Monthly Safety Meeting for June 2012
Habshan 5 IGD Project, Abu Dhabi JGC-Tecnimont Joint Venture
Presentation Agenda Project Lost Time Injury Frequency Rate & Recordable Frequency Rate;
Days and Man-hours without LTI and Days and Man-hours without RI;
JV Monthly Medical Consultation for June 2012;
Cumulative Up to June 2012;
FAC Body Part for the Month of June 2012;
Noncompliance with safe work Issues for the Month of June 2012;
Poor Housekeeping Issues for the Month of June 2012;
Equipment & Tool Issues for the Month of June 2012;
PPE Issues for the Month of June 2012;
JV Risk Assessment Graph, High Medium & Low Risk Analysis;
NM, UC & UA Observation Report and Trend Analysis for JV;
High Risk Summary for June 2012;
Area Violation, Incident Violation for the Month of June 2012;
Safety Moment, Toolbox Meeting, and Safety Alert;
Manpower & Observation Up to June 2012;
FSO Ratio on Site for June 2012
Training Man-Hours Up to June 2012;
Action Tracking Register Up to June 2012;
Monthly KPI and Target 2010 – 2012;
Safety Campaign for July 2012
Weather Report for June 2012
0.00
0.01
0.02
20102011 2012 PTD
0.003 0.002 0.002
LOST TIME INJURY
FREQUENCY RATE - PROJECT
YEARLY STATISTICS
0.00
0.05
0.10
0.15
0.20
2010 2011 2012 PTD
0.13 0.10
0.07 0.07
TOTAL RECORDABLE INJURY RATE
- PROJECT YEARLY STATISTICS
0
10
20
3021
9 8 8
FIRST AID CASE
COMPARISON TABLE
Lost Time Injury Frequency Rate
Construction Period To Date
Man-Hours 4,542,081 90,223,085
LTI 0 1
LTIR 0.00 0.002 0.02
Days w/o LTI 346 Up to 29/06/2012
Date of Last LTI Case 19-Jul-11
Man-Hours Worked Since Last LTI 55,602,424
Total Recordable Injury Rate
Construction Period To Date
Man-Hours 4,542,081 90,223,085
Recorable Case 0 32
TRIR 0.00 0.00 0.07 0.35
Days w/o Rec.
Case 71
Up to
29/06/2012
Date of Last Rec. Case 19-Apr-12
Man-Hours Worked Since Last RI 12,059,509
0.002
0.02
0
0.02
0.04
LTIR
MONTH
Lost Time Injury Frequency Rate Target LTIR = 0.02
0.07
0.35
0.00
0.20
0.40
0.60
0.80
1.00
1.20
TR
IR
MONTH
Total Recordable Injury Rate Target TRIR = 0.20
RIR, LTI x 1,000,000/man-hours - Company
RIR, LTI x 200,000/man-hours - JV
0
0
20,000,000
40,000,000
60,000,000
JV Days & Man-Hours without LTI
Up to June 2012
January 7, 2010
Starting Project
up to
June 29, 2012
55,602,424
Date of Last LTI Case : 19th July 2011
ACHIEVING 1 YEAR WITHOUT LTI
0
0
5,000,000
10,000,000
15,000,000
JV Days & Man-Hours without Recordable
Up to June 2012
January 7, 2010
Starting Project
up to
June 29,
2012
12,059,509
Date of Last RI Case : 19th April 2012
JV Monthly Medical Consultation
For the Month of June 2012
874
155
386
54
320
298
5
0
1
1,277
297
33
273
31
206
251
2
0
0
1,081
0 200 400 600 800 1000 1200 1400
Respiratory Problem (Cold,Cough etc.)
Urinary Tract Infection
Gastro-Intestinal Disorder (Diarrhea Abdominal Pain)
Etc.
Systemic Problem Hypertension Etc.
EENT (Eyes, Ear, Nose and Throat)
Skin Infection / Allergy
First Aid Minor Scratches, Bruises, Laceration,
Abrassions, Insect Bites, Etc.
Major Accident/Injury
Heat Stress
Others, Backache, Muscular Pain, Toothache, Etc.
JGC TCM
Cumulative
Up to June 2012
MTC,
24
RWC, 7
LTI, 1
Recordable
FAC
441
Reportable
FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case
LTI-Lost Injury Incident
FAC by Body Part
For the Month of June 2012
Head, 2,
25%
Fingers, 3,
37%
Ear, 1, 12%
Forearm, 1,
13%
Leg, 1, 13%
JV Observation Table
for June 2012
Equipment & Tool
PPE
Poor House Keeping
Noncompliance with safe work
Noncompliance with safe work (A)
12 2 25 17 26 21 43 10
123 94
184 149
238 210 257
199
790
957
0
200
400
600
800
1000
1200
June 2012-1,659 May 2012-1,698
2
4
5
7
10
14
16
21
21
25
27
35
36
41
43
64
66
80
122
151
0 50 100 150 200
No Banksman
Falling Object
Restricted Area
Security
Worker Behavior
Confined Space
Signage
No Flagman
Grating
Hot Work
Trip/Slip/Fall
Health
Hygiene
Environmental
Open Hole
illumination
Access and Egress
Scaffolding
Cable Management
Barricade
Noncompliance with safe work (A) – Others
June 2012 - 957 May 2012 - 790
3
3
3
4
6
9
11
11
17
17
18
28
37
41
46
46
48
54
106
120
329
0 100 200 300 400
No Banksman
Security
Falling Object
STARRT CARD Violation
Restricted Area
Confined Space
Hot Work
Signage
Health
Worker Behavior
Grating
Hygiene
No Flagman
illumination
Environmental
Trip/Slip/Fall
Open Hole
Scaffolding
Cable Management
Access and egress
Barricade
Poor House Keeping (B)
27 29 40 43 59
25
83 80 94 105 105
187
296 320
0
50
100
150
200
250
300
350
June 2012 - 789 May 2012 - 704
PPE (D)
8 7
34
52
38 35
61 54
74
19
74 59
89
125
141
158
0
20
40
60
80
100
120
140
160
180
June 2012 - 509 May 2012 - 519
Equipment & Tool (C)
8 7 16
87
34 26
41 34
90
42
94
22
96
37
108
36
0
20
40
60
80
100
120
June 2012 - 291 May 2012 - 487
878
1795
735 838
1654
756
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Low Medium High
May 2012 June 2012
May 2012 – 3,408
June 2012 – 3,248
JV Risk Assessment Graph
Near Miss, Unsafe Act and Unsafe Condition Observation Report
and Trend Analysis for June 2012
870
2,538
735
8 0 0 0 0 0
900
2,348
756
8 0 0 0 0 0 0
500
1000
1500
2000
2500
3000
May 2012 June 2012
FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case LWC-Lost Work Case | FAT – Fatality LTI-Lost Time Injury
High Risk Summary
for June 2012 Equipment & Tool 34 Noncompliance with safe Work 483
Poor maintenance 18 Work at height 167
Incorrect usage 5 Fire Prevention 129
Unauthorized operation 5 Lifting and rigging 77
Inappropriate safety device 4 Electrical safety rule 74
Wrong equipment/tool 2 PTW 16
Miscellaneous 193 Traffic rule 16
Barricade 52 Excavation Safety 4
Access and egress 23 Poor House Keeping 28
Environmental 17 Cleaning of rubbish on site 11
Scaffolding 17 Material arrangement 5
Cable Management 14 Material on access 5
Open Hole 14 waste disposal 4
Trip/Slip/Fall 11 Hazardous material storage 1
Grating 10 Protruding nails 1
Hygiene 9 Segregation of waste 1
Worker Behavior 5 PPE 18
Restricted Area 4 No Body Harness/Lanyard 6
Health 3 No hard hat 4
Hot Work 3 Inappropriate Clothes 3
No Flagman 3 No Eyes/Face Protections 3
No Banksman 2 No ear protection 1
Signage 2 No Hand Protections 1
Confined Space 1
Falling Object 1
Illumination 1
Security 1
Area Violation by Issues for the Month of June 2012
2
681 Observation Issues
301 Observation Issues
413 Observation Issues
6
1,531 Observation Issues
2 Near Miss
1 ADS
2 ADS
226 Observation Issues
2 Near Miss
96 Observation Issues
2 Near Miss
June-27-2012
PTW Violation @ Unit
512
June-04-2012
Spanner fell from Height
@ Flare Area, F3
1st
Incident Violation Indicator Area Focus
for the Month of June 2012
June-23-2012
PTW Violation @
Unit 533
1st
2nd
June-10-2012
Tanker hit the scaffold
@ Flare Area, PR-F100
June-07-2012
Scaffold tube fell from
height @ C200
2nd
1st
June-07-2012
Pipe fell from height @
C200
2nd
Safety Moment for June 2012
Toolbox Meeting for June 2012
Safety Alert for June 2012
19,446
3,248
Manpower Observation
Manpower and Observation
for June 2012
FSO Ratio on Site (1:100) Manpower 19,446
For June 2012
Direct (Site) - 4,418
Indirect – 1,219 Staff – 595
Total 6,232
88:Direct Worker / 100 141:Direct Worker / 100
+26
Direct (Site) - 11,552
Indirect – 828 Staff – 834
Total 13,214
+44
149,900
Total Training Man-Hours 1,369,177
Up to June 2012
Training Man-hours Completed 149,900
for June 2012
HOUR CRAFT
INDUCTION
Induction
Training
TCM JGC
1,236
2,904
66
124
PERMIT TO WORK, LOCKOUT TAG OUT
& SUPERVISOR SKILL LEADERSHIP
WORKSHOP
Supervisor Training
TCM JGC
STARRT/TOOLBOX
MEETING/COACHING
Site Training
TCM JGC
59,458 71,638
WORK AT HEIGHT
STARRT & JSA
CONFINED SPACE ENTRY
SAFE DRIVING
FIRE FIGHTING
IIF Orientation
Heat Stress
SAFE USE OF HAND GRINDER
Inert GAS
ELECTRICAL SAFETY…
Specific
Training
TCM JGC
7,179
7,295
Action Tracking Register Up to June 2012
8,043
694 386
130 170 36 67 18
8,012
674 376
125 163 36 61 15 31 20 10 5 7 0 6 3 0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Safety
Walkdown
JV Site Audit GASCO
Observation
JV HSE
Meeting
JV Food Audit Corporate
Audit
Hygiene and
Sanitary
Facilities
Emergency
Evacuation
Drill Report
last 16th April
2012Raised Closed Open
10,462 10,217
245
Total Action Tracking
Register
http://www.h5jvhse.com/index2.php
0
0.01
0.02
0.03
Lost time Injury Frequency Rate
Actual LTIR Target LTIR
0.00
0.20
0.40
0.60
0.80
1.00
1.20
Total Recordable Injuries Rate
Actual RIR Target RIR
Monthly KPI and Target 2010 – 2012 Up to June 2012
0
1
Fatality Rate
Actual Fatality Target Fatality
0500
1000150020002500300035004000
Observation + Near Misses Cases
Actual (Observation + Near Misses)
Target (Observation + Near Misses)
Target 0
Target 0.02
Target 0.20 Target >1000
1
0.002
0.07
3,248
Safety Campaign Materials
For July 2012
SAFETY ALERT
Grating Removal
During the month of July 2012
an incident occurred about
Permit Violation and Grating
Removal
COACHING
Using Mobile Phone on Site
Coaching Activities Starting July
12-19 and Lead by Safety
Engineers JGC and Tecnimont
will be conducting lectures
about dangers using mobile
phone by Drivers and Operators
while driving.
HAZARD HUNT
Falling Object
All safety engineers (TCM-JGC)
will conduct The Hazard Hunt
that applies to all locations,
elevated areas and All work-sites
should be inspected for potential
dropped objects. Hazard Hunt
day on July 22, 2012
SURVEY
Survey on Site
JGC and Tecnimont will
conduct spot check on the
result of coaching regarding
understanding on the danger
of using mobile phone while
driving. 40% of the
driver/operator doesn't know
the risk. 60% knowledgeable.
45
41 41 40
42
44 44
47
41
48
45
40
40
42 42 43
1.0
6.0
11.0
16.0
21.0
26.0
31.0
36.0
41.0
46.0
51.0
56.0
Habshan 5 PJ | Daily Weather Report
> 54 Temperature - Heat Stroke
Extreme Danger
41 - 53 Temperature - Sunstroke, Heat Cramps, or Heat Exhaustion likely Heatstroke possible with prolonged exposure and physical activity
Danger
June 2012
0
0
0
20112012
30 2
Heat Related Illness