Phoenix Transportation 2050 Plan
Light Rail & Bus Rapid Transit• 75 miles of new bus rapid transit• 42 miles of new light rail stations• Addition of new rail stations• New Transit Centers• Wi-Fi on rail • Increased security/K-9 unit• $40 billion of economic return on light rail investment (estimate) • Reloadable fare cards
Transit 2000 .4% Dedicated to Public Transit
65% Voter Approved - March 2000Sunset in 2020
Phoenix Transportation 2050 .7% Dedicated to Transit & Transportation
55% Voter Approved - August 2015Sunset in 2050
Improved bus service*
Improved RAPID*/CommuterNew RAPID/Commuter
New bus service
New Park-n-RidesP
Mejoras al servicio de autobús*
Mejoras al servicio interurbanoNuevo servicio interurbano
Nuevo servicio de autobús
Nuevos Park-n-RidesP
*May include increased peak frequency, early morning and late night service, and/or route extensions.
*Podrá incluir servicio con mayor frecuencia en horas pico, temprano en la mañana y tarde por la noche, y/o prolongación de rutas.
New and Improved Local and RAPID/Commuter Bus Service PlanPlan de Servicio Nuevo y Mejorado de Autobús Local e Interurbano
Tatum Blv
d
91st Av
e
Happy Valley Rd
56th St
40th St
7th St
7th Ave
Cave
Creek
Rd
Deer Valley Rd
Dobbins Rd
99th Av
e
43rd Av
e
51st Av
e
Broadway RdSouthern Ave
59st Av
e67st Av
e
75th
Ave
P
P
P
PP
P
N
P
BiltmoreFashion Park
Paradise Valley Mall
44th St
Scottsdale Rd
New 48th StStation
Bell Rd
Dunlap Ave
Thomas Rd
Baseline Rd
24th St
Cent
ral A
ve
35th A
ve
Cactus Rd
19th A
ve
New bus rapid transit routeon either 19th or 35th Ave
Tranvía ligero actualNuevo tranvía ligeroNuevo servicio de transporte rápido de autobúsCirculador del centro
Expanded Light Rail and New Bus Rapid Transit Plan
Current light railNew light railNew bus rapid transitDowntown Circulator
Nueva ruta de transporte rápido de autobús en la Avenida 19 ó la 35
Plan de Expansión de Tranvía Ligero y Nuevo Servicio de Transporte Rápido
de Autobús
Capitol
Grand CanyonUniversity
79th AvePark-n-Ride
51st Ave
59th Ave
91st Ave
ASU West
NHappy Valley Rd
Deer Valley
Metrocenter Mall
Maryvale
LaveenSouth Mountain
Park
Arcadia Crossing
How Will the Transportation 2050 Plan Build Phoenix’s Future?Bus Service
• Increase bus frequency by 70%• Increased weekend bus service• New and extended routes• Service increase through 12 a.m. on week days and 2 a.m. on weekends for local bus and Dial-A-Ride• Enhanced ADA/ Dial-A-Ride service• Wi-Fi on buses • More shaded bus stops
Phoenix Transportation 2050 Plan
How Will the Transportation 2050 Plan Build Phoenix’s Future?
New Pavement*New and Expanded Streets*
*Planned improvements to streets may include new pavement, bike lanes, sidewalks, curb and gutter, streets lights and/or landscaping.
Map does not include planned improvements to local residential streets.El mapa no incluye mejoras planificadas a calles residenciales locales.
Nueva pavimentación*Ampliación y nuevas vías públicas
*Mejoras a las vías públicas planeadas podrán incluir nueva pavimentación, carriles para bici, aceras, bordes de aceras y cunetas, iluminación vial y/o jardinería.
91st Av
e
Happy Valley Rd
40th St
7th St
99th Av
e
43rd Av
e
51st Av
e59th Av
e67th Av
e
New River Rd
Union Hills Dr
Greenway Rd
Lone Mountain
Dynamite Blvd
Pinnacle Pk Rd
Bell Rd
Thunderbird Rd
Cactus Rd
Dunlap Rd
Shea Blvd
Camelback Rd
McDowell Rd
Broadway Rd
Baseline Rd
Elliot Rd
Ray RdChandler Blvd
75th Ave
107th Av
e
83rd Av
e Glendale Ave
N
74
303
Proposed Phoenix Major Street Improvement PlanPlan de Mejoras a Vías Principales de Phoenix
Light Rail Studies & Engineering • Northwest Extension Phase 2• Phoenix Capitol/I-10 West Corridor• South Central Corridor• Camelback Rd/Central Glendale Corriodor • Northeast Corridor
The Next 5
Years
Immediate Transit Improvements • Increase span of service: local bus & dial-a- ride hours of operation to match light rail• Weekend local bus service to 30 minute frequencies• Install over 300 shaded bus stops • Add 4 new/extended bus routes
Bicycle & Street Improvements • 84 miles of major street pavement overlays• 20 miles of new/upgraded sidewalks• 100 miles of new bicycle lanes• Add 30 new bus bays• Improvements to 3 major roadways
Street, Bicycle, and Pedestrian Improvements
• 680 miles of new asphalt pavement on major streets• 1,080 miles of new bicycle lanes• 135 miles of new sidewalks• 2,000 new street lights• $240 million set aside for major street improvement projects• Focus on connecting people to transit