    StandaloneHyCatorTM:BFPReactorSystemforBiofoulingpreventioninCoolingTowerwaterCaseStudy1

    Chemical treatment costwas high and the plantmanagementwas under pressure to reducewaterusageanddischarge.Cycleofconcentrationwasalso low.Ahardscaleoften formed in thesummerseason.Thebacterialcountswere105cfu/ml.

    HyCatorTM: BFP reactor system was installed in the cooling tower circuit. A detailed study was

    conductedon thecooling towersystemoversixmonthperiod toevaluate theperformanceof the

    devicefordisinfection,scaling,corrosion,cyclesofconcentrationandheattransferefficiency.

    Performanceexceedscustomersexpectations.Makeupconsumptionhasbeenreducedby30%and

    blow down discharge reduced over 60%. Bacterial microbial counts become nil and cycles of

    concentrationsubstantiallywas increased.Theresultsalso indicatedthattheHyCatorTM:BFPreactor

    systemtreatmentperformedwellcomparedtothechemicaltreatmentwithoutaddinganychemicals.

    Inthisparticularcasedosageofanticorrosionandscalepreventionchemicalswasalsonotrequired.

    Annualwater saving exceed 3600m3. The costofHyCatorTM:BFP reactor system is economical in

    termsof

    operational

    costs

    with

    pay

    back

    period

    of

    less

    than

    2yrs;

    and

    it

    needs

    very

    limited

    maintenance.

    CaseStudy2

    Themainproblemwashighblowdownwaterandbiofouling.Thecoolingtowerwasoperatedatlowcycleofconcentration(3.0).

    After

    the

    successful

    installation

    of

    HyCator

    TM

    :

    BFP

    reactor

    system,

    the

    biocides

    dosing

    reduced

    to

    10

    %

    andotherchemicals(dispersant,corrosion inhibitorandantiscalent)reducedto40%oftheoriginal.

    Thebacterialcountscomedownunderthepermissible limit.Blowdownhasbeenreduced40%and

    Cycleofconcentrationisalsomarginallyincreased.Oldscalewasgraduallyremovedandnonewscale

    formed.

  • 7/27/2019 HyCator_CaseStudy_BFP

    2/7

    HyCa Technologies Pvt Ltd176, Udyog Bhavan, Sonawala Road, Goregaon (E), Mumbai 400 063 INDIAPh: +(91) (22) 2566 8037 Web: www.hycator.com Email: [email protected]

    HyCaTe

    chnol

    ogies

    Casestudy3

    Thevolumeofmakeupanddischargewaterwashighanditwasoperatedalowcycleofconcentration.Biofoulingwasalsohigh.Biofoulingwasfullycontrolledafterthe installationofHyCator:BFPreactorsystem.Thescaleand

    corrosion is also reduced over previous chemical treatment. Cycle of concentration also increase

    resultedinareductionof25%inmakeupwaterand50%inblowdownwater.

    The customer saved hugemoneyby installing theHyCator: BFP reactor systemwhich resulted a

    payback period of less than 2 years. After the successful installation, the second HyCatorTM: BFP

    reactorsystem

    has

    also

    been

    installed

    in

    another

    cooling

    tower

    at

    the

    same

    site.

    Representativeimage

    of

    standalone

    HyCator:

    BFP

    reactor

    system

    supplied

    to

    one

    of

    the

    reputed

    agrochemicalcompanyinIndia.ThesnapshotaboveshowsaHyCator:BFPreactorwithacentrifugal

    pump and an electricmotor. (Please note,each standaloneHyCator:BFP reactor unit is custom

    made equipment based on particular flow rate, pressure and other various parameters at actual

    coolingtowersite)

  • 7/27/2019 HyCator_CaseStudy_BFP

    3/7

    HyCa Technologies Pvt Ltd176, Udyog Bhavan, Sonawala Road, Goregaon (E), Mumbai 400 063 INDIAPh: +(91) (22) 2566 8037 Web: www.hycator.com Email: [email protected]

    HyCaTe

    chnol

    ogies

    Principle

    Decreasing the pressure over the liquid to its vapor pressure generates vapor bubbles in

    liquid.This isalsocalledascavitationorcoldboiling.When thepressure isbroughtback tonormal

    pressurethesevaporousbubblescollapsebackinwaterwithabangtogenerateintensepressureand

    temperature

    at

    the

    point

    of

    collapse.

    Such intenseconditions(9000atmand5000K, intenseturbulence)canbringaboutseveral

    physicalandchemicaltransformationsevenwhenthebulkconditionsareambient.

    HyCa technologies have mastered the art of producing, stimulating and collapsing such

    bubbles in the requiredmanner and on the desired scale using its innovative product HyCatorTMReactorSystem.HyCatorTM:BFP reactorsystemsare fine tuned forgenerating tailormadecavitiessuitable for particular applications like molecular breakdown. Due to such extremely high

    temperature, pressure intense turbulence; shockwaves are generated which are capable for

    destroying

    the

    microbes.

    SpecificEffects: Highmagnitudepressurepulse,100to5000atm

    Extremelyhightemperatures,1000to12000K Velocitiesinexcessof2to3timesthatofsound

    Growth of voidswithcontinualsupply

    of energyReleaseof energy

    Collapseofthe void(Cavity)on removalof energysourceBreakin the cohesiveforcesin

    the liquid continuumformation

    of voids

    Nuclei Expansion MaximumPhase radius

    CollapsePhase

    Bang!

  • 7/27/2019 HyCator_CaseStudy_BFP

    4/7

    HyCa Technologies Pvt Ltd176, Udyog Bhavan, Sonawala Road, Goregaon (E), Mumbai 400 063 INDIAPh: +(91) (22) 2566 8037 Web: www.hycator.com Email: [email protected]

    HyCaTe

    chnol

    ogies

    RetrofittingHyCatorTM:BFPreactorsystemintoexistingcoolingtowersystemFigure below shows schematic of a typical cooling tower circuit and an installation of standalone

    HyCator:BFPreactorsystemforpreventingbiofouling.HyCator:BFPisastandaloneunitwhichwill

    take its feed from cooling tower sump,pass it through theHyCator:BFP reactor system and the

    treatedcooling

    water

    will

    be

    either

    discharged

    to

    the

    line

    going

    for

    process

    or

    back

    to

    cooling

    tower

    sump as a closed circulation. The HyCator: BFP reactor system is available in a package having

    centrifugalpumpwhichwilltakecareofrequiredflowrateandpressureneededforHyCatorTM:BFPto

    workwithitsfullefficiency.

    Fig.:SchematicofcoolingtowercircuitandStandaloneHyCatorReactorSystemsInstallation

    PotentialBenefits:HyCatorTM:BFPReactorsystemprevents thebio foulingand reduces theblowdown toavery low

    valuewhich in turnwill reduce themake upwater rate.Once the frequency ofmakeupwater is

    reduced the addition of other chemicalswill also reduce and other impurities due to addition of

    chemicalswillalsoreducesignificantly.

    HyCatorReactor

    Coolingtowersump

    Suctionline

    StandaloneHyCatorReactorDischargeLine

    TimerarrangementtorunpumpforpredecidedtimemakingsystemFIT&FORGET

    Coolingtower

    Strainer

  • 7/27/2019 HyCator_CaseStudy_BFP

    5/7

    HyCa Technologies Pvt Ltd176, Udyog Bhavan, Sonawala Road, Goregaon (E), Mumbai 400 063 INDIAPh: +(91) (22) 2566 8037 Web: www.hycator.com Email: [email protected]

    HyCaTe

    chnol

    ogies

    Ingeneralfornormalfeedwaterqualitythepotentialbenefitsare:1. Helpsinthepreventionofbiofouling,corrosionproblemsandscaleformation.

    2. EnvironmentallySafeNochemicalsaddedorunwantedresidualscreatedbytheprocess.

    3. Noneedofbiocideschemicals.

    4. Reduce40

    %

    consumption

    of

    dispersants

    and

    corrosion

    inhibitors.

    5. Reducedblowdownofwaterduetooperationathighercyclesofconcentration.

    6. Reduce40 80%consumptionofblowdownwater.

    StandaloneHyCatorTM:BFPreactorsystembuyingprocedure1. OnclientsrequestHyCawouldsendadetailedquestionnaire.

    2. Onreceiptoffilledupquestionnaire,HyCawillgiveaquoteforfullscaleequipment.

    3. Oncereceipt

    of

    Purchase

    order

    (PO)

    for

    full

    scale,

    HyCator:

    BFP

    is

    fabricated

    and

    delivered.

    All

    HyCatorTM:BFPReactorsarecustomdesignedandfabricated.

    FrequentlyAskedQuestions(FAQs)IndexEquipment

    WhatisthespacerequirementforstandaloneHyCatorTM:BFPreactorsystem?

    WhatwillbetheweightofstandaloneHyCatorTM:BFPreactorsystem?

    IfneededhowcanweseparatetheHyCator:BFPreactorsystemfromthemainline?

    WhatwillbedeliveryperiodofstandaloneHyCatorTM:BFPreactorsystem?Saving DoesHyCatorTM:BFPreactorsystemrequireanyexternalenergysupply?

    Whatadditionalhardwareormanpowerisrequiredforinstallation?

    Isthistechnologycosteffective?

    Whataboutthepaybackperiod?Operation&Installation DoesstandaloneHyCatorTM:BFPreactorsystemrequirescontinuousmonitoring?

    IsInstallationofHyCatorTMBFPreactorsystemdifficult?

    WhatwillbetheoperationalcostofHyCatorTM:BFPreactorsystem?

    Whatisproceduretomonitor/evaluateperformanceofHyCator:BFPReactorSystem?Environmental&Safetyissues IsHyCator:BFPreactorsystemenvironmentallysafe?

    Whatarethesafetyissuestobeadoptedduringitscourseofoperationandhandling?

  • 7/27/2019 HyCator_CaseStudy_BFP

    6/7

    HyCa Technologies Pvt Ltd176, Udyog Bhavan, Sonawala Road, Goregaon (E), Mumbai 400 063 INDIAPh: +(91) (22) 2566 8037 Web: www.hycator.com Email: [email protected]

    HyCaTe

    chnol

    ogies

    Equipment WhatisthespacerequirementforHyCatorTMBFPreactorsystem?

    StandaloneHyCatorTMBFPreactorsystemrequiresverylessfootprint.Typicallyitisthespace

    requiredfor

    installation

    of

    pump

    set.

    The

    HyCator:

    BFP

    reactor

    to

    be

    installed

    at

    the

    pump

    dischargeside.

    WhatwillbetheweightofHyCatorTM:BFPreactorsystem?BasedonthepipesizethetypicalweightofHyCatorwillbe~100kgto400kg.Howeverthe

    actualweightandsizeofHyCatorTM:BFPreactorsystemmayvarydependinguponpipesize,

    pumpsize,sumpvolume,capacityofcoolingtowerandblowdownfrequency.

    IfneededhowcanweseparatetheHyCator:BFPfromthemainline?AbypassvalveisprovidedinHyCator:BFPreactorsystemanditcanbecompletelybypassed

    fromthe

    existing

    cooling

    water

    circuit

    whenever

    required.

    WhatwillbedeliveryperiodofHyCatorTM:BFPreactorsystem?ThedeliveryperiodoftheHyCatorwillbe68weeksafterthereceiptofbothtechnicallyand

    commerciallycompletedpurchaseorder.

    Saving DoesthestandaloneHyCatorTM:BFPreactorsystemrequireanyexternalenergysupply?

    An external energy source is required to an electricmotorwhichwill run the standalone

    HyCator:BFP

    reactor

    system.

    Whatadditionalhardwareormanpowerisrequiredforinstallation?Noadditionalhardwareisrequired.Forinstallationclientneedstoarrangeonlyfitter,welder

    & an electrician. Tuning of theHyCatorTMReactor System is verywell documented in the

    installationguideprovidedwithHyCatorTMReactorSystem.

    Isthistechnologycosteffective?Yesitis,becauseitsavespower,waterandchemicals.Theprocessgenerallyis~2040%less

    costlythanconventionalchemicaltreatment.

    Whataboutthepaybackperiod?Formostofourclientstilldatethepaybackperiodwasinrangeof12yrs.

    Operation&Installation DoesstandaloneHyCatorTM:BFPreactorsystemrequirescontinuousmonitoring?

    Standalone HyCatorTM: BFP reactor system does not require continuous monitoring. It

    operates on Fit and forget principle.HyCator requires zero operational supervision and

    maintenance,freeingthepersonnelforotherproductivework.

  • 7/27/2019 HyCator_CaseStudy_BFP

    7/7

    HyCa Technologies Pvt Ltd176, Udyog Bhavan, Sonawala Road, Goregaon (E), Mumbai 400 063 INDIAPh: +(91) (22) 2566 8037 Web: wwwhycator com Email: mail@hycator com

    HyCaTe

    chnol

    ogies

    IsInstallationofstandaloneHyCatorTM:BFPreactorsystemdifficult?InstallationofstandaloneHyCatorTM:BFPreactorsystemisveryeasyandneedsonlyfittingit

    inboltedflangesattherequired location.TheweightoftheHyCatorrangesfrom100kgto

    400

    kg

    depending

    on

    the

    pipe

    size.

    WhatwillbetheoperationalcostofstandaloneHyCator: BFPreactorsystem?The exact operational cost of HyCator: BFP reactor system can be estimated only after

    receivingcoolingtowerdetailsasperourstandardquestionnaire.

    Whatisproceduretomonitor/evaluateperformanceofHyCatorTMReactorSystem?The performance can bemonitored by analyzing (pH, CFU, TDS, total hardness and total

    alkalinity)ofthecoolingtowerwater.

    Environmental&Safetyissues IsHyCator:BFPreactorsystemenvironmentallysafe?

    Yesitis,becauseitreducesthetotalconsumptionofchemicalsusedforgivencapacityof

    coolingtower.

    Whatarethesafetyissuestobeadoptedduringitscourseofoperationandhandling?StandaloneHyCatorTM: BFP reactor system demands no critical safetymeasures; however

    someofthegeneralsafetymeasuresareasfollows:

    1. TheweightofstandaloneHyCatorTM:BFPreactorsystemwillbe~100kgto400kg.

    Souseappropriate chainpulleyblocksorother liftingequipment is recommended

    duringitsinstallation.

    2. Give the proper support to equipment and the adjoining piping. HyCatorTM: BFP

    reactorsystemcanbeinstalledinanyorientation,eitherverticalorhorizontal.

    3. WhileinoperationstandaloneHyCatorTM:BFPreactorsystemdoesNOTgenerateanypressure or temperature higher than the inlet water pressure and temperature.

    Normalpressuresafetyprecautionneedstobetakenasperyourpolicy.

    4. Install and operate the equipment as per the instructions given in installation &

    operatingmanualsuppliedwithequipment.