Vattenfall AB
HVDC References
Vattenfall Power Consultant
8/8/2019 HVDC References 8459890
2/14
Vattenfall AB 2
More than 50 years experience in HVDC
HVDC connections in andbetween the Nordic countries.
Environmentally friendly
power supply to theIsland of Gotland
Submarine cableconnections betweenNorway, Denmark,Netherlands, Sweden,Finland, Estland, Polen
and Germany. Ongoing project:
FennoSkan II.
8/8/2019 HVDC References 8459890
3/14
Vattenfall AB 3
Gotland HVDC Swedish mainland - Gotland
Main Data
1954: 100 kV 20 MW monopole
1983: 150 kV 130 MW monopole 1987: 150 kV 2x130 MW
Total cable length: 2x97 km
Max. laying depth: 170 m
Services (cables and converter stations)
Feasibility study
Tender documents
Evaluation and negotiations
Design review
Installation
Supervision during construction and commissioning
8/8/2019 HVDC References 8459890
4/14
Vattenfall AB 4
Konti-Skan HVDC Sweden - Denmark
Main Data
1965 : 250 kV 250 MW monopole
1987: +250, -285 kV 250+300 MW 2006: Pole 1 refurbishment +285 kV 300 MW
Total cable length: 2x67 km
Max. laying depth: 90 m
Services (cables and converter stations)
Feasibility study
Tender documents (ITB)
Tender evaluation and negotiations
Design review
Installation
Supervision during construction and commissioning
8/8/2019 HVDC References 8459890
5/14
Vattenfall AB 5
Fenno-Skan HVDC Sweden - Finland
Main Data
1989: 400 kV 500 MW monopole
2010: 500 kV 800 MW 2nd pole
Total cable length: 200 km
Max. laying depth: 120 m
Services (cables and converter stations)
Feasibility study
Tender documents (ITB)
Tender evaluation and negotiations
Design review
Installation
Supervision during construction and commissioning
8/8/2019 HVDC References 8459890
6/14
Vattenfall AB 6
Baltic Cable HVDC Sweden - Germany
Main Data
450 kV 600 MW monopole
Total cable length: 255 km (incl. land cables)
Services (cables and converter stations)
Feasibility study
Tender documents (ITB)
Tender evaluation and negotiations
Design review
Supervision during construction and commissioning
8/8/2019 HVDC References 8459890
7/14
Vattenfall AB 7
SwePol Link HVDC Sweden - Poland
Main Data
2000: 450 kV 600 MW monopole
Total cable length:250 km
Max. laying depth: 90 m
Services (cables and converter stations)
Owners engineer
Feasibility study
Tender documents (ITB)
Tender evaluation and negotiations
Design review
Supervision during construction and commissioning
8/8/2019 HVDC References 8459890
8/14
Vattenfall AB 8
Other European HVDC Projects
Sweden: Gotland HVDC Light connection of wind farms
Design review
Supervision of construction, installation and commissioning
Azores: Island interconnection
Feasibility study
Nederland England: Brit Ned HVDC Interconnection Technical issues in the environmental permit process
Estonia - Finland: Est-Link HVDC Light interconnection
Review of cable route survey
Supervision of cable installation
Denmark: Store Baelt 400kV 500 MW island interconnection
Evaluation of tenders and negotiations
8/8/2019 HVDC References 8459890
9/14
Vattenfall AB 9
Leyte - Luzon HVDC Interconnection
Main Data
350 kV 440 MW monopole
Total cable length: 2x19 km
Max. laying depth: 170 m
Services
Feasibility study
Tender documents (ITB)
Tender evaluation and negotiations
8/8/2019 HVDC References 8459890
10/14
Vattenfall AB 10
Cook Strait New Zealand
Main Data
350 kV 2x500 MW
Total cable length: 3x40 km
Max. laying depth: 260 m
Services (cable part only)
Review of route survey
Design quality surveillance (ITB)
Supervision:
Review of inspection and test plans
Witnessing of testing
Loading and laying surveillance
Review of final documentation
8/8/2019 HVDC References 8459890
11/14
Vattenfall AB 11
Haenam Cheju South Korea
Main Data
180 kV 2x150 MW
Total cable length: 2x102 km
Max. laying depth: 135 m
Services (repair of cables)
Investigation of the responsibility for the damage
Review of costs
Tender evaluation
Design review of physical protection
Supervision of cable handling
Supervision of laying
8/8/2019 HVDC References 8459890
12/14
Vattenfall AB 12
Other Asian HVDC Projects
Malaysia: Bakun 500 kV 2x800 MW
Feasibility study
Thailand-Malaysia: Back-to back HVDC Interconnection
Feasibility study
India: Rihand HVDC SSO study
Operation and maintenance study
Project appraisal on behalf of the Financier
Australia: Bass Link
Brief design quality surveillance (ITB)
Technical issues in the environmental permit process
8/8/2019 HVDC References 8459890
13/14
Vattenfall AB 13
African HVDC Projects
South Africa: Apollo 533 kV 2x900 MW
Review of tender documents (ITB)
Tender evaluation
Review of design
RD Congo: Inga Kolwezi 500 kV
2x260 MW refurbishment and upgrade to 2x500 MW Inspection of the status of the existing HVDC
Tender documents, technical part (ITB)
Tender evaluation and negotiation (not yet performed)
Supervision (optional)
8/8/2019 HVDC References 8459890
14/14
Vattenfall AB 14
American HVDC Projects
Brazil: Itapu
Reliability study
Canada USA: HVDC interconnection (cable part only)
Cable design quality surveillance (ITB)
Supervision of cable installation
World Bank
Multi-terminal study