http://www.dot.state.mn.us/metro/stateaid/fedconst.html
Elisa Bottos Metro State Aid
Construction Engineer651-234-7766
Jim DeenyMetro State Aid
Construction Specialist651-234-7762
Metro District State Aid Construction Training
1906 partial payments monthly – http://www.dot.state.mn.us/pre-letting/spec/2005/1100-1911.pdf
Deducts – recommendations of specialty officesRetainage is not intended to be for deducts for failing
material etc.Material on Hand payments must be timely
Time
40% of work must be performed by prime contractor30% if project includes DBE goal2005 SPEC Book 1801Request to Sublet Contract Administratuion Manual
Subletting MnDOT Spec 1801
Designate specialty work prior to letting inSpecial Provisions 1801
Request to Sublet Contract Administration Manualhttp://www.dot.state.mn.us/const/tools/docs/cam.pdf
Subletting MnDOT Spec 1801
Specialty Work as defined in 19041904(7) Specialty Contract Work - Specialty work is
unique work that cannot be performed by either the Prime Contractor, its subcontractors, or other contracting firms that generally perform work on highway construction projects.
Subletting MnDOT Spec 1801
FHWA 1273, Section VII "Specialty Items" shall be construed to be limited to
work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid on the contract as a whole and in general are to be limited to minor components of the overall contract.
Subletting MnDOT Spec 1801
Request to Sublet Forms 10 days prior to workRequest to Sublet Summaryhttp://www.dot.state.mn.us/const/tools/docs/cam.pdf
Subletting MnDOT Spec 1801
Terminology - Work Orders, Change Orders, Supplemental Agreements
Forms on SALT website http://www.dot.state.mn.us/stateaid/sa_construction_links.html
Scanned signaturesSeparate documents for separate issuesIndicate funding group for extra work
Contract Change Documents
Supplemental Agreements• Transmittal letter• Language approval by Karen Peters recommended• Estimating approval required• State Aid Engineer signature required after
execution• Good to clear engineering concepts with us first.
Contract Change Documents
Supplemental Agreements• Performance of Extra Work as defined in Spec 1403 (>$50,000)• Alterations in special provisions and specifications (including contract time)• Revisions in the structural section above the sub-base• Alterations in the scope of the contract or character of the work• Major revisions in geometric design of the mainline roadway, ramps,
frontage roads, or crossovers• Additions, deletions or relocations of bridges or other structures that would
affect the functional scope and intent of the approved design
Contract Change Documents
Work Orders - Minor Extra Work• No contract unit price for work item• maximum of $50,000 for 2005 spec book.• Price can be by negotiated price or force account• MEW > $5,000 estimating approval is required• MEW >$25,000 District State Aid Engineer approval
is required for funding eligibility.
Contract Change Documents
Change Orders• Revising method of measurement• Waiving liquidated damages after the project is in condition for safe
convenient use by the traveling public, or is otherwise available for next-stage construction without restriction.
• Documenting unacceptable work or materials• Documenting bonus payments to the Contractor for exceeding
established pavement ride quality, quality standards, or early completion of work as provided in the Contract
Contract Change Documents
Change Orders• Documenting changes in the original plan (P) quantity due to re-
measure or re-computation. • Documenting substitution of materials• Documenting increased or decreased quantities• Documenting minor grade changes, subgrade excavation changes,
and structure excavation changes
Contract Change Documents
Labor Compliance
Poster boardsCertified payrollsField interviews
Checklisthttp://www.dot.state.mn.us/const/labor/documents/contractdocs/fedaidchecklist.doc
Labor Compliance
Poster Boards
Fill in the Blanks!
Poster board linkhttp://www.dot.state.mn.us/const/labor/posterboards.html
Labor ComplianceLabor Compliance
Certified PayrollReqiured on all state or federal projectsWeekly payroll on federal projects
Link to wage and laborhttp://www.dot.state.mn.us/const/labor/
certifiedpayroll.html
Labor Compliance
Field Interviews
Fill in the form!
Coordinate with Poster Board
Check wages against Certified Payroll records
http://www.dot.state.mn.us/const/labor/documents/posterboards/employeeinterviewform.doc
Labor Compliance
Federal Aid or Work on Trunk Highway Projects
Call whenever you have a question (ADA)
Notify us at 95% + on Federal Aid projects
We will arrange to perform inspection
Final Inspection form
http://www.dot.state.mn.us/stateaid/ProjDeliv/dcp/FinalInspectionReport.doc
Final Inspection
State Aid Projects
Call if questions existRequest For Final Payment automatically notifiesForm will be used to approve paymentForm will exist only in our file unless requested
Final Inspection
Regulated Waste
Lead Paint and Asbestos
Mark VogelOffice of Environmental [email protected]
Environmental Concerns
Metro District State Aid Construction Training
Elisa Bottos Metro State Aid
Construction Engineer651-234-7766
Jim DeenyMetro State Aid
Construction Specialist651-234-7762
Thank you