A skidded heavy duty Hydraulic Workover Unit complete with 10/15K BOP stack and a 15K pump; this unit is exceptional at drilling out frac plugs on deep horizontal wells where other services are unable to push on the bit.
2 8 5 K G U I D E D R I G L E S S
Piston Well Services intends to provide the best possible snubbing services to the
industry for the most predictable and repeatable outcome through excellence in leadership, planning and innovation.
HPHT Hydraulic Workover Unit
Dual Handling Winches
Built-in Gin Pole
Dual Motor Rotary
Proprietary Tubing Handling System for Efficient Trip Times
Patented HALO System
Torque Track to Increase Stability While Drilling
Modular Components for Quick Rig-up/Out Times
B E N E F I T S
103, 6439 - 67 Street, Red Deer, Alberta, Canada T4P 1A3David Wilkie | 403 872 9887 | [email protected] | PistonWell.com
We are the go-to snubbing company for high pressure and high temperature solutions. With up to 120 years of combined experience per crew, our group of employees are second to none, and we supply nothing but the best equipment for the job. Contact us today to find out how we can be the difference for you!
The Piston Difference
MAX HOIST
MAX SNUB FORCE
6,600 ft / lb rotary halo equippedROTARY
11.5 ft strokeSTROKE
120 gallon koomey five function
285k lift 4-leg 142k 2-leg
880 Hp Cat 3412 power pack
540 Hp Cat C15 back-up
Five sets of 300k slip bowls
Slip interlock package
169k snub 4 leg 84k 2 leg
ACCUMULATOR
40m3 mud tank with agitators and two mixing pumpsMUD TANK
Msi ti 600 pump 15kPUMP
POWER PACK
SLIPS
10/15k cameron u stackBOP’S
Skid mountPOWER PACK
55’ + 10’ extension x 10,000 lb with two counter-balance winches and one heavy winch
MAST
8 ftWORK WINDOW
8,000 mMAX DEPTH
14” workover, 8.25” snubbingTHRU BORE
TRIP SPEED
1.050” – 5.5” snubbing 1.050” – 10.75” workover
2-leg = 85 joints / Hr 4-leg = 45 joints / Hr
PIPE SIZE