5
Humanities Hub Draft Proposals - Proposed Sketch Views Public Consultation 13.07.17 - 6 T Y N D A L L S P A R K R O A D W O O D L A N D R O A D T Y N D A L L S P A R K R O A D Aerial View North Aerial View North West Proposed new building Proposed new building People Inspired

Humanities Hub - University of Bristol · Humanities Hub Next Steps Your feedback: Thank you for viewing these proposals. We would welcome your feedback before the scheme is finalised

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Humanities Hub - University of Bristol · Humanities Hub Next Steps Your feedback: Thank you for viewing these proposals. We would welcome your feedback before the scheme is finalised

Humanities HubDraft Proposals - Proposed Sketch Views

Public Consultation 13.07.17 - 6

T Y N D A L L S P A R K R O A D

W O

O D

L A

N D

R O

A D

T Y N D A L L S P A R K R O A D

Aerial View North Aerial View North West

Proposed new building

Proposed new building

People Inspired

Page 2: Humanities Hub - University of Bristol · Humanities Hub Next Steps Your feedback: Thank you for viewing these proposals. We would welcome your feedback before the scheme is finalised

Humanities HubDraft Proposals - Proposed Sketch Views

Public Consultation 13.07.17 - 7

T Y N D A L L S P A R K R

O A D

Woodland Road Entrance Sketch

Eye Level View - Tyndalls Park Road

Aerial View - North East

People Inspired

Page 3: Humanities Hub - University of Bristol · Humanities Hub Next Steps Your feedback: Thank you for viewing these proposals. We would welcome your feedback before the scheme is finalised

Public Consultation 13.07.17 - 8

Humanities HubDraft Proposals - Landscape

Emphasise simplicity and encourage use of outdoor space Lines of existing features to create new boundary walls, steps, etc. Reclaim stone from original walling to incorporate into retaining featuresPlanting to be simple and afford year round interest collectively Existing bin store to be kept.Existing courtyards at ground level - new soft and hard landscaping

••

Key:

building

planted area

lawn / meadow area

green roof

communal seating

gateway signage location

tree bole

excavated area

location of spoil

circulation

3-5

7-9

11

13

15

36

21

19

17

Route from Priory Road to rear parking,

and via Highbury Villas to shops

Humanities Hub

Project: University of Bristol: Humanities Hub / Woodland Road

Drawing: Landscape concept planDate: 20th March 2017Scale: 1:200 Drawing size: A3Drawing no: 1 Rev: 4

breakout / venue

desk seating / venue

Hub entrance

disabled parking

recycling & waste / cycle store

parking entrance

central secure cycle store

breakout / venue

combined breakout spaces provide

larger venue

proposed new tree

shelter

Create an open and inviting public green route. Scheme defined by increased legibility and permeability.Enhance the shape, colour and form of the buildings/surroundsProvide attractive/healthy green spaces.Encourage use by all sections of society.

Longer term connection with the new development at Tyndall Avenue; create continuous public realm space. Open views from north to south. New route from Priory Road through to the rear parking area. Safe and secure route 24 hrs a day through the green route

••

Key:

building

planted area

lawn / meadow area

green roof

communal seating

gateway signage location

tree bole

excavated area

location of spoil

circulation

3-5

7-9

11

13

15

36

21

19

17

Route from Priory Road to rear parking,

and via Highbury Villas to shops

Humanities Hub

Project: University of Bristol: Humanities Hub / Woodland Road

Drawing: Landscape concept planDate: 20th March 2017Scale: 1:200 Drawing size: A3Drawing no: 1 Rev: 4

breakout / venue

desk seating / venue

Hub entrance

disabled parking

recycling & waste / cycle store

parking entrance

central secure cycle store

breakout / venue

combined breakout spaces provide

larger venue

proposed new tree

shelter

Key:

building

planted area

lawn / meadow area

green roof

communal seating

gateway signage location

tree bole

excavated area

location of spoil

circulation

3-5

7-9

11

13

15

36

21

19

17

Route from Priory Road to rear parking,

and via Highbury Villas to shops

Humanities Hub

Project: University of Bristol: Humanities Hub / Woodland Road

Drawing: Landscape concept planDate: 20th March 2017Scale: 1:200 Drawing size: A3Drawing no: 1 Rev: 4

breakout / venue

desk seating / venue

Hub entrance

disabled parking

recycling & waste / cycle store

parking entrance

central secure cycle store

breakout / venue

combined breakout spaces provide

larger venue

proposed new tree

shelter

Terrace on level 1 - bench seating around the light well with planting on either end.Entrances - good quality stone paving slabs.

Landscape scheme for the Humanities Hub Landscape concept design proposal for the front gardens No 3-21 Woodland Road (note - this is a separate project and will be formally proposed at a later date)

V1

V2

Sketch Landscape Proposals

V1 Eye Level View - North Courtyard

V2 - Eye Level View - Roof Terrace looking NorthNicola Greaves Design - Landscape Concept

Segregation of pedestrians and vehicles.Well-considered lighting scheme.On-site parking retained in key areas Some parking relocated to the rear of the properties.Centralised secure cycle storage. Ecology enhanced with improved green corridors

••

••

People Inspired

Page 4: Humanities Hub - University of Bristol · Humanities Hub Next Steps Your feedback: Thank you for viewing these proposals. We would welcome your feedback before the scheme is finalised

Public Consultation 13.07.17 - 9

Humanities HubNext Steps

Your feedback:

Thank you for viewing these proposals.

We would welcome your feedback before the scheme is finalised and a planning application is submitted to Bristol City Council.

If you would like to make any comments please complete the feedback form at the exhibition and return to Avril Baker Consultancy (ABC) by Monday 24th July 2017.

Ongoing Development Sketch

For further information

If you have any queries about the project or the consultation please contact Avril Baker at ABC:t: 0117 977 2002or email: [email protected]

Pre-application consultation - July 2017

Submission of planning application - Autumn 2017

Subject to planning proposed start on site - 2nd Quarter 2018

Building works complete - Summer 2019

Activity / Timeframe

Year

3 Qtr 4 Qtr

2017

1 Qtr 2Qtr 3Qtr 4Qtr

2018

1 Qtr 2Qtr 3Qtr 4Qtr

2019

Humanities Hub, Key Design Team:

Project Manager - JLL

Architect - ADP

Sustainability Design - ADP

Landscape architect - ADP

Quantity Surveyor - RLB (Bristol)

Structures - ARUP

Civil Engineering - ARUP

M&E Serrvices - E3 Consulting

Planning Consultant - CSJ Planning

Timeline

People Inspired

Page 5: Humanities Hub - University of Bristol · Humanities Hub Next Steps Your feedback: Thank you for viewing these proposals. We would welcome your feedback before the scheme is finalised

2

EB DCA F G H

3

J

1

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

ROOM KEY

Breakout and Social Learning

Circulation

Staff

Teaching room

Technical

Washrooms

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

60 m²30 PERSON SEMINAR ROOM

5 m²RISER

8 m²STAFF OFFICE

9 m²STAFF OFFICE

9 m²STAFF OFFICE

10 m²STAFF OFFICE

27 m²MEETING ROOM

10 m²WASHROOMS

100 m²BREAKOUT SPACE

5 m²RISER

33 m²CIRCULATION 78 m²

CIRCULATION42 m²

CIRCULATION

39 m²CIRCULATION

VILLA 36VILLA 3

VILLA 7

VILLA 5

VILLA 9

COURTYARD ROOF TERRACE

10 m²STAFF OFFICE

10 m²STAFF OFFICE

14 m²STAFF OFFICE

5 m²RISER

77 m²40 PERSON SEMINAR ROOM

77 m²40 PERSON SEMINAR ROOM

27 m²MEETING ROOM

5 m²STORE

6 m²STORE

7 m²STORE

16 m²WASHROOMS

This line should measure 100mm along x and y axis when printed

DRAWING TITLE:

5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.adp-architecture.com

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 125

PROPOSED LEVEL 1 FLOOR PLAN - OPTION 2

HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3

BRS4 SK02

REVISION DATE DESCRIPTION ARCHITECT PARTNER

2

EB DCA F G H

3

J

1

83 m²

40 PERSON FLEXIBLETEACHING

VILLA 36VILLA 3

VILLA 7

VILLA 5

VILLA 9

COURTYARD

200 m²LECTURE THEATRE

11 m²PROJECTION ROOM

ROOM KEY

Breakout and Social Learning

Circulation

Exhibition space

Lecture theatre

Study area and hot desking

Teaching room

Technical

Washrooms

71 m²

30 PERSON FLEXIBLETEACHING

Existing LectureTheatre

5 m²SERVICES

10 m²SERVICES

8 m²STORAGE

21 m²WASHROOMS

Not EnclosedSTUDY AREA

26

7 m²SERVICES

19 m²WASHROOMS

23 m²CIRCULATION

103 m²96 PEERSON CINEMA ROOM

66 m²EXHIBITION GALLERY

57 m²CIRCULATION

46 m²CIRCULATION

60 m²CIRCULATION

42 m²CIRCULATION

25 m²CIRCULATION

8 m²STORE

5 m²RISER

8 m²STORE

5 m²RISER

4 m²WC

6 m²STORE

25 m²CIRCULATION

196 m²SOCIAL LEARNING

164 m²CIRCULATION

This line should measure 100mm along x and y axis when printed

DRAWING TITLE:

5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.adp-architecture.com

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 125

PROPOSED LEVEL 0 FLOOR PLAN -OPTION 2

HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3

BRS4 SK01

REVISION DATE DESCRIPTION ARCHITECT PARTNER

1 : 125PROPOSED LEVEL 0 - FLOOR PLAN - OPTION 21

Humanities HubIncorporating LT1

2

EB DCA F G H

3

J

1

12 m²STAFF OFFICE

110

11 m²STAFF OFFICE

111

11 m²STAFF OFFICE

112

14 m²STAFF OFFICE

113

41 m²BREAKOUT SPACE

80

9 m²CIRCULATION

89

30 m²WASHROOMS

78

42 m²MEETING ROOM

84

66 m²SEMINAR ROOM

743 m²

RISER91

3 m²RISER

90

53 m²SEMINAR ROOM

85

11 m²STAFF OFFICE

114

2 m²RISER

115

12 m²STAFF OFFICE

116

12 m²STAFF OFFICE

117

12 m²STAFF OFFICE

11812 m²

STAFF OFFICE119

12 m²STAFF OFFICE

12012 m²

STAFF OFFICE121

12 m²STAFF OFFICE

122

12 m²STAFF OFFICE

123

12 m²STAFF OFFICE

124

12 m²STAFF OFFICE

12512 m²STAFF OFFICE

12612 m²

STAFF OFFICE127

11 m²STAFF OFFICE

128

124 m²CIRCULATION

129

32 m²BREAKOUT SPACE

130

19 m²STAIR

131

ROOM KEY

Breakout and Social Learning

Circulation

Staff

Study area and hot desking

Teaching room

Technical

Washrooms

8 m²FIRE ESCAPE

133

7 m²TEA POINT

134

11 m²STAFF OFFICE

135

12 m²CIRCULATION

136

16 m²STAFF OFFICE

137

59 m²SEMINAR ROOM

75

This line should measure 100mm along x and y axis when printed

DRAWING TITLE:

5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.adp-architecture.com

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 125

1S1-P

PROPOSED LEVEL 1 FLOOR PLAN - OPTION 1

HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3

BRS4 SK019

REVISION DATE DESCRIPTION ARCHITECT PARTNER

S1-P 1 27.03.17 GENERAL UPDATE ISSUE MS-S ADP

UP

Villa 11

2

EB DCA F G H

3

J

1

57 m²FLEXIBLE TEACHING

9

81 m²EXHIBITION GALLERY

11

24 m²RECEPTION

1

23 m²WCS

5

49 m²CIRCULATION

6

112 m²SOCIAL LEARNING

2

LOCKERS

Villa 36Villa 3

Villa 7

Villa 5

Villa 9

COURTYARD

AHU ROOM BELOW

30 m²HOT DESKING

16

179 m²LECTURE THEATRE

12

11 m²COFFEE CART

19

19 m²PROJECTION ROOM

20

101 m²BREAKOUT/CIRCULATION

21

ROOM KEY

Breakout and Social Learning

Circulation

Exhibition space

Lecture theatre

Study area and hot desking

Teaching room

Technical

Washrooms

Storage wall

150 m²CIRCULATION

22

57 m²FLEXIBLE TEACHING

23

4 m²ACCESSIBLE WC

25

54 m²FLEXIBLE TEACHING

15

8 m²CIRCULATION

10

EXISTING LECTURETHEATRE

Existing LectureTheatre

3 m²SERVICES

8

4 m²SERVICES

7

6 m²STORAGE

3

24 m²WASHROOMS

13

57 m²CIRCULATION

17

40 m²STUDY AREA

26

11 m²SERVICES

71

26 m²CIRCULATION

72

2 m²

RISE

R73

18 m²WASHROOMS

1325 m²WASHROOMS

140

This line should measure 100mm along x and y axis when printed

DRAWING TITLE:

5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.adp-architecture.com

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 125

2S1-P

PROPOSED LEVEL 0 FLOOR PLAN - OPTION 1

HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3

BRS4 SK018

REVISION DATE DESCRIPTION ARCHITECT PARTNER

S1-P 1 16.03.17 CHANGES DUE TO LOCATION OFTREE

MS-S ADP

S1-P 2 27.03.17 GENERAL UPDATE ISSUE MS-S ADP

First Floor Plan

Ground Floor Plan

UP

Villa 11

2

EB DCA F G H

3

J

1

57 m²FLEXIBLE TEACHING

9

81 m²EXHIBITION GALLERY

11

24 m²RECEPTION

1

23 m²WCS

5

49 m²CIRCULATION

6

112 m²SOCIAL LEARNING

2

LOCKERS

Villa 36Villa 3

Villa 7

Villa 5

Villa 9

COURTYARD

AHU ROOM BELOW

30 m²HOT DESKING

16

179 m²LECTURE THEATRE

12

11 m²COFFEE CART

19

19 m²PROJECTION ROOM

20

101 m²BREAKOUT/CIRCULATION

21

ROOM KEY

Breakout and Social Learning

Circulation

Exhibition space

Lecture theatre

Study area and hot desking

Teaching room

Technical

Washrooms

Storage wall

150 m²CIRCULATION

22

57 m²FLEXIBLE TEACHING

23

4 m²ACCESSIBLE WC

25

54 m²FLEXIBLE TEACHING

15

8 m²CIRCULATION

10

EXISTING LECTURETHEATRE

Existing LectureTheatre

3 m²SERVICES

8

4 m²SERVICES

7

6 m²STORAGE

3

24 m²WASHROOMS

13

57 m²CIRCULATION

17

40 m²STUDY AREA

26

11 m²SERVICES

71

26 m²CIRCULATION

72

2 m²

RISE

R73

18 m²WASHROOMS

1325 m²WASHROOMS

140

This line should measure 100mm along x and y axis when printed

DRAWING TITLE:

5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]

JOB TITLE:

SCALE: DRAWING SHEET SIZE:

REVISION:DRAWING NUMBER:JOB CODE:

A1

www.adp-architecture.com

CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS

1 : 125

2S1-P

PROPOSED LEVEL 0 FLOOR PLAN - OPTION 1

HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3

BRS4 SK018

REVISION DATE DESCRIPTION ARCHITECT PARTNER

S1-P 1 16.03.17 CHANGES DUE TO LOCATION OFTREE

MS-S ADP

S1-P 2 27.03.17 GENERAL UPDATE ISSUE MS-S ADP

W O O D L A N D R O A D

W O O D L A N D R O A D

As part of the original brief LT1 could not be incorporated into the proposals due to the desire to keep the lecture theatre in operation for as long as possible.

It has now transpired that this is not possible due to site restrictions for the potential contractor and health and safety issues for students during construction.

Initial costings suggest that the LT1 space could be economically incorporated into the proposals.

The university has therefore considered that, given the potential pitfalls of trying to retain LT1 in use during the proposed construction period, there is a clear case for considering the remodelling of this area to make a better contribution to the proposals overall

This also gives a better opportunity to investigate the potential to breakdown the scale of the new building by considering its form as that of ‘garden pavilions’ related to individual villa groups.

Incorporating the area of LT1 will provide a logical and less compromised layout.

At ground floor the former LT1 space becomes available for flexible space with an identified feature use as a flat floor screening theatre.

Adjacent space is now much more logical in layout.

New accommodation can be seen as helping to relate new construction existing much more clearly to the individual villas.

At first floor offices are retained to east elevation with potential for some office space to the west, though kept to a minimum.

Teaching spaces stay to the west adjacent to/facing the existing villas.

Break out space is within, or adjacent to, circulation zones and concentrated adjacent to the roof terrace which becomes an external break out space.

This also gives daylight and views to the break out space.

Keeping the spaces between pavilions free of enclosed accommodation allows views back to, and between the villas and allows access to smaller break out spaces from teaching rooms.

Public Consultation 13.07.17 - 10 People Inspired