42
MONTHLY SAFETY MEETING for October 2012 Habshan 5 IGD Project, Abu Dhabi, UAE JGC-Tecnimont Joint Venture

HSEOct2012

Embed Size (px)

DESCRIPTION

http://www.h5jvhse.com/Safety/Documents/Presentation/HSEOct2012.pdf

Citation preview

Page 1: HSEOct2012

MONTHLY SAFETY MEETING

for October 2012

Habshan 5 IGD Project, Abu Dhabi, UAE

JGC-Tecnimont Joint Venture

Page 2: HSEOct2012

Monthly Meeting October 2012 PRESENTATION AGENDA

Project Lost Time Injury Frequency Rate & Recordable Frequency Rate;

Days and Man-hours without LTI and Days and Man-hours without RI;

JV Monthly Medical Consultation for October 2012;

Cumulative Up to September 2012, FAC Body Part for October 2012;

Noncompliance with safe work Issues for October 2012;

Poor Housekeeping Issues for October 2012;

Equipment & Tool Issues for October 2012;

PPE Issues for October 2012;

JV Risk Assessment Graph, High Medium & Low Risk Analysis;

NM, UC & UA Observation Report and Trend Analysis for JV;

Area Violation, Incident Violation for the Month of for October 2012;

Safety Moment, Toolbox Meeting, and Safety Alert;

Manpower & Observation Up to October 2012;

Training Man-Hours Up to October 2012;

Monthly KPI and Target 2010 – 2012;

Safety Achievement for October 2012;

Safety Campaign for November 2012.

Page 3: HSEOct2012

0.00

0.10

0.20

20102011 2012 PTD

0.13 0.10

0.06 0.06

TOTAL RECORDABLE INJURY RATE

- PROJECT YEARLY STATISTICS

0

5

10

15

7

11

7

3

FIRST AID CASE

COMPARISON TABLE

Total Recordable Injury Rate

Construction Period To Date

Man-Hours 5,361,848 110,046,094

Recorable Case 0 32

TRIR 0.00 0.00 0.06 0.31

Days w/o Rec.

Case 199

Up to

02/11/2012

Date of Last Rec. Case 19-Apr-12

Man-Hours Worked Since Last RI 31,883,118

0.06

0.29

0.00

0.20

0.40

0.60

0.80

1.00

1.20

TR

IR

MONTH

Total Recordable Injury Rate Target TRIR = 0.20

-0.01

0.00

0.01

0.02

20102011 2012 PTD

0.003 0.002 0.002

LOST TIME INJURY

FREQUENCY RATE - PROJECT

YEARLY STATISTICS

RIR, LTI x 1,000,000/man-hours - Company

RIR, LTI x 200,000/man-hours - JV

0.002

0.01

0

0.02

0.04

LTIR

MONTH

Lost Time Injury Frequency Rate Target LTIR = 0.02 Lost Time Injury Frequency Rate

Construction Period To Date

Man-Hours 5,361,848 110,046,094

LTI 0 1

LTIR 0.00 0.002 0.01

Days w/o LTI 472 Up to 02/11/2012

Date of Last LTI Case 19-Jul-11

Man-Hours Worked Since Last LTI 75,426,033

Page 4: HSEOct2012

Monthly Meeting October 2012

0

0

20,000,000

40,000,000

60,000,000

80,000,000

January 7, 2010

Starting Project

up to

Nov. 2, 2012

75,426,033

Date of Last LTI Case : 19th July 2011

JV DAYS & Man-hours Without LTI

Up to October 2012

Page 5: HSEOct2012

Monthly Meeting October 2012

0

0

10,000,000

20,000,000

30,000,000

40,000,000

January 7, 2010

Starting Project

up to

Nov. 2, 2012

31,883,118

Date of Last RI Case : 19th April 2012

JV DAYS & Man-hours Without

Recordable Up to October 2012

Page 6: HSEOct2012
Page 7: HSEOct2012

Monthly Meeting October 2012

937

220

442

39

406

503

3

0

0

1,665

378

22

169

46

244

233

0

0

0

839

0 500 1000 1500 2000

Respiratory Problem (Cold,Cough etc.)

Genito-Urinary Diseases

Gastro-Intestinal Disorder (Diarrhea Abdominal Pain)

Etc.

Systemic Problem Hypertension Etc.

EENT (Eyes, Ear, Nose and Throat)

Skin Infection / Allergy

First Aid Minor Scratches, Bruises, Laceration,

Abrassions, Insect Bites, Etc.

Major Accident/Injury

Heat Stress

Others, Backache, Muscular Pain, Toothache, Etc.

JGC TCM

JV Monthly Medical Consultation

for the month of October 2012

Page 8: HSEOct2012

Monthly Meeting October 2012

MTC,

24

RWC, 7

LTI, 1

Recordable

FAC

475

Reportable

FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case

LTI-Lost Injury Incident

CUMULATIVE

Up to October 2012

Page 9: HSEOct2012

Monthly Meeting October 2012

Finger, 1,

34%

Leg, 1,

33%

Shoulder,

1, 33%

FAC by Body Part

For the Month of October 2012

Page 10: HSEOct2012
Page 11: HSEOct2012

Monthly Meeting October 2012

Equipment & Tool

PPE

Poor House Keeping

Noncompliance with safe work

JV Observation Table

for October 2012

Page 12: HSEOct2012

Noncompliance with safe work (A)

2 4 16 13 19 18 7 4

109 106

198

108

212

110 170 152

677

838

0

100

200

300

400

500

600

700

800

900

October 2012-1,353 September 2012-1,410

Monthly Meeting October 2012

Page 13: HSEOct2012

Noncompliance with safe work (A)

Others

September 2012 - 677

8

2 17

4

14

13

19

7 10

49

20

33

29

26

27

45

28

63

50

120

93

0 50 100 150

Security

No Banksman

Grating

Falling Object

Restricted Area

STARRT CARD Violation

Signage

Confined Space

Hot Work

Hygiene

Worker Behavior

illumination

Trip/Slip/Fall

No Flagman

Health

Open Hole

Environmental

Cable Management

Access and egress

Barricade

Scaffolding

Monthly Meeting October 2012

9

3 42

18

8

1

32

0 24

26

8

29

46

55

17

58

51

81

64

111

155

0 50 100 150 200

Security

No Banksman

Grating

Falling Object

Restricted Area

STARRT CARD Violation

Signage

Confined Space

Hot Work

Hygiene

Worker Behavior

illumination

Trip/Slip/Fall

No Flagman

Health

Open Hole

Environmental

Cable Management

Access and egress

Barricade

Scaffolding

October 2012 - 838

Page 14: HSEOct2012

Poor House Keeping (B)

7 14

30 38

23

82

42

104

67

104

77

53

132 133

0

20

40

60

80

100

120

140

October 2012 - 501 September 2012 - 378

Monthly Meeting October 2012

Page 15: HSEOct2012

PPE (D)

6 2

27 28 35

78

29

58

4 16

55

79 86 80

92

136

0

20

40

60

80

100

120

140

160

October 2012 - 477 September 2012 - 334

Monthly Meeting October 2012

Page 16: HSEOct2012

Equipment & Tool (C)

0 5

64

160

22 22

135

101

69 78

48

92

55 43

54 44

0

20

40

60

80

100

120

140

160

180

October 2012 - 545 September 2012 - 447

Monthly Meeting October 2012

Page 17: HSEOct2012

702

1,118

749 662

1,394

820

0

200

400

600

800

1000

1200

1400

1600

Low Medium High

September 2012 October 2012

September 2012 – 2,569

October 2012 – 2,876

JV Risk Assessment Graph Monthly Meeting October 2012

Page 18: HSEOct2012

Near Miss, Unsafe Act and

Unsafe Condition Observation Report

and Trend Analysis for October 2012

776

1,793

749

7 0 0 0 0 0

807

2,069

820

3 0 0 0 0 0 0

500

1000

1500

2000

2500September 2012

October 2012

FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case LWC-Lost Work Case | FAT – Fatality LTI-Lost Time Injury

Monthly Meeting October 2012

Page 19: HSEOct2012

Area Violation by Issues for the Month of October 2012

302 Observation Issues

299 Observation Issues

355 Observation Issues

2

1 1,444 Observation Issues

271 Observation Issues

106 Observation Issues

1 Near Miss

2 AD

99 Observation Issues

1 Near Miss

Page 20: HSEOct2012

Monthly Meeting October 2012

October-25-2012

Falling Object @ C200

Incident Violation Indicator Area Focus

for the Month of October 2012

October-15-2012

Grating Removal Violation

@ Unit 552

1st

1st

Page 21: HSEOct2012

Monthly Meeting October 2012

Safety Moment for October 2012

Page 22: HSEOct2012

Monthly Meeting October 2012

Toolbox Meeting

for October 2012

Page 23: HSEOct2012

Monthly Meeting October 2012

Safety Alert

for October 2012

Page 24: HSEOct2012

Monthly Meeting October 2012

17,226

2,876

Manpower Observation

Manpower and Observation

for October 2012

Page 25: HSEOct2012

Monthly Meeting October 2012

164,072

Total Training Man-Hours 2,038,726

Up to October 2012

Page 26: HSEOct2012

Monthly Meeting October 2012

Training Man-hours – 164,072

for October 2012

HOUR CRAFT

INDUCTION

Induction

Training

TCM JGC

1,568

984

246

22

PERMIT TO WORK, LOCKOUT TAG OUT

& SUPERVISOR SKILL LEADERSHIP

WORKSHOP

Supervisor Training

TCM JGC

STARRT/TOOLBOX

MEETING/COACHING

Site Training

TCM JGC

56,835

97,921

WORK AT HEIGHT

STARRT & JSA

CONFINED SPACE ENTRY

SAFE DRIVING

FIRE FIGHTING

IIF Orientation

Heat Stress

SAFE USE OF HAND GRINDER

Inert GAS

ELECTRICAL SAFETY

HAZARD IDENTIFICATION…

Specific

Training

TCM JGC

2,280

4,216

Page 27: HSEOct2012

Monthly Meeting October 2012 SITE TRAINING SUCCESS

1,200,000

1,250,000

1,300,000

1,350,000

1,400,000

1,450,000

1,500,000

1,550,000

IIF/STARRT/TOOLBOX/COACHING

January - May 2012 June - Oct. 2012

Page 28: HSEOct2012
Page 29: HSEOct2012

Monthly Meeting October 2012

Monthly KPI and Target 2010 – 2012 Up to September 2012

Target 0

Target 0.02

Target 0.20

Target >1000

1

0.002

0.06

2,876

Page 30: HSEOct2012

Monthly Meeting October 2012

Page 31: HSEOct2012

STARRT MASTERS Monthly Meeting October 2012

Page 32: HSEOct2012

3 GOLDEN RULES Monthly Meeting October 2012

Page 33: HSEOct2012

TOTAL IIF PATROL 103

Page 34: HSEOct2012

TOTAL IIF PATROL

42 MEMBERS!

Page 35: HSEOct2012

Monthly Meeting October 2012

Page 36: HSEOct2012

Monthly Meeting October 2012

COMPRESSOR MECHANICAL

RUN-IN TEST

•Proper Barricade for Activity •Good House Keeping and Barricade

•Tool Box Talk before Test •Site Check before Activity

Page 37: HSEOct2012

Monthly Meeting October 2012 FFG IGNITION TEST

Page 38: HSEOct2012

Monthly Meeting October 2012 COMMISSIONING AREA ACCESS BREAKING NEWS!!!

Page 39: HSEOct2012

Monthly Meeting October 2012 CATALYST LOADING

Page 40: HSEOct2012
Page 41: HSEOct2012

Monthly Meeting October 2012

NO SMOKING IN

CONSTRUCTION AREA

Page 42: HSEOct2012

SAFETY FOR LIFE