Hyderabad Metro Rail Project - A case study

Hyderabad Metro Rail Project

Embed Size (px)

Citation preview

Page 1: Hyderabad Metro Rail Project

Hyderabad Metro Rail Project

- A case study

Page 2: Hyderabad Metro Rail Project

Topics• Metro Network• Financial Aspects • Sub-structure

- Foundation• Super structure

- Piers, Bearings, Pre-Cast Segments• Station Concept• Rolling Stock• Automatic Train Operation

(ATO)• Summary

Page 3: Hyderabad Metro Rail Project

Metro Network

MIYAPUR

L B NAGARFALAKNUM

A

JBS

NAGOLE

SHILPARAMAM

CORRIDOR I - REDCORRIDOR II - GREENCORRIDOR III - BLUE

Page 4: Hyderabad Metro Rail Project

Financial Aspects

Total cost of Project Rs.14,320 Cr.Central GOVT 10% of Total cost

L&T Metro Rail Hyderabad limited Remaining Total cost

State GOVT (Telangana) Ready to bear the extra cost

State GOVT (Andhra Pradesh) 0%

• Initially allotted to MAYTAS, but, was cancelled due to delay in Financial closure.

• Allotted to L&T in PPP mode, DBFOT basis.

Page 5: Hyderabad Metro Rail Project

Structure - Overview

Page 6: Hyderabad Metro Rail Project

Foundation

• Soil Investigation• Shifting of Services and Amenities• Foundation • Open

foundation• Pile

foundation

Concrete/ Rock Breaker

VibratorCompactor

Page 7: Hyderabad Metro Rail Project

Pile driving equipment

Page 8: Hyderabad Metro Rail Project

Piers

Boom Placer

Transit Mixer

Shuttering

• Inner surface of Formwork coated with ‘Mould Releasing Agent’; to prevent adhesion of Concrete to the Formwork.

SecurityBarricade

Page 9: Hyderabad Metro Rail Project

Piers (Contd.)

Piers Total distance covered 72 KMTotal no. of piers 2748Piers in corridor – I 1109Piers in corridor – II 588Piers in corridor – III 1051Piers completed till now 1635

Piers

Page 10: Hyderabad Metro Rail Project

Bearings

• Bearings are used for resisting the rotatory loads

Bearings

Page 11: Hyderabad Metro Rail Project

Pre-Fabrication

• Piers hold the viaduct, this is done by stringing and sticking the Segments together.

Segments

Gantry and Travel for Lifting andLoading Segments in the Yard

Page 12: Hyderabad Metro Rail Project

Pre-Cast Segments

• In gen, 10 Segments between 2 Piers, each Segment about 40 Tons.• Placing Viaduct Segments with the help of Launching Gantry.

Launching Gantry

Viaduct Segmentsunder-slung duringSticking and Stitching process

Slings for holdingViaduct Segments

TravelerFor LiftingAnd ShiftingSegments

VIADUCTVIADUCTP

IER

Page 13: Hyderabad Metro Rail Project

Pre-Cast Segments (Contd.)

Sticking the Pre-Cast Segments

Application of Epoxy on surface of Segment

Page 14: Hyderabad Metro Rail Project

Pre-Cast Segments (Contd.)

Stringing of Pre-Cast Segments

Stringing Cable

Duct in Pre-Cast Segment

Page 15: Hyderabad Metro Rail Project

Station Concept

• The Stations, being windows to the Metro Service, are tastefully designed reflecting local culture.

Uppal stationInterior view of station

Page 16: Hyderabad Metro Rail Project

Station Concept (Contd.)

Station Design

• Stations are covered by an overlapping roofing system, open at sides, covering the platform

• Staircases & Escalators designed based on • Architectural Elements • Functional Aspects.

Page 17: Hyderabad Metro Rail Project

Rolling Stock

• LTHMR has given Rolling Stock contract to Hyundai Rotem Company (South Korea).

• Total 57 Three-Car Train Sets.Measurement of car

21.7 X 2.9 X 3.8 (meters)

Material of car Stainless steelGauge length 1435 mmMax. Design Speed 90 Km/hSignal System ATO/ATPCapacity (per train set)

126 seats

Power supply 25 KV ACRolling Stock

Page 18: Hyderabad Metro Rail Project

Automatic Train Operation (ATO)

Train controls

Interior view

• LTHMR has given the Communication Based Train Control (CBTC) system to The Thales Company .

• Thales will Design, Build, Deliver and Manage the installation of the fully automated CBTC.

Page 19: Hyderabad Metro Rail Project

Summary

• Faster : - Journey Time Reduced

• Greater traffic capacity equivalent to:• 7 lanes of Bus Traffic (or) • 24 lanes of Car Traffic

• Low Energy Consumption per Passenger Km:• 20% only in comparison to Road-based

Systems.

• Eco-Friendly :• Air Pollution Nil• Sound Pollution Negligible

Page 20: Hyderabad Metro Rail Project

Development never ENDS