    Vattenfall AB

    HVDC References

    Vattenfall Power Consultant

  • 8/8/2019 HVDC References 8459890

    2/14

    Vattenfall AB 2

    More than 50 years experience in HVDC

    HVDC connections in andbetween the Nordic countries.

    Environmentally friendly

    power supply to theIsland of Gotland

    Submarine cableconnections betweenNorway, Denmark,Netherlands, Sweden,Finland, Estland, Polen

    and Germany. Ongoing project:

    FennoSkan II.

  • 8/8/2019 HVDC References 8459890

    3/14

    Vattenfall AB 3

    Gotland HVDC Swedish mainland - Gotland

    Main Data

    1954: 100 kV 20 MW monopole

    1983: 150 kV 130 MW monopole 1987: 150 kV 2x130 MW

    Total cable length: 2x97 km

    Max. laying depth: 170 m

    Services (cables and converter stations)

    Feasibility study

    Tender documents

    Evaluation and negotiations

    Design review

    Installation

    Supervision during construction and commissioning

  • 8/8/2019 HVDC References 8459890

    4/14

    Vattenfall AB 4

    Konti-Skan HVDC Sweden - Denmark

    Main Data

    1965 : 250 kV 250 MW monopole

    1987: +250, -285 kV 250+300 MW 2006: Pole 1 refurbishment +285 kV 300 MW

    Total cable length: 2x67 km

    Max. laying depth: 90 m

    Services (cables and converter stations)

    Feasibility study

    Tender documents (ITB)

    Tender evaluation and negotiations

    Design review

    Installation

    Supervision during construction and commissioning

  • 8/8/2019 HVDC References 8459890

    5/14

    Vattenfall AB 5

    Fenno-Skan HVDC Sweden - Finland

    Main Data

    1989: 400 kV 500 MW monopole

    2010: 500 kV 800 MW 2nd pole

    Total cable length: 200 km

    Max. laying depth: 120 m

    Services (cables and converter stations)

    Feasibility study

    Tender documents (ITB)

    Tender evaluation and negotiations

    Design review

    Installation

    Supervision during construction and commissioning

  • 8/8/2019 HVDC References 8459890

    6/14

    Vattenfall AB 6

    Baltic Cable HVDC Sweden - Germany

    Main Data

    450 kV 600 MW monopole

    Total cable length: 255 km (incl. land cables)

    Services (cables and converter stations)

    Feasibility study

    Tender documents (ITB)

    Tender evaluation and negotiations

    Design review

    Supervision during construction and commissioning

  • 8/8/2019 HVDC References 8459890

    7/14

    Vattenfall AB 7

    SwePol Link HVDC Sweden - Poland

    Main Data

    2000: 450 kV 600 MW monopole

    Total cable length:250 km

    Max. laying depth: 90 m

    Services (cables and converter stations)

    Owners engineer

    Feasibility study

    Tender documents (ITB)

    Tender evaluation and negotiations

    Design review

    Supervision during construction and commissioning

  • 8/8/2019 HVDC References 8459890

    8/14

    Vattenfall AB 8

    Other European HVDC Projects

    Sweden: Gotland HVDC Light connection of wind farms

    Design review

    Supervision of construction, installation and commissioning

    Azores: Island interconnection

    Feasibility study

    Nederland England: Brit Ned HVDC Interconnection Technical issues in the environmental permit process

    Estonia - Finland: Est-Link HVDC Light interconnection

    Review of cable route survey

    Supervision of cable installation

    Denmark: Store Baelt 400kV 500 MW island interconnection

    Evaluation of tenders and negotiations

  • 8/8/2019 HVDC References 8459890

    9/14

    Vattenfall AB 9

    Leyte - Luzon HVDC Interconnection

    Main Data

    350 kV 440 MW monopole

    Total cable length: 2x19 km

    Max. laying depth: 170 m

    Services

    Feasibility study

    Tender documents (ITB)

    Tender evaluation and negotiations

  • 8/8/2019 HVDC References 8459890

    10/14

    Vattenfall AB 10

    Cook Strait New Zealand

    Main Data

    350 kV 2x500 MW

    Total cable length: 3x40 km

    Max. laying depth: 260 m

    Services (cable part only)

    Review of route survey

    Design quality surveillance (ITB)

    Supervision:

    Review of inspection and test plans

    Witnessing of testing

    Loading and laying surveillance

    Review of final documentation

  • 8/8/2019 HVDC References 8459890

    11/14

    Vattenfall AB 11

    Haenam Cheju South Korea

    Main Data

    180 kV 2x150 MW

    Total cable length: 2x102 km

    Max. laying depth: 135 m

    Services (repair of cables)

    Investigation of the responsibility for the damage

    Review of costs

    Tender evaluation

    Design review of physical protection

    Supervision of cable handling

    Supervision of laying

  • 8/8/2019 HVDC References 8459890

    12/14

    Vattenfall AB 12

    Other Asian HVDC Projects

    Malaysia: Bakun 500 kV 2x800 MW

    Feasibility study

    Thailand-Malaysia: Back-to back HVDC Interconnection

    Feasibility study

    India: Rihand HVDC SSO study

    Operation and maintenance study

    Project appraisal on behalf of the Financier

    Australia: Bass Link

    Brief design quality surveillance (ITB)

    Technical issues in the environmental permit process

  • 8/8/2019 HVDC References 8459890

    13/14

    Vattenfall AB 13

    African HVDC Projects

    South Africa: Apollo 533 kV 2x900 MW

    Review of tender documents (ITB)

    Tender evaluation

    Review of design

    RD Congo: Inga Kolwezi 500 kV

    2x260 MW refurbishment and upgrade to 2x500 MW Inspection of the status of the existing HVDC

    Tender documents, technical part (ITB)

    Tender evaluation and negotiation (not yet performed)

    Supervision (optional)

  • 8/8/2019 HVDC References 8459890

    14/14

    Vattenfall AB 14

    American HVDC Projects

    Brazil: Itapu

    Reliability study

    Canada USA: HVDC interconnection (cable part only)

    Cable design quality surveillance (ITB)

    Supervision of cable installation

    World Bank

    Multi-terminal study