermal Printer

CTD

SSSData

VG

A

Log CODA Data Log Data NaviPac / NaviScan

Network / Server:Working files: Coda Tag (Event) Files, Seamap, PRISM Files, Import / Export

Original Logged Data: SSS (Coda), Position & Sensor (ROV / Vessel)

Annotation

SIU4I/FBox

Port

Starboard

Trigger Trigger

Starboard

Port

Acquisition: Position & Sensor Data

This is a schematic diagram showing the acquisition of data & informationduring GI SSS inspection.

There are 2 elements of the system:

•Positioning & attitude data

•Sensor data

All acquired raw data is logged on networked mass data storage (NAS /RAID) and backed up to tape.

Page 36: Hydrofest 7 Pipeline Inspection

36

Data

Processing

This is what you can end up with if you don’t get data processing right!

Page 37: Hydrofest 7 Pipeline Inspection

37

Processing

CODA Event Tag FilesSeamap

Processing Seamap Processing

Network / Server:

OfflineEventing

OfflineEvent QC

Smooth Nav.Apply Tides

Import CodaEvent File

Merge CODANav & bathy

ExportEvent File

CODA(Geophysicists)

SEAMAP (PolPred)(Senior Data Processor)

QCEvent File

Export PRISM FileSSS ImageCapture

SpanList

SEAMAP(Senior Surveyor)

SpanAnoms

AssignAnomalies

AnomList

MIList

AssignMI No's.

Working files: Coda Tag (Event) Files, Seamap, PRISM Files, Import / Export

Original Logged Data: SSS (Coda), Position & Sensor (ROV / Vessel)

PRISM FileC/W Anom & MI's

PRISMFiles

Reports Co-ordinatorOnshore

PRISM Files,Images & Reports

CollateAsset Reports

QCPRISM Files

Geophysicists

Senior Surveyor

ConditionSummaries

AquisitionSummaries

APA Onshore

AssessedAnomalies & MI's

SpanAnalysis

DetermineMI's

QC'dAssessments

Reports Co-ordinator APA

IDCClean

DataSet

AssetReports

QC'dPRISM

ImportTag Files Seamap Processing

PRISM NetworkCustomerComment

AssetReports

PRISMFiles

Once the data is logged it has to be processed.

This involves:

•Eventing: SSS data & video data.

–Done digitally

–Data is replayed and the records are marked with electronic event tags.

•Smoothing of ROV position data

•Smoothing & eventing of X-profile data (GVI)

•Apply tides & smooth depth data (bathy / altimeter)

•Merge data sets by time stamp / event:

–Events

–Position

–X-profiles

–Bathy

•This is done using copies of the raw data, never work on original data.

•Raw data is regularly backed up to tape or other mass storage medium.

Page 38: Hydrofest 7 Pipeline Inspection

38

Step Process / Description LF From To TimescaleSSS Data Eventing1 Completed Tag / event Coda files Log file Geo's SGeo ASAP2 QC Coda Tag / event files 1 SGeo --- ASAP3 Merge QC'd Coda Tag / Events files 2 SGeo --- ASAP4 Transfer QC'd Coda Tag / Events files 3 SGeo SDP 12 hoursNav Data Processing5 Smooth Position Log file SDP --- ASAP6 Smooth bathy Log file SDP --- ASAP7 Create tide files Create file SS SDP ASAP8 Apply tides 7 SDP --- 12 hoursCoda Data Merge / Event QC9 Import Coda Tag / event files 4 SDP --- 1 hour10 Merge Coda with smoothed Nav. & bathy 9 SDP --- 1 hour11 Export Seamap event file 10 SDP SS 1 hour12 QC Seamap event file 11 SS --- 2 hoursAssign Anomalies & MI's13 Determine all anomalous events (excluding spans) 12 SS --- 2 hours14 Span list to APA (all spans) 13 SS APA 1 hour15 Anomalous span list from APA 14 APA SS 1 hour16 Assign anomaly No's to events & spans 15 SS --- 2 hours17 Anomaly list to APA & SGeo (numbered, with spans) 16 SS APA & SGeo 1 hour18 Determine MI's (numbered), List from APA 17 APA SS 24 hours19 Add MI numbers & details to Seamap Event file 18 SS SDP 3 hoursPRISM Export & QC20 Export PRISM files 19 SDP --- 1 hour21 QC (1st pass) PRISM files 20 SDP --- Instant22 Amend Seamap events & re-export PRISM file 21 SS / SDP RC 2 hours23 QC PRISM File: PRISM & Excel QC 22 RC --- 1 hour24 Amend PRISM file per results of Excel QC 23 RC / SDP RC 2 hoursCompile 2005 GI PRISM Dataset25 Capture SSS anomaly images 17 SGeo RC Ongoing26 SSS anomaly images to image directory 25 SGeo RC Ongoing27 Generate PRISM anomaly file (Anom's & MI's) 19 SDP RC 1 hour28 Cross check PRISM files / dataset for completeness 27 RC --- 2 hoursCollate 2005 GI Asset Reports29 KP Limits / work completed tables CSA SS / SGeo RC 24 hours30 Asset condition & anomaly summaries. CSA SGeo RC 24 hours31 Data acquisition summaries CSA SS RC 24 hours32 Weather Log CSA Sec RC 24 hours33 Results (Anomaly & MI tables) section 4 CSA RC RC 7 days34 Write, edit & check asset report 29 – 33 RC RC 7 daysAsset Report Check & Transmittal35 1st Pass QC check asset reports 34 WSR RC 12 hours36 Apply report corrections 35 RC RC 12 hours37 Email QC'd asset report to onshore co-ordinator 35 RC RC Onshore Instant38 Email QC'd PRISM data to onshore co-ordinator 28 RC RC Onshore Instant

•This does not have to be read in detail.

•This is a SSS survey internal deliverables process list

•There are 38 internal deliverable in this list.

•It’s here to indicate why:

–Everything must be time-synchronised.

–The survey process must have structure.

–Everyone involved must be very clear of their deliverables

–Everyone must know where & who they are getting data from

–Everyone must know where & who they sending their data to.

•This is all set out in the procedures.

Page 39: Hydrofest 7 Pipeline Inspection

39

Reporting

These are the reports co-ordinators.

Page 40: Hydrofest 7 Pipeline Inspection

40

Reporting - Deliverables

Deadlines:• Anomalies threatening integrity: immediate

• Significant features - 24hrs - daily call

From asset completion:• Anomalies - 7 days• Survey report - 4 weeks, including:– PRISM Files

– “Complete” Reports– “Single Pager”

To achieve these goals the reporting process must:• Automate repetitive tasks• Be fully auditable• Be systematic - no repetition

• Conduct QA & QC• Have a clearly defined structure from the start

•Any pipeline condition that may have an immediate threat on assetintegrity must be reported immediately.

•Every day there is a daily conference call - ship to shore - to discuss the last24 hours summary findings (after safety issues discussed).

•We work to a 4 week deliverables schedule for reporting: I.e. for deliveringa final, QC’d, collated report & QC’d PRISM files.

•The acquisition, processing & interpretation process delivers listings at anearly stage in the sequence. Because of this we provide simple listings asearly as we can. Hence the 7 day anomaly deliverable.

Page 41: Hydrofest 7 Pipeline Inspection

41

PRISM - Pipelines

•PRISM files are the main deliverable.

•PRISM = Pipeline Reporting Inspection System Multimedia.

•It is an interactive computer graphic representation of the pipeline.

•Evented pipeline conditions are indicated by suitable symbols.

•(Looks like some creative eventing here - fish, seahorse, toucan)

•An anomalous event is indicated by a red number.

•A monitor item is indicated by a negative - blue number.

•PRISM contains all of the pertinent data from the inspection.

•The slide shows the PRISM pipeline data sheet.

•Linked to the pipeline data are:

–Anomaly reports

–Inspection datasheets

–Profiles: long profiles & individual X profiles

–Photographs

–FHR’s - First hand reports

–Images: side scan data & video images.

–SSS & Video clipes

•PRISM is a database with flexible user defined reporting.

Page 42: Hydrofest 7 Pipeline Inspection

42

PRISM - Anomalies

•This is an example of anomaly data available through the pipeline datasheet

•RHS: Pictures of the anomaly

•LHS: Engineering assessment of the anomaly with recommendations.

Page 43: Hydrofest 7 Pipeline Inspection

43

PRISM - Self Configurable Reports

•PRISM is very flexible in its reporting output.

•The report control box - RHS is used to configure reports.

•KP limits to narrow the search / report

•Can look at:

–1 pipeline, 1 year

–1 pipeline, many years

–Multiple pipelines

–Select individual data: anomaly types / conditions

Page 44: Hydrofest 7 Pipeline Inspection

44

PRISM - Position Comparisons

•This is a PRISM pipeline plan position screen.

•The graphic shows 3 sequential years pipeline data.

Page 45: Hydrofest 7 Pipeline Inspection

45

PRISM - Structures

•This is the PRISM structural data sheet.

•Structural anomalies are represented on drawings by numbered hot spots.

•A linked set of drawings at various scales & component levels allows youto drill down into more & more detail.

•Linked with the anomaly hot spots are anomaly datasheets, reports, picturesetc.

Page 46: Hydrofest 7 Pipeline Inspection

46

PRISM Structures - Drill Down

•Example of the 1st level of drill down.

•The red numbers are the hot spots where you drill down further.

•Diagrams plus data boxes at the bottom of the screen.

Page 47: Hydrofest 7 Pipeline Inspection

47

Helmsmans Displays:Bridge: Fore & Aft,

Online, Offline, Solo I,Eyeball, Client Office,

Offshore Manager(VGA via CAT5)

HelmsmanOnline

COE PCOnline

NaviPacOnline

NaviScanOnline

From Workclass ROVCamera's (direct)

Video Overlay In

Port Starboard

Centre

Microphine

Coda DAOnline (Spare)

Coda DAOnline

From ROVSSS TransducersVia Ethernet Bottle

Solo ROVGyro, MRU, Bathy/Alt,Pipetracker, Profilers,

EM3000, CP

Digiboards Digiboard

3 X DGPS, HiPAP,Seapath, Gyro,

MRU, 1-PPS, CTD

Eyeball ROVPC

Eyeball ROVGyro, Bathy/Alt,

Camera, CP

Digiboard

Eyeball ROVCamera

VisualSoftDVR

Video overlay inVideo out

VisualSoft OfflineArchive

Eyeball videoOnline

DV SDLTTape Drive

DV RAIDVisualSoft Offline

Review

DVD Writer PortCentre

Starboard

PortCentreStarboard

VisualSoft OnlinePort Camera

VisualSoft OnlineStarboard Camera

VisualSoft OnlineCentre Camera

KVM

Keyboard Mouse

CODA OfflinePI No.1

CODA OfflinePI No.2

Survey SDLTTape Drive

Survey RAID

Online Video1GB Switch

Digital Video1GB Switch

Survey1GB Switch

PrinterMulti-feedScanner

Survey1GB Switch

Spare UNIX server

DP / Video Review

Keyboard Mouse

Main UNIX server

Senior DP

Keyboard Mouse

CODA1GB SWITCH

UltraThermalPrinter

UltraThermalPrinter

COE Server

COE NAS Box

CP Contractor PCOnline

APA PCOnline

CP to Video

Senior SurveyorCOE PC

CP to Video

CP from Solo I

Video - Port

Video - Centre

Video - StarboardCOE PC

(Video Grabb)

3 Way Switch

DV SDLTTape Drive

COE PCOffline (Insp Eng)

COE PC Online(Surv Tech - APA / CP)

COE PCOffline (Tech Rep.)

COE PCOffline (DP / Spare)

Printer

COE PCClient

COE PCSec. / MSO

Printer Single SheetScanner

COE PCOffshore Manager

Coda Waterfall Displays:Online, Offline, Solo I,

Client Office,Offshore Manager

VideoControl

VideoControl

VideoControl

Photocopier

Communications Clearcomms Internal Phone VSAT UHFBridge Yes Y e s Optional ExistingOffshore Manager Yes Y e s Yes ----Client Office Yes Y e s Yes YesOnline Yes Y e s Yes ----Solo I Yes Y e s (Share) ----Eyeball Yes Y e s ---- ----Offline Yes Y e s Yes ----

UPSKey

Systems

Portable USBStorage (X 4)

UPSKey

Systems

UPSKey

Systems

NaviPacTelegram

CP from Eyeball

NaviPacTelegram

ROV MonitorS'board

ROV MonitorCentre

ROV MonitorPort

Port Video Centre Video Starboard Video

Quad Camera Monitors:(3 Solo & 1 Eyeball Camera's)Bridge, Offline, Client Office,

Offshore Manager

Client Office - Fax

Survey Container

Solo I Control

Obs ROV Control

Wet / Dry Lab's

Client Office

Offshore Manager

•We have looked at data acquisition, processing and reporting.

•This is the survey spread for the combined 2005 GI / GVI Cruise.

•It is a schematic diagram of the systems required for:

–Data acquisition

–Interpretation & processing

–Reporting:

•Survey Platform: RRS Ernest Shackleton

•Sensor Platforms: WROV = Solo II & Lynx.

•120 days multi-function operations including:

–GI pipeline inspection

–GVI pipeline inspection

–CP Inspection

–Seabed structures spot dives

–Platform & riser inspection

–Platform 500m zone debris surveys

–Pipeline route corridor surveys

–Out of straightness survey

Page 48: Hydrofest 7 Pipeline Inspection

48

SomeExamples:•Anomalies•Data

C/O

The Reporters

No comment!

Page 49: Hydrofest 7 Pipeline Inspection

49

Sonar Image Pipeline Movement

•Sonar image - pipeline movement.

•Pipes can move by the action of currents

•They also expand & contract - moving much like a snake.

•The ridges are where sediment has built up beside the pipe before it hasmoved.

Note:

•displaced & intact stabilisation - mattresses.

•Fully exposed V buried pipeline

Page 50: Hydrofest 7 Pipeline Inspection

50

Processed Position Pipeline Movement

•This is the plotted position of the pipeline in the last sonar image.

•The top line is the original position of the pipeline “as-laid”

•The bottom line is where it has moved to.

•This was quite an impressive example of movement & the operator tookimmediate action to conduct remedial stabilisation work on the line.

Page 51: Hydrofest 7 Pipeline Inspection

51

A sample digital SSS image.

A & D shadows of where pipeline enters the structure - not anomalous.

B - pipeline

C - some snatch on the record - where there has been some pull on the fishor survey platform.

Page 52: Hydrofest 7 Pipeline Inspection

52

Sonar Image Upheaval Buckle

•This upheaval buckle was detected during a GI - acoustic SSS survey.

•This is classic SSS image of an upheaval buckle - it pokes you in the eye.

•It screams “anomaly” - we were ecstatic when we discovered it.

•As the GI survey platforms were DP survey Vessel & WROV it waspossible to stop and conduct GVI - visual inspection.

•The client took immediate remedial action - rock dumping.

Page 53: Hydrofest 7 Pipeline Inspection

53

GVI of Upheaval Buckle:

Top left:ROV on seabedLooking under pipeline.

Estimated height 4 metres.

•These are video grabs of the same upheaval buckle.

•Based on GI & GVI inspection & first hand reporting the client was able totake immediate action to remedy this anomaly.

Page 54: Hydrofest 7 Pipeline Inspection

54

Port, centre & starboard & suitable lighting & suitable camera angles.

E.g. Where there are spans you would back light with 1 camera to silhouettethe bottom of the pipe - cameras pointing inwards..

E.g. Movement - you would position cameras to look ahead to see sedimentridge build up - this can be 2 to 3 metres away from the pipe & you maymiss it on if cameras are looking inward.

Page 55: Hydrofest 7 Pipeline Inspection

55

Cross Profiling

Where a pipe is layed in a trench you may have to raise the profilers to seeover the spoil heap to the natural seabed.

Page 56: Hydrofest 7 Pipeline Inspection

56

CP Inspection Data

•This is a sample of CP data.

•It’s a black art.

•It’s obvious where the CP (Cathodic Protection) anomalies are though.

•CP values: contact & continuous are available in the CP data box on thePRISM pipeline data sheets.

Page 57: Hydrofest 7 Pipeline Inspection

57

Examples of damage:

•Top left: pipeline slipping through weightcoat.

•Top right: anchor damage - 20” pipeline, dragged 450 metres offline.

•Bottom left: anchor under 4 inch line - resulted in immediate remedialaction.

•Weightcoat loss around joint / weld - monitor.

Page 58: Hydrofest 7 Pipeline Inspection

58

•Close up of UXO shown earlier - air dropped mine.

•The tether is the silk parachute cord.

Page 59: Hydrofest 7 Pipeline Inspection

59

•And again, same UXO.

Page 60: Hydrofest 7 Pipeline Inspection

60

•Another UXO.

•Which ones the bomb & which ones the pipeline?

•Answer on last slide plus one!

Page 61: Hydrofest 7 Pipeline Inspection

61

•Close up of the last UXO c/w scale - 10 centimetre divisions..

Page 62: Hydrofest 7 Pipeline Inspection

62

(Back to) The Future

• PRISM on Internet (rolled out 2004)

• Live data to client PC via internet - video & SSS?

• Digital cameras to supercede analogue - when?

• = Another magnitude of data storage?

• Laser profilers?

• Move full reporting process onshore?

• Get rid of paper report?

• Greater emphasis on data rather than report.

• Digital cameras & software: new imaging techniques

• AUV’s for GI survey?

• Coastal defense policy - consequences of erosion?

• Intelligent infrastructure: build in inspection?

Page 63: Hydrofest 7 Pipeline Inspection

63

• Pipeline inspection is a mature business butcontinues to embrace new technology.

• Management of change: adapting to new systems.

• Digital age has almost eclipsed the analogue age.

• Days of pure GI / GVI cruises gone: the multi task GI/ GVI cruise is here.

• Client (in the office) is getting closer & closer to liveraw data.

• Control of multiple surveys through one contractorproduces consistent results

• Inspection / survey must be fun!

Conclusions

Page 64: Hydrofest 7 Pipeline Inspection

64

? NSPECT ? ON,MA ?

NTENANCE & REPA ? R

•To continue on the “Catchphrase” / pictorial pun theme.

•Here is the last offering.

•= “We are the eyes in Inspection, Maintenance and Repair.”

Page 65: Hydrofest 7 Pipeline Inspection

65

No difficultones!

AnyQuestions????????????????????????????????????????????????????????