48
HYBRID TESTFEST U.K 1 st Webinar 18 th July 2018

HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

HYBRID TESTFEST U.K

1st Webinar

18th July 2018

Page 2: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

INTRODUCTION

Moderator:

Peter Schmitting ERTICO, Activity Leader InterCor TESTFEST

Speakers:

Clifford Lunnon Highways England, Project manager U.K TESTFEST

Chris Chorlton WSP Evaluation Manager

Trevor Hardy TfL Technical Manager

Emyr Thomas HE Security Manager

Jason Burrows WSP TESTFEST Coordinator

2

Page 3: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Webinar Moderation

• All participants are muted during presentation

• Participants can “Ask questions”

• Use the control panel to write your question during the

presentation

• Ideally refer to a slide number in your question

• The moderator will review your question during the webinar

• Webinar will be recorded

• Recorded Webinar will be posted on the InterCor website

• FAQs from the webinar will be captured and posted on the InterCor

website

3

Page 4: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Webinar Contents

1. Introduction to InterCor (Peter Schmitting)

2. Hybrid TESTFEST objectives (Cliff Lunnon)

3. Test sites (Cliff Lunnon)

4. Scenarios (Chris Chorlton & Trevor Hardy)

5. Security (Emyr Thomas)

6. Schedule and Preconditions (Jason Burrow)

7. Options for Participation (Cliff Lunnon)

8. Follow up Jason Burrow)

9. Expected outcome and follow-up (Peter Schmitting)

4

Page 5: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Introduction to InterCor

Peter Schmitting- ERTICO

3

5

Page 6: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

InterCor Introduction

•InterCor is a study of 1530 km of four member states under the TEN-T Core road network connecting from the North Sea – Mediterranean to the Arc Atlantique Corridor.

6

Page 7: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

InterCor Introduction 7

Page 8: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

InterCor introduction

Streamline and pilot selected ‘Day 1 services’ in four member states and facilitate a first assessment of C-ITS services on freight and logistics by building on a common hybrid communication architecture

• Traffic management

• In Vehicle Signage

• Probe Data

• Road Work Warning

• GLOSA

• Freight and Logistics

• Multi-modal Cargo Transport Optimization (MCTO)

• Truck parking

6

Page 9: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

InterCor TESTFEST Schedule

TESTFESTS to date:

• ITS-G5, Netherlands, July 17 • Services RWW, IVS, PVD, July 3 – 6, 2017 - Dordrecht

• PKI, France, April 18 • Services RWW, IVS, PVD, GLOSA, April 23 – 26, 2018, Reims

• Pre- Hybrid, Netherlands, June 18 • Services GLOSA (ITS-G5 +Cellular), June 13 – 14, Helmond

Upcoming TESTFESTS:

• Hybrid, United Kingdom, October 2018 • Services RWW, IVS, PVD, GLOSA, October 8th – 12th , UK

• Final TESTFEST, Belgium, March 2019

3

9

Page 10: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Hybrid TESTFEST Objectives

Cliff Lunnon – Highways England

3

10

Page 11: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Hybrid TESTFEST Objectives

3

Ref. Objective

1. Test Vehicle-to-Infrastructure ITS-G5 and Cellular communications, by providing a UK “Hybrid Testfest”.

2. Test four different services (GLOSA, IVS, RWW and PVD) using ITS-G5 communications.

3. Test three different services (GLOSA, IVS and RWW) using cellular communications and the InterCor IF2 protocol.

4. Use both real and simulated service information distributed directly into vehicles and collected from participating fleet vehicles (i.e. CAM and PVD).

5. Investigate and assess the performance of the communication technologies.

6. Investigate and assess interoperability issues between different InterCor member states.

7. Utilise the findings of the evaluation to input into the redevelopment of the service profiles and technical specifications.

8. Support the European harmonisation of C-ITS technology.

11

Page 12: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Test Sites

Cliff Lunnon - Highways England

12

Page 13: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Test Site Locations 13

Page 14: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

14 Venue Location

Page 15: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Venue Facilities

3

15

Page 16: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Scenarios (1)

Chris Chorlton - WSP

16

Page 17: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

17 Motorway Test Site

Page 18: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Motorway Test Sites 18

TWO SITES LOCAL TO THE TEST CENTRE

SUB TEST SITE 1

• IVS Speed Limits (Hybrid)

• IVS Dynamic Speed Limits (Hybrid)

• RWW Alert Planned Closure (Hybrid)

• IVS In Vehicle Signs, supporting RWW (Hybrid)

• Probe Vehicle Data (ITS-G5)

SUB TEST SITE 2

Cellular served interoperability Cross Border route

• IVS Message Sign in Country B “Welcome to”

• IVS fixed Speed Limit in Country B

• IVS Message Sign in Country A “Welcome to”

Page 19: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Motorway Sub Test Site 1 19

Page 20: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Motorway Sub Test Site 1 20

• Speed limit

• Variable Speed Limit

• Road Works Warning

• Supporting IVS

• Lane 1 RWW closure 300m

Page 21: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Motorway Sub Test Site 2

21

Transition

Zone Country A Country B

Page 22: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Motorway Sub Test Site 2

22

• Prove the concept of intercountry

interoperability

• 2 different C-ITS services (TCC)

• 2 IF2 – Country A, B

• Handover area where both services can

send messages.

• Service provider will need to subscribe to

both IF2’s

• OBU will connect to relevant service

based on GPS

Page 23: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

23 Rural Test Site

Page 24: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Rural Test Site

ONE SITE RURAL KENT

• GLOSA (ITSG5)

24

Drive time to site: 5 mins (approx.)

Page 25: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Rural Test Site 25

Page 26: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Rural Test Site 26

• GLOSA Time to Green Time to Red

and Speed Advice

Page 27: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Scenarios (2)

Trevor Hardy - TfL

27

Page 28: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

28 Urban Test Site

Page 29: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Urban Test Site

ONE SITE GREATER LONDON

• GLOSA (cellular)

• IVS (cellular)

• RWW cellular)

29

Drive time from Test Centre to site:

35 mins (approx.)

Drive time from Test Centre to site :

45 mins (approx.)

Page 30: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Urban Test Site (Cellular only A2 & A102) 30

Page 31: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Urban Test Site (Cellular only A2 & A102) 31

• RWW (Roadworks Warning) o RWW - Alert planned closure of a road

or a carriageway

• IVS o IVS - Dynamic Speed Limit Information

o IVS - Embedded VMS

• GLOSA o GLOSA – Time to Red

o GLOSA – Time to Green

Page 32: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Services - Summary

Chris Chorlton - WSP

32

Page 33: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Services - Summary 33

Service Test site(s)

Free Text (Cellular) Motorway sub test site 2

IVS (Cellular) Urban test site & motorway sub test site 2

IVS (Hybrid) Motorway sub test site 1

Interoperability (Cellular) Motorway sub test site 2

GLOSA (Cellular) Urban test site

GLOSA (ITS-G5) Rural test site

PVD (ITS-G5) Motorway sub test site 1

RWW (Cellular) Urban test site

RWW (Hybrid) Motorway sub test site 1

Page 34: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Security

Emyr Thomas – Highways England

34

Page 35: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

ITS-G5 Security

3

Certificate formats to comply with ETSI TS103 097 v1.2.1

A standalone UK Hybrid TESTFEST trust domain will be established, dedicated for the duration of the TESTFEST

Manual distribution; participants expected to load certificates onto their devices

No ITS-G5 CRL or CTL - Certificate validity expires at the end of the TESTFEST

35

Page 36: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Cellular Security

3

Each vehicle subscribes to one service provider (home, foreign or a participant cellular SP)

Commercial environment - a vehicle subscribes to one or more service providers

Security is the responsibility of the SP

Data integrity and authenticity: security layered between the Cellular SP and the Cellular OBU not at a message level (like with ITS-G5).

An interface specification for cellular communication is in development and will be communicated to all participants to ensure interoperability.

36

Page 37: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Schedule & Preconditions

Jason Burrows – WSP

37

Page 38: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Schedule

3

38

Time Monday 8th Oct

Test Centre

Tuesdays 9th Oct

Test Centre

Wednesday 10th Oct

Test Centre / Kier Depot

Thursday 11th Oct

Test Centre

08:00 Participant Arrival & Set up Participant Arrival & Set up Participant Arrival & Set up Participant Arrival & Set up

08:30

09:00 Opening remarks and Briefing Daily Briefing Daily Briefing Daily Briefing

09:30 Hybrid tests:

Hybrid served IVS &

RWW

(ITS-G5 & Cellular)

Technical

Team M2

KCC C-ITS

corridor

available

TRAVEL TO

LONDON

------------------------

-------------

Cellular served

GLOSA (TfL)

&

Cellular served

urban IVS & RWW

(TfL)

TRAVEL TO

LONDON

----------------------

------------

Technical Team

TfL C-ITS

corridor

available

KCC ITS-G5

GLOSA test

Technical Team M2

KCC C-ITS corridor

available

10:00 Bench test:

Local test (event centre) to

establish communications

10:30

11:00

11:30

12:00

12:30

13:00 LUNCH

13:30

14:00 Daily Briefing Daily Briefing Daily Briefing Daily Briefing

14:10 Baseline test:

Basic ITS-G5 and cellular

operation on live roads.

Interoperability tests:

Cellular served cross

border

Technical

Team M2

KCC C-ITS

corridor

available

Cellular served

GLOSA (TfL)

&

Cellular served

urban IVS & RWW

(TfL)

Technical Team

TfL C-ITS

corridor

available

Hybrid tests:

Hybrid served

IVS & RWW

(ITS-G5 &

Cellular)

Technical Team M2

KCC C-ITS corridor

available

14:30

15:00

15:30

16:00

16:30

17:00 De-briefing De-briefing De-briefing De-briefing

17:30

18:00 Closing Test centre Closing Test centre Closing Test centre Closing Test centre

Page 39: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Core Preconditions

1. Participants must register their attendance on each day.

2. A safety briefing is scheduled prior to each morning and

afternoon testing session - attendance mandatory.

3. All drivers must be accompanied.

4. Participants are to ensure that their vehicles are

appropriately insured, and that drivers have appropriate

permits.

5. Test Centre will be accessible for registered participants

only.

6. Participation is non-exclusive for InterCor members subject

to registration, the scope of participation and the availability

of places; in that order.

30

39

Page 40: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Core Preconditions

7. Participants will take part in the TESTFEST at their own expense

8. Participants must provide their own test vehicle, but as a minimum must provide peripherals such as antenna, cables, adaptors, power supplies etc.

9. InterCor partners are required to share test data; other participants voluntary. Logging specifications will be provided.

10. ITS-Stations are assumed to be compliant to standards, e.g. be able to pass the ETSI Plugtests™. Compliancy is the responsibility of the participant.

40

Page 41: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

41 Options for Participation

Cliff Lunnon – Highways England

Page 42: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

42

Cellular Minimum • OBU / SP

• Country A & B

subscription

•GLOSA

•RWW

• IVS (speed advisory + free text)

Cellular Optional • Country A subscription

• Own country data simulated service

• IVS (speed advisory + free text)

ITS-G5 Minimum • OBU / HMI

•GLOSA

•RWW

• IVS (speed advisory)

•PVD

Options for Participation

Page 43: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Follow Up

Jason Burrows – WSP

43

Page 44: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Follow up - Documents

• Action Plan • scope

• test scenarios and timings

• schedule

• facilities

• supporting information

• Baseline Specification

• Logging formats

• Scenario participant forms

• FAQs from webinar

• Due 20th August

44

Page 45: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Follow Up - Registration

Registration is now open on InterCor website:

45

Page 46: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

Follow up - Meetings

Scheduled date:

• 2nd webinar planned for 3rd September

• TBC face to face meeting early September - London

• TBC basic remote connection event early October.

30

46

Page 47: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

CLOSING REMARKS

Peter Schmitting – ERTICO

Thank You – we look forward to welcoming you to the UK.

30

47

Page 48: HYBRID TESTFEST U - InterCor · 2020. 4. 7. · Security (Emyr Thomas) 6. Schedule and Preconditions (Jason Burrow) 7. Options for Participation (Cliff Lunnon) 8. Follow up Jason

For contact [email protected]

Further information [email protected]

InterCor: www.intercor-project.eu