99
By :- Rakesh kumar Assistant professor Electrical Engineering Department.

Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Embed Size (px)

Citation preview

Page 1: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

By :-Rakesh kumarAssistant professorElectrical Engineering Department.

Page 2: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 3: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 4: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

It plays very important role in the development of country.

It provides power at cheapest rate. About 20% of the total world power is generated using

hydro power plants.

Page 5: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

1. Fuels.

2. Energy storage of water.

3. Nuclear energy.

4. Wind energy.

5. Tidal energy.

6. Solar energy.

7. Geothermal energy.

8. Thermo electric power

Page 6: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Thermal Power Generation system.

Hydro electric Power Generation system.

Nuclear Power Generation system.

Diesel Power Generation system.

Non conventional energy power Generation system.

Page 7: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 8: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

8http://www1.eere.energy.gov/windandhydro/hydro_how.html

Page 9: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Meteorology◦ Study of the atmosphere including

weather and climate. Surface water hydrology

◦ Flow and occurrence of water on the surface of the earth.

Hydrogeology◦ Flow and occurrence

of ground water.

Watersheds

Page 10: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Hydrology may be defined as the science which deals with the depletion and replenishment of water resources. It deals with surface water as well as ground water. It is also concerned with transportation of water from one place to another.

MASS CURVE Mass curve is the graph of cumulative values of water

quantity against time.

Page 11: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

◦ There are many types of hydrographs. Hydrograph is defined as a graph showing discharge of flowing water with respect to time for a specified time.

Page 12: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Graph of stream flow vs. time Obtained by means of a continuous recorder which

indicates stage vs. time (stage hydrograph) Transformed to a discharge hydrograph by application of

a rating curve. Typically are complex multiple peak curves Available on

the web.

Page 13: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

storm of Duration Dstorm of Duration D

Precipitation

P

Discharge

Q baseflowbaseflow

peak flowpeak flow

new baseflownew baseflow

Time

tp

w/o rainfallw/o rainfall

tl

Page 14: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

If we measure the rainfall and put it on a time graph and link that to the amount of water in the river, we have some really useful information!

This graph is hydrograph. It plots rainfall against discharge (that is the amount of water in the river as it passes a particular point measured in cubic metres per seconds or cumecs).

Changes measured over time is river regime - eg. in winter there is more rain, less evaporation, less vegetation to absorb it.

Page 15: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Rate of flow at any instant during the duration period. Total volume of flow upto that instant as the area under

hydrograph denotes the volume of water in that duration.

The mean annual run-off. The minimum and maximum run-off for the year.

Page 16: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Flow duration curve is a useful form to represent the run-off data for the given time. This curve is plotted between flow available during a period versus the fraction of time.

The flow duration curve is drawn with the help of hydrograph from the available run-off data and is necessary to find out the time duration for which flows available .

Page 17: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

The potential is about 84000 MW at 60% load factor spread across six major basins in the country.

Pumped storage sites have been found recently which leads to a further addition of a maximum of 94000 MW.

Annual yield is assessed to be about 420 billion units per year though with seasonal energy the value crosses600 billion mark.

The possible installed capacity is around 150000 MW (Based on the report submitted by CEA to the Ministry of Power)

Page 18: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

The proportion of hydro power increased from 35% from the first five year plan to 46% in the third five year plan but has since then decreased continuously to 25% in 2001.

The theoretical potential of small hydro power is 10071 MW. Currently about 17% of the potential is being harnessed. About 6.3% is still under construction.

Page 19: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

NAME STATA CAPACITY (MW)

BHAKRA PUNJAB 1100

NAGARJUNA ANDHRA PRADESH 960

KOYNA MAHARASHTRA 920

DEHAR HIMACHAL PRADESH 990

SHARAVATHY KARNATAKA 891

KALINADI KARNATAKA 810

SRISAILAM ANDHRA PRADESH 770

Page 20: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 21: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Canada, 341,312 GWh (66,954 MW installed) USA, 319,484 GWh (79,511 MW installed) Brazil, 285,603 GWh (57,517 MW installed) China, 204,300 GWh (65,000 MW installed) Russia, 173,500 GWh (44,700 MW installed) Norway, 121,824 GWh (27,528 MW installed) Japan, 84,500 GWh (27,229 MW installed) India, 82,237 GWh (22,083 MW installed) France, 77,500 GWh (25,335 MW installed)

21“Hydroelectricity,” Wikipedia.org

Page 22: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

DAM TURBINE

POWER HOUSE

INTAKE

GENERATOR

PENSTOCKRE

SE

VO

IR

POWER LINE

TRANSFORMER

Page 23: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Water from the reservoir flows due to gravity to drive the turbine.

Turbine is connected to a generator.

Power generated is transmitted over power lines.

Page 24: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

A water turbine that convert the energy of flowing or falling water into mechanical energy that drives a generator, which generates electrical power. This is a heart of hydropower power plant.

A control mechanism to provide stable electrical power. It is called governor.

Electrical transmission line to deliver the power to its destination.

Page 25: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Large plants : capacity >30 MW Small Plants : capacity b/w 100 kW to 30 MW Micro Plants : capacity up to 100 kW

Page 26: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Pico hydroelectric plant.◦ Up to 10kW, remote areas, away from the grid.

Micro hydroelectric plant ◦ Capacity 10kW to 300kW, usually provided power for small

community or rural industry in remote areas away from the grid.

Small hydroelectric plant. ◦ Capacity 300kW to 1MW

Mini hydroelectric plant. ◦ Capacity above 1MW

Medium hydroelectric plant.◦ 15 - 100 MW usually feeding a grid.

Large hydroelectric plant.◦ More than 100 MW feeding into a large electricity grid.

Page 27: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

• CLASSIFICATION BASED ON HEAD.

A. High head plant ( < 300 m.)

B. Medium head plant. (60m to 300 m.)

C. Low head plant. ( > 60m.)

• CLASSIFICATION BASED ON WATER CONDITION.

A. Flow of water plant.

B. Storage of water plant.

C. Pump storage water plant.

Page 28: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Many creeks and rivers are permanent, they never dry up, and these are the most suitable for micro-hydro power production.

Micro hydro turbine could be a water-wheel turbine, Pelton wheel. (most common turbine).

Others : Turgo, Cross-flow and various axial flow turbines.

Page 29: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Head ◦ Water must fall from a higher elevation to a lower one to release

its stored energy. ◦ The difference between these elevations (the water levels in the

forebay and the tailbay) is called head. Dams: Are of three categories.

◦ high-head (800 or more feet)◦ medium-head (100 to 800 feet)◦ low-head (less than 100 feet)

Power is proportional to the product of head x flow

29http://www.wapa.gov/crsp/info/harhydro.htm

Page 30: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Large-hydro◦ More than 100 MW feeding into a large electricity grid.

Medium-hydro◦ 15 - 100 MW usually feeding a grid.

Small-hydro◦ 1 - 15 MW - usually feeding into a grid.

Mini-hydro ◦ Above 100 kW, but below 1 MW.

Micro-hydro ◦ From 5kW up to 100 kW ◦ Usually provided power for a small community or rural industry in

remote areas away from the grid. Pico-hydro

◦ From a few hundred watts up to 5kW.◦ Remote areas away from the grid.

Page 31: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

• Classification based on operation.

A. Manual plant.

B. Automatic plant.

• Classification based on type of load.

A. Base load plant.

B. Peak load plant.

Page 32: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

1. Reservoir.

2. Catchments area.

3. Dam.

(a) Earthen dam.

(b) Masonry dam.

(c) Concrete dam.

4. Spill ways.

5. Screen.

6. Fore bay or Intake.

Page 33: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

7. Tunnel.

8. Penstock or pipe line.

9. Surge tank.

10. Draft tube.

11. Tail race.

12. Fish passes.

13. Turbine.

Page 34: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

1.High head schemes.

2.Medium head schemes.

3.Low head schemes.

Page 35: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

1.High head schemes. (Impulse turbine, pelton wheel)

2.Medium head schemes. (reaction turbine )

3.Low head schemes. (propeller turbine )

Page 36: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Used in remote locations in northern Canada

Page 37: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 38: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

38

base load capacity◦ Water flows downhill during day/peak periods

Typical efficiency of 70 – 85%Completed 1967 Capacity – 324 MW

◦ Two 162 MW units. Purpose – energy storage

◦ Water pumped uphill at night Low usage – excess

Page 39: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

There is substantial increase in peak load capacity of plant at comparatively low capital cost.

There is an improvement in the load factor of plant. Load on hydro-electrical plant remains uniform.

Page 40: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Name Country YearMax

GenerationAnnual

Production

Three Gorges China 2009 18,200 MW

Itaipú Brazil/Paraguay 1983 12,600 MW 93.4 TW-hrs

Guri Venezuela 1986 10,200 MW 46 TW-hrs

Grand Coulee United States 1942/80 6,809 MW 22.6 TW-hrs

Sayano Shushenskaya Russia 1983 6,400 MW

Robert-Bourassa Canada 1981 5,616 MW

Churchill Falls Canada 1971 5,429 MW 35 TW-hrs

Iron Gates Romania/Serbia 1970 2,280 MW 11.3 TW-hrs

40

Ranked by maximum power.

“Hydroelectricity,” Wikipedia.org

Page 41: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Arch Gravity Buttress Embankment or Earth

Page 42: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

FIRST ELEMENT :-

DAMS

Page 43: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Arch shape gives strength Less material (cheaper) Narrow sites Need strong abutments

Page 44: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Weight holds dam in place.

Lots of concrete. (expensive)

Page 45: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Face is held up by a series of supports.

Flat or curved face.

Page 46: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

46Boyle, Renewable Energy, 2nd edition, Oxford University Press, 2003

Page 47: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Head Pressure

High Medium Low

Impulse PeltonTurgo

Multi-jet Pelton

CrossflowTurgo

Multi-jet Pelton

Crossflow

Reaction   FrancisPump-as-Turbine

PropellerKaplan

Boyle, Renewable Energy, 2nd edition, Oxford University Press, 2003

Page 48: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Francis TurbineKaplan TurbinePelton TurbineTurgo TurbineNew Designs

Page 49: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Specific speed; high specific speed is essential where head is low.

Rotational speed; Efficiency; Part of load operation; Cavitations; Disposition of turbine shaft; Head;

Page 50: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 51: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 52: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Reaction Turbines◦ Derive power from pressure drop across turbine.◦ Totally immersed in water.◦ Angular & linear motion converted to shaft power.◦ Propeller, Francis, and Kaplan turbines

Impulse Turbines◦ Convert kinetic energy of water jet hitting buckets.◦ No pressure drop across turbines.◦ Pelton, Turgo, and crossflow turbines

Page 53: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 54: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 55: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 56: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 57: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Uses the velocity of the water to move the runner and discharges to atmospheric pressure.

The water stream hits each bucket on the runner. High head, low flow applications. Types : Pelton turbine, Turgo turbine

Page 58: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Uses the velocity of the water to move the runner and discharges to atmospheric pressure.

The water stream hits each bucket on the runner. No suction downside, water flows out through turbine housing

after hitting. High head, low flow applications. Types : Pelton wheel, Cross Flow

Page 59: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Combined action of pressure and moving water. Runner placed directly in the water stream flowing over

the blades rather than striking each individually. Lower head and higher flows than compared with the

impulse turbines.

Page 60: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 61: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

It is run-of-river power plant. Do not worry about the turbidity of water. There is no danger of cavitations. It is simple to construct, repaired and maintenance.

Page 62: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

The slow rotation of chain turbine leads to high speed ratios when connect to generator at 600 rpm – 1500 rpm.

This chain turbine operation is very noisy. Structure of turbine is very big.

Page 63: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 64: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Nozzles direct forceful streams of water against a series of spoon-shaped buckets mounted around the edge of a wheel.

Each bucket reverses the flow of water and this impulse spins the turbine.

Page 65: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Suited for high head, low flow sites.

The largest units can be up to 200 MW.

Can operate with heads as small as 15 meters and as high as 1,800 meters.

Page 66: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Kaplan Francis Pelton Turgo

2 < H < 40  10 < H < 350 50 < H < 1300 50 < H < 250

(where H = head in meters)

Page 67: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 68: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 69: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Construction of Turbine.Construction of Turbine.

InletInletOutletOutlet

Impulse turbine for High head plant.

Page 70: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Medium head plant

Medium head plant

Page 71: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 72: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Propeller turbine for low head plant.

Page 73: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 74: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 75: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 76: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Its function is to prevent sudden increase of pressure in the supply line or in the penstock. It is placed as near as possible to the turbine.

Water hammer Due to the variation in the demand of water supply according

to load, the turbine gates get closed suddenly which cause increase in pressure. This is known as water hammer.

Page 77: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 78: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 79: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant
Page 80: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Tailraces:-Tailraces:-

Page 81: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

What is the function of Spill ways?What is the function of Spill ways?

Page 82: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

1. The plant is simple in construction ,robust and required low maintenance.

2. It can be put in the service instantly.

3. It can respond to changing loads without any difficulty.

4. There are no stand by losses.

5. The running charges are very small.

6. No fuels is burnt.

7. The plant is quite neat and clean.

8. The water after running the turbine can be used for irrigation and other purpose.

Page 83: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

1. The capital cost of generators, civil engineering work etc is high.

2. High cost of transmission lines.

3. Long dry seasons may effect the delivery of power.

Page 84: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

1. sufficient quantity of water at a reasonable head should be available.

2. The site should allow for strong foundations with minimum cost.

3. There should be no possibility of future source of leakage of water.

4. The selected site should be accessible easily.

5. There should be possibility of stream diversion during construction period.

6. The reservoir to be constructed should have large catchments area, so that the water in it should never fall below the minimum level.

Page 85: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Environmental Benefits of Hydro power plant.• No operational greenhouse gas emissions.

Non-environmental benefits– flood control, irrigation, transportation, fisheries and tourism.

Page 86: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

The loss of land under the reservoir. Interference with the transport of sediment by the

dam. Problems associated with the reservoir.

◦ Climatic and seismic effects.◦ Impact on aquatic ecosystems, flora and

fauna.

Page 87: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

A large area is taken up in the form of a reservoir in case of large dams.

This leads to inundation of fertile alluvial rich soil in the flood plains, forests and even mineral deposits and the potential drowning of archeological sites.

Power per area ratio is evaluated to quantify this impact. Usually ratios lesser than 5 KW per hectare implies that the plant needs more land area than competing renewable resources. However this is only an empirical relation.

Page 88: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Capture of sediment decreases the fertility downstream as a long term effect.

It also leads to deprivation of sand to beaches in coastal areas.

If the water is diverted out of the basin, there might be salt water intrusion into the inland from the ocean, as the previous balance between this salt water and upstream fresh water in altered.

It may lead to changes in the ecology of the estuary area and lead to decrease in agricultural productivity.

Page 89: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

It is believed that large reservoirs induce have the potential to induce earthquakes.

In tropics, existence of man-made lakes decreases the convective activity and reduces cloud cover. In temperate regions, fog forms over the lake and along the shores when the temperature falls to zero and thus increases humidity in the nearby area.

Page 90: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

HQP

HQgP

10

P = power in kilowatts (kW) g = gravitational acceleration (9.81 m/s2) = turbo-generator efficiency (0<n<1) Q = quantity of water flowing (m3/sec) H = effective head (m)

Page 91: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Non –toxic dust Sulphurous anhydride Carbon monoxide Nitrogen dioxide Soot (fly ash) Hydrogen sulphide

Pollution can be define as the contamination of soil, air and water with undesirable amount of material and heat.

Page 92: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Acid rain; the rain which contain acid as its constituents, brings all the acid down from high above the environment.

Contaminant; it is the another name of pollution. It is undesirable substances which may be physical, chemical or biological.

Pollutant; these are undesirable substances present in the environment these can be NO2, SO2, CO2,smoke,salt, bacteria.

Page 93: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Greater reliability of supply to the consumers. Avoid complete shut down. The overall cost of energy per unit of an interconnected

system is less. There is a more effective use of transmission line facilities. Less capital investment required. Less expenses on supervision, operation and maintenance.

Page 94: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Due to limited generating capacity diesel power stations is not suitable for base load plants. Nuclear power stations is not suitable for peak load plants. Incremental rate curve shows that as output power

increases, cost of plant also increases.

Page 95: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Flat rate tariff; by estimating load factor and diversity factor for various uses of electricity, we may merge the equitable contributation to the fixed charge of a particular class of consumers with each KWH consumption, the resultant tariff is a Flat rate tariff .

Two part tariff; total charge is split into two components i.e. a fixed charge depend upon the maximum demand and a variable charge based upon the energy consumption.

Page 96: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Block rate tariff; using this tariff, the fixed charge is merged into the unit charge for one or two blocks of consumption, all units in excess being charged at low unit rate.

Maximum demand tariff; these tariff differ from two part tariff only in the sense that maximum demand is actually measured by a demand indicator instead of assessing it merely on the bases of ratable value.

Power factor tariff; power factor tariffs are devised to make a distinction between overall charge per unit to be recovered from two types of consumers, one having a good power factor and the other having a poor power factor.

Page 97: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

Wind power plants is least reliable, and hydro power plants are most reliable.

The power output from hydro power plant depends on discharge, head and system efficiency.

The power output from hydro power plant in KW is given by0.736Qwhή/75 In hydro power plant the operating cost is low but the initial

cost is high. Gross head of an hydro power station is the difference of

water level between in the storage and tail race.

Page 98: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant

The flow duration curve at a given head of hydro power plant is used to determine total power available at the site.

The draft tube is provided to increase the acting head on the water wheel.

For low head power plants kaplan turbines are used. For high head and low discharge power plants pelton wheel

turbines are used. The specific speed (Ns) of a turbine is given by Ns=N√P/H1.25

The specific speed (Ns) of a turbine is the speed at which the turbine develops unit horse power at unit head.

Page 99: Hydro-electric power plant BABA HIRA SINGH BHATTAL INSTITUTE OF ENGINEERING AND TECHNOLOGY LEHRAGAGA- 148031 DISTT.SANGRUR (Pb.) By :- Rakesh kumar Assistant