HV system migration to USB interface
Presented by Korolev M.
Outline
Current situation HV Control Unit Hardware Proposed HV System layout HV Control Unit Software HV System Current calibration
Planning for 2011 year
2Bondar N. Korolev M. Maev O.
Current situation HV Control Unit Hardware
Back planeA-Side output connectors
C-Side output connectors
5 channel interface for A-Side
5 channel interface for C-Side
USB connectors
2 pc. of HV Control Units are assembled, debugged and tested Problems:
-Opal Kelly changed Firmware as a result the project was changed- Few small mistakes in assembly
Bondar N. Korolev M. Maev O.
HV System C
Matsusada
HV CUHV System A
Matsusada
PC
HVM Server A
PC
HVM Server C
USB
RS232
HVHV
Ethernet
USB
RS232
Current situation Proposed HV System layout
5Bondar N. Korolev M. Maev O.
Current situation HV Control Unit Software
Main part of SW for HV Control Unit is almost ready. Debugging and testing is in progress.Control tasks: Control and monitoring Master Boards (MB) Control and monitoring Remote Distribution Boards
(RDB) Control and monitoring Matsusada PS Smart output current monitoring
1. Soft trip2. Trip
Exchange information with PVSS
Bondar N. Korolev M. Maev O. 6
Current situation output current and voltage sensors calibrationIn order to have more precise current measurements a new
procedure of current sensors calibration has been developed. - The RDB test load box with 3 nominal resistors are assembled
Scale divided on three regions:0-4 muA (~+-2-3 nA precision) – 1GOhm res.4-40 muA (+- 10 nA precision) – 100 MOhm res.40 -100 muA(+-100 nA precision) – 10MOhm res.
- Special tool for measurement RDB and MB high voltage is prepared
- SW for calibration of HV and current sensors is in progress
We are planning to migrate to new HV Control Unit during of 2012 year shutdown. To meet this milestone we need complete the following tasks:
debugging and testing of HV Control Unit SWHV Control Unit Software implemented to PVSS – Who? Implemented some tests in situ Solve the problem with LV for RDBVisits to CERN for Korolev M. for 2011 y - 4-6 months for
the next year
Bondar N. Korolev M. Maev O. 7
Planning for 2011 year