Humanities HubDraft Proposals - Proposed Sketch Views
Public Consultation 13.07.17 - 6
T Y N D A L L S P A R K R O A D
W O
O D
L A
N D
R O
A D
T Y N D A L L S P A R K R O A D
Aerial View North Aerial View North West
Proposed new building
Proposed new building
People Inspired
Humanities HubDraft Proposals - Proposed Sketch Views
Public Consultation 13.07.17 - 7
T Y N D A L L S P A R K R
O A D
Woodland Road Entrance Sketch
Eye Level View - Tyndalls Park Road
Aerial View - North East
People Inspired
Public Consultation 13.07.17 - 8
Humanities HubDraft Proposals - Landscape
Emphasise simplicity and encourage use of outdoor space Lines of existing features to create new boundary walls, steps, etc. Reclaim stone from original walling to incorporate into retaining featuresPlanting to be simple and afford year round interest collectively Existing bin store to be kept.Existing courtyards at ground level - new soft and hard landscaping
•
•
•
•
••
Key:
building
planted area
lawn / meadow area
green roof
communal seating
gateway signage location
tree bole
excavated area
location of spoil
circulation
3-5
7-9
11
13
15
36
21
19
17
Route from Priory Road to rear parking,
and via Highbury Villas to shops
Humanities Hub
Project: University of Bristol: Humanities Hub / Woodland Road
Drawing: Landscape concept planDate: 20th March 2017Scale: 1:200 Drawing size: A3Drawing no: 1 Rev: 4
breakout / venue
desk seating / venue
Hub entrance
disabled parking
recycling & waste / cycle store
parking entrance
central secure cycle store
breakout / venue
combined breakout spaces provide
larger venue
proposed new tree
shelter
Create an open and inviting public green route. Scheme defined by increased legibility and permeability.Enhance the shape, colour and form of the buildings/surroundsProvide attractive/healthy green spaces.Encourage use by all sections of society.
•
•
•
•
•
Longer term connection with the new development at Tyndall Avenue; create continuous public realm space. Open views from north to south. New route from Priory Road through to the rear parking area. Safe and secure route 24 hrs a day through the green route
•
••
•
Key:
building
planted area
lawn / meadow area
green roof
communal seating
gateway signage location
tree bole
excavated area
location of spoil
circulation
3-5
7-9
11
13
15
36
21
19
17
Route from Priory Road to rear parking,
and via Highbury Villas to shops
Humanities Hub
Project: University of Bristol: Humanities Hub / Woodland Road
Drawing: Landscape concept planDate: 20th March 2017Scale: 1:200 Drawing size: A3Drawing no: 1 Rev: 4
breakout / venue
desk seating / venue
Hub entrance
disabled parking
recycling & waste / cycle store
parking entrance
central secure cycle store
breakout / venue
combined breakout spaces provide
larger venue
proposed new tree
shelter
Key:
building
planted area
lawn / meadow area
green roof
communal seating
gateway signage location
tree bole
excavated area
location of spoil
circulation
3-5
7-9
11
13
15
36
21
19
17
Route from Priory Road to rear parking,
and via Highbury Villas to shops
Humanities Hub
Project: University of Bristol: Humanities Hub / Woodland Road
Drawing: Landscape concept planDate: 20th March 2017Scale: 1:200 Drawing size: A3Drawing no: 1 Rev: 4
breakout / venue
desk seating / venue
Hub entrance
disabled parking
recycling & waste / cycle store
parking entrance
central secure cycle store
breakout / venue
combined breakout spaces provide
larger venue
proposed new tree
shelter
Terrace on level 1 - bench seating around the light well with planting on either end.Entrances - good quality stone paving slabs.
•
•
Landscape scheme for the Humanities Hub Landscape concept design proposal for the front gardens No 3-21 Woodland Road (note - this is a separate project and will be formally proposed at a later date)
V1
V2
Sketch Landscape Proposals
V1 Eye Level View - North Courtyard
V2 - Eye Level View - Roof Terrace looking NorthNicola Greaves Design - Landscape Concept
Segregation of pedestrians and vehicles.Well-considered lighting scheme.On-site parking retained in key areas Some parking relocated to the rear of the properties.Centralised secure cycle storage. Ecology enhanced with improved green corridors
•
••
•
••
People Inspired
Public Consultation 13.07.17 - 9
Humanities HubNext Steps
Your feedback:
Thank you for viewing these proposals.
We would welcome your feedback before the scheme is finalised and a planning application is submitted to Bristol City Council.
If you would like to make any comments please complete the feedback form at the exhibition and return to Avril Baker Consultancy (ABC) by Monday 24th July 2017.
Ongoing Development Sketch
For further information
If you have any queries about the project or the consultation please contact Avril Baker at ABC:t: 0117 977 2002or email: [email protected]
Pre-application consultation - July 2017
Submission of planning application - Autumn 2017
Subject to planning proposed start on site - 2nd Quarter 2018
Building works complete - Summer 2019
Activity / Timeframe
Year
3 Qtr 4 Qtr
2017
1 Qtr 2Qtr 3Qtr 4Qtr
2018
1 Qtr 2Qtr 3Qtr 4Qtr
2019
Humanities Hub, Key Design Team:
Project Manager - JLL
Architect - ADP
Sustainability Design - ADP
Landscape architect - ADP
Quantity Surveyor - RLB (Bristol)
Structures - ARUP
Civil Engineering - ARUP
M&E Serrvices - E3 Consulting
Planning Consultant - CSJ Planning
Timeline
People Inspired
2
EB DCA F G H
3
J
1
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
ROOM KEY
Breakout and Social Learning
Circulation
Staff
Teaching room
Technical
Washrooms
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
60 m²30 PERSON SEMINAR ROOM
5 m²RISER
8 m²STAFF OFFICE
9 m²STAFF OFFICE
9 m²STAFF OFFICE
10 m²STAFF OFFICE
27 m²MEETING ROOM
10 m²WASHROOMS
100 m²BREAKOUT SPACE
5 m²RISER
33 m²CIRCULATION 78 m²
CIRCULATION42 m²
CIRCULATION
39 m²CIRCULATION
VILLA 36VILLA 3
VILLA 7
VILLA 5
VILLA 9
COURTYARD ROOF TERRACE
10 m²STAFF OFFICE
10 m²STAFF OFFICE
14 m²STAFF OFFICE
5 m²RISER
77 m²40 PERSON SEMINAR ROOM
77 m²40 PERSON SEMINAR ROOM
27 m²MEETING ROOM
5 m²STORE
6 m²STORE
7 m²STORE
16 m²WASHROOMS
This line should measure 100mm along x and y axis when printed
DRAWING TITLE:
5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.adp-architecture.com
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 125
PROPOSED LEVEL 1 FLOOR PLAN - OPTION 2
HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3
BRS4 SK02
REVISION DATE DESCRIPTION ARCHITECT PARTNER
2
EB DCA F G H
3
J
1
83 m²
40 PERSON FLEXIBLETEACHING
VILLA 36VILLA 3
VILLA 7
VILLA 5
VILLA 9
COURTYARD
200 m²LECTURE THEATRE
11 m²PROJECTION ROOM
ROOM KEY
Breakout and Social Learning
Circulation
Exhibition space
Lecture theatre
Study area and hot desking
Teaching room
Technical
Washrooms
71 m²
30 PERSON FLEXIBLETEACHING
Existing LectureTheatre
5 m²SERVICES
10 m²SERVICES
8 m²STORAGE
21 m²WASHROOMS
Not EnclosedSTUDY AREA
26
7 m²SERVICES
19 m²WASHROOMS
23 m²CIRCULATION
103 m²96 PEERSON CINEMA ROOM
66 m²EXHIBITION GALLERY
57 m²CIRCULATION
46 m²CIRCULATION
60 m²CIRCULATION
42 m²CIRCULATION
25 m²CIRCULATION
8 m²STORE
5 m²RISER
8 m²STORE
5 m²RISER
4 m²WC
6 m²STORE
25 m²CIRCULATION
196 m²SOCIAL LEARNING
164 m²CIRCULATION
This line should measure 100mm along x and y axis when printed
DRAWING TITLE:
5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.adp-architecture.com
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 125
PROPOSED LEVEL 0 FLOOR PLAN -OPTION 2
HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3
BRS4 SK01
REVISION DATE DESCRIPTION ARCHITECT PARTNER
1 : 125PROPOSED LEVEL 0 - FLOOR PLAN - OPTION 21
Humanities HubIncorporating LT1
2
EB DCA F G H
3
J
1
12 m²STAFF OFFICE
110
11 m²STAFF OFFICE
111
11 m²STAFF OFFICE
112
14 m²STAFF OFFICE
113
41 m²BREAKOUT SPACE
80
9 m²CIRCULATION
89
30 m²WASHROOMS
78
42 m²MEETING ROOM
84
66 m²SEMINAR ROOM
743 m²
RISER91
3 m²RISER
90
53 m²SEMINAR ROOM
85
11 m²STAFF OFFICE
114
2 m²RISER
115
12 m²STAFF OFFICE
116
12 m²STAFF OFFICE
117
12 m²STAFF OFFICE
11812 m²
STAFF OFFICE119
12 m²STAFF OFFICE
12012 m²
STAFF OFFICE121
12 m²STAFF OFFICE
122
12 m²STAFF OFFICE
123
12 m²STAFF OFFICE
124
12 m²STAFF OFFICE
12512 m²STAFF OFFICE
12612 m²
STAFF OFFICE127
11 m²STAFF OFFICE
128
124 m²CIRCULATION
129
32 m²BREAKOUT SPACE
130
19 m²STAIR
131
ROOM KEY
Breakout and Social Learning
Circulation
Staff
Study area and hot desking
Teaching room
Technical
Washrooms
8 m²FIRE ESCAPE
133
7 m²TEA POINT
134
11 m²STAFF OFFICE
135
12 m²CIRCULATION
136
16 m²STAFF OFFICE
137
59 m²SEMINAR ROOM
75
This line should measure 100mm along x and y axis when printed
DRAWING TITLE:
5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.adp-architecture.com
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 125
1S1-P
PROPOSED LEVEL 1 FLOOR PLAN - OPTION 1
HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3
BRS4 SK019
REVISION DATE DESCRIPTION ARCHITECT PARTNER
S1-P 1 27.03.17 GENERAL UPDATE ISSUE MS-S ADP
UP
Villa 11
2
EB DCA F G H
3
J
1
57 m²FLEXIBLE TEACHING
9
81 m²EXHIBITION GALLERY
11
24 m²RECEPTION
1
23 m²WCS
5
49 m²CIRCULATION
6
112 m²SOCIAL LEARNING
2
LOCKERS
Villa 36Villa 3
Villa 7
Villa 5
Villa 9
COURTYARD
AHU ROOM BELOW
30 m²HOT DESKING
16
179 m²LECTURE THEATRE
12
11 m²COFFEE CART
19
19 m²PROJECTION ROOM
20
101 m²BREAKOUT/CIRCULATION
21
ROOM KEY
Breakout and Social Learning
Circulation
Exhibition space
Lecture theatre
Study area and hot desking
Teaching room
Technical
Washrooms
Storage wall
150 m²CIRCULATION
22
57 m²FLEXIBLE TEACHING
23
4 m²ACCESSIBLE WC
25
54 m²FLEXIBLE TEACHING
15
8 m²CIRCULATION
10
EXISTING LECTURETHEATRE
Existing LectureTheatre
3 m²SERVICES
8
4 m²SERVICES
7
6 m²STORAGE
3
24 m²WASHROOMS
13
57 m²CIRCULATION
17
40 m²STUDY AREA
26
11 m²SERVICES
71
26 m²CIRCULATION
72
2 m²
RISE
R73
18 m²WASHROOMS
1325 m²WASHROOMS
140
This line should measure 100mm along x and y axis when printed
DRAWING TITLE:
5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.adp-architecture.com
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 125
2S1-P
PROPOSED LEVEL 0 FLOOR PLAN - OPTION 1
HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3
BRS4 SK018
REVISION DATE DESCRIPTION ARCHITECT PARTNER
S1-P 1 16.03.17 CHANGES DUE TO LOCATION OFTREE
MS-S ADP
S1-P 2 27.03.17 GENERAL UPDATE ISSUE MS-S ADP
First Floor Plan
Ground Floor Plan
UP
Villa 11
2
EB DCA F G H
3
J
1
57 m²FLEXIBLE TEACHING
9
81 m²EXHIBITION GALLERY
11
24 m²RECEPTION
1
23 m²WCS
5
49 m²CIRCULATION
6
112 m²SOCIAL LEARNING
2
LOCKERS
Villa 36Villa 3
Villa 7
Villa 5
Villa 9
COURTYARD
AHU ROOM BELOW
30 m²HOT DESKING
16
179 m²LECTURE THEATRE
12
11 m²COFFEE CART
19
19 m²PROJECTION ROOM
20
101 m²BREAKOUT/CIRCULATION
21
ROOM KEY
Breakout and Social Learning
Circulation
Exhibition space
Lecture theatre
Study area and hot desking
Teaching room
Technical
Washrooms
Storage wall
150 m²CIRCULATION
22
57 m²FLEXIBLE TEACHING
23
4 m²ACCESSIBLE WC
25
54 m²FLEXIBLE TEACHING
15
8 m²CIRCULATION
10
EXISTING LECTURETHEATRE
Existing LectureTheatre
3 m²SERVICES
8
4 m²SERVICES
7
6 m²STORAGE
3
24 m²WASHROOMS
13
57 m²CIRCULATION
17
40 m²STUDY AREA
26
11 m²SERVICES
71
26 m²CIRCULATION
72
2 m²
RISE
R73
18 m²WASHROOMS
1325 m²WASHROOMS
140
This line should measure 100mm along x and y axis when printed
DRAWING TITLE:
5 Coldharbour Business ParkSherborne Dorset DT9 4JWT +44 (0) 1935 810620E [email protected]
JOB TITLE:
SCALE: DRAWING SHEET SIZE:
REVISION:DRAWING NUMBER:JOB CODE:
A1
www.adp-architecture.com
CHECK ALL DIMENSIONS AND VERIFY ON SITE. REPORT ANY ERRORS OR OMISSIONS
1 : 125
2S1-P
PROPOSED LEVEL 0 FLOOR PLAN - OPTION 1
HUMANITIES HUBUNIVERSITY OF BRISTOLJOB NAME LINE 3
BRS4 SK018
REVISION DATE DESCRIPTION ARCHITECT PARTNER
S1-P 1 16.03.17 CHANGES DUE TO LOCATION OFTREE
MS-S ADP
S1-P 2 27.03.17 GENERAL UPDATE ISSUE MS-S ADP
W O O D L A N D R O A D
W O O D L A N D R O A D
As part of the original brief LT1 could not be incorporated into the proposals due to the desire to keep the lecture theatre in operation for as long as possible.
It has now transpired that this is not possible due to site restrictions for the potential contractor and health and safety issues for students during construction.
Initial costings suggest that the LT1 space could be economically incorporated into the proposals.
The university has therefore considered that, given the potential pitfalls of trying to retain LT1 in use during the proposed construction period, there is a clear case for considering the remodelling of this area to make a better contribution to the proposals overall
This also gives a better opportunity to investigate the potential to breakdown the scale of the new building by considering its form as that of ‘garden pavilions’ related to individual villa groups.
Incorporating the area of LT1 will provide a logical and less compromised layout.
At ground floor the former LT1 space becomes available for flexible space with an identified feature use as a flat floor screening theatre.
Adjacent space is now much more logical in layout.
New accommodation can be seen as helping to relate new construction existing much more clearly to the individual villas.
At first floor offices are retained to east elevation with potential for some office space to the west, though kept to a minimum.
Teaching spaces stay to the west adjacent to/facing the existing villas.
Break out space is within, or adjacent to, circulation zones and concentrated adjacent to the roof terrace which becomes an external break out space.
This also gives daylight and views to the break out space.
Keeping the spaces between pavilions free of enclosed accommodation allows views back to, and between the villas and allows access to smaller break out spaces from teaching rooms.
Public Consultation 13.07.17 - 10 People Inspired