SNP I The Business Transformation Company
M A R C U S S C O T T
S N P A U S T R A L I A
HOW TO MOVE TO SAP
S/4HANA IN 5 MONTHSBUSINESS VALUE AUTOMATION
C O L E S S T A N D S U P S A P S / 4 H A N A
F I N A N C E C O R E I N 5 M O N T H S
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
Watch the video here:
https://www.youtube.com/watch?v=Ep-KqrlrmrY&t=59
C O L E S : P R O J E C T D R I V E R S *
S A P L I C E N S E
P R O J E C T A L I G M E N T
A R I B A P R O G R A M H A S S A P E C C
O R S A P S 4 / H A N A D E P E N D E N C I E S
D I V E S T E D F R O M W E S T F A R M E R
SAP License signed in November 2018
Drive to leverage asset
Coles’ digital transformation project alignment
Unicode enabled in SAP ECC or S/4HANA System;
“Business Partner (BP)” function enabled system (S/4HANA) or the
mapping & integration of Ariba BP function to an existing ECC system
Divested from Wesfarmers in November 2018; With divestment from
Wesfarmers, no longer required to manage legacy companies (Kmart,
Target, Fosseys etc.)
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
*Source: Cameron Amling, Presentation at (Not Just) Brisbane Virtual Conference May 2020
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
C O L E S : P R O J E C T O P T I O N S *
OPTION 4OPTION 1 OPTION 3OPTION 2
Implement an S/4 environment for use by the Ariba
and SuccessFactors
projects.
Patch the existing ECC landscape in order to support use of standard
integration patterns for both
Ariba and SuccessFactors
Sidecar implementation of
S/4
Do nothing. Each project that
requires integration with ECC will require
extensive custom developments to
support the relevant
integration
*Source: Cameron Amling, Presentation at (Not Just) Brisbane Virtual Conference May 2020
© 2020 SNP – COMMERCIAL IN CONFIDENCESLIDE 3SNP I The Business Transformation Company
C O L E S : P R O J E C T O P T I O N S *
OPTION 1A
Perform migration of the
exiting SAP system to S4/HANA
(“brownfield”approach)
OPTION 1B
Establish a new S4/HANA
environment and
reimplement all existing ECCfunctionality (“greenfield”
approach)
OPTION 1C
Use the SNP tools and
services to perform a
“Bluefield” migration
(recommended)
OPTION 1
Implement an S/4 environment for use by the Ariba
and SuccessFactors
projects.
*Source: Cameron Amling, Presentation at (Not Just) Brisbane Virtual Conference May 2020
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
C O L E S : P R O J E C T O P T I O N S *
OPTION ADVANTAGE DISADVANTAGEESTIMATED
DURATION
1A: Brownfield
migration
• Most common approach currently • System will require some
patching to support this
approach
• Very high impact on Finance
Function
• ALL data must be migrated (ie.
No carve out)
• 8 months+
1B: Greenfield
implementation
• Full system redesign • Very high impact on Finance
function
• Potential long time to implement
given transformation
• 18 months +
1C: Bluefield
transformation
(recommended)
• Only migrate data that is required
• (historical and Target impacts)
• Only migrate customisations that are
• required
• Near Zero Downtime at cutover
• Minimal change management required
• Can be used regardless of current
• state/version
• Initial project provides minimal
finance transformation.
• Subsequent projects required to
fully utilise S/4 capability
• 5 months
*Source: Cameron Amling, Presentation at (Not Just) Brisbane Virtual Conference May 2020
P R O J E C T D E T A I L S *
S O F T W A R E B A S E D A P P R O A C H
Acclimation prime System Integrator (SI)
SNP subcontractor and responsible for the Data Migration
powered by CrystalBridge – The Data Transformation Platform
Project duration 5 months 2 weeks: On time and on budget
Implementation of Production, Non-Production and Disaster
Recovery on MS Azure
Lower than expected change management impact because of
Hybrid conversion approach & and minor business
transformation
Finance transformation is a subsequent phase
TIME
SAVINGS
DATA
SAVINGS
DOWNTIME
SAVINGS
PROJECT
SAVINGS
© 2020 SNP I The Data Transformation Company – www.snpgroup.com 7
*Source: Cameron Amling, Presentation at (Not Just) Brisbane Virtual Conference May 2020
B U S I N E S S B E N E F I T S
T H E S N P A P P R O A C H
C O N V E R T A T A N Y
P O I N T I N T I M E
R E T A I N F U L L O R P A R T I A L
H I S T O R I C A L D A T A
T R A N S F O R M A T I O N W I T H O U T
R E - I M P L E M E N T A T I O N
R A T I O N A L I S E &
H A R M O N I S E
M I N I M A L D I S R U P T I O N
& D E P E N D E N C Y
No dependency on Fiscal
Year end
All operational data available without the need
for archive/reference systems
Take full advantage of S/4 innovation whilst
retaining existing key developments and IP
Merge systems and harmonise
process and data for operations
and reporting
Minimize downtime at cut-over, less
demand for User Acceptance
Testing
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
T E C H N I C A L B E N E F I T S
T H E S N P A P P R O A C H
P R O D U C T I O N S Y S T E M
U N T O U C H E D
R E D U C E T E C H N I C A L
E F F O R T & T I M E
M I N I M I S E R I S K
C O M B I N E M A N Y P R O J E C T S I N
O N E
F L E X I B L E A P P R O A C H
Conversion performed on copy; no time
pressure and Production available as a
fall-back during cut-over
Prerequisite steps (prepare phase)
performed only once. All other
systems created from this initial seed
Take full advantage of S/4
innovation whilst retaining
existing key developments and IP
Move to cloud, Unicode, HANA and combine SAP and non-
SAP systems all in one project
Avoid existing platform and hardware
restrictions and limitations with de-
coupling of system and data
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
THE DATA TRANSFORMATION PLATFORM
S / 4 H A N A M E R G E M O D E R N I S E / H A R M O N I S E M O V E
C A R V E - O U T A S S E S S M E N T T E S T D A T A I N T E R F A C E S C A N
M U L T I P L E B U S I N E S S S C E N A R I O S
M i g r a t i o n t o
S / 4
C o m p a n y
m e r g e r
M o d e r n i s e s y s t e m s a n d h a r m o n i s e
d a t a
M o v e t o
C l o u d
C o m p a n y s p l i t
o f b u s i n e s s
u n i t
C R Y S T A L B R I D G E ® M I S S O N C O N T R O L
X - R a y o f y o u r
E R P s y s t e m .
F a s t , s e c u r e
a n d e a s y
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
Q u i c k l y p r o v i d e
c u s t o m i s e d ,
s c r a m b l e d d a t a
U n d e r s t a n d
s y s t e m a c c e s s
O N E I N T E G R A T E D S O F T W A R E P L A T F O R M F O R A L L P R O J E C T S C E N A R I O S
C U S T O M E R S U C C E S S S T O R Y
BUSINESS BENEFITS
D A T A S A V I N G
Reduction from 2.3TB
down to 900GB
T I M E S A V I N G
Project completed in 5
months
S A P S / 4 H A N A F I N A N C E C O R E M I G R A T I O N
C o l e s i s a l e a d i n g A u s t r a l i a n r e t a i l e r , w i t h
o v e r 2 , 5 0 0 r e t a i l o u t l e t s n a t i o n a l l y . F o r m o r e
t h a n 1 0 0 y e a r s t h e s u p e r m a r k e t h a s b e e n
d e d i c a t e d t o d e l i v e r i n g q u a l i t y , v a l u e a n d
s e r v i c e t o t h e 2 1 m i l l i o n c u s t o m e r s w h o
s h o p w i t h C o l e s e a c h w e e k“SNP‘s BLUEFIELDTM approach
seemingly does the impossible of
taking the old SAP system and
automating a large part of the
migration of not only the data but
all of the other parts and interfaces
of our old system, ensuring that
we could go live with S/4HANA.“
Roger Sniezek , Chief Information
and Digital Officer at Coles
A k e y c o m p o n e n t o f t h e p r o j e c t w a s t o
m a i n t a i n i n - f l i g h t p r o j e c t s a n d e m p o w e r
f u t u r e i n i t i a t i v e s . T h i s p r o j e c t w a s
c o n s i d e r e d m i s s i o n c r i t i c a l a n d i n c l u d e d
r e p o r t i n g f l o w s o n t o t h e A u s t r a l i a n
S e c u r i t i e s E x c h a n g e ( A S X ) .
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company
A S K F O R C A S E S U D Y
A B O U T SNP
S N P G L O B A L F O O T P R I N T
G L O B A L
Headquarters: Heidelberg
Founded: 1994
Employees: 1 ,500
Wor ldwide Off ices: 30+
Listed: Frankfurt Stock Exchange
A S I A
Headquarters: S ingapore
Founded: 2008
Employees: 200
Asia Off ices: 5
A S K F O R A D E M O
© 2020 SNP I The Data Transformation Company – www.snpgroup.com 12
P A R T N E R S & C E R T I F I C A T I O N
T H E S N P A P P R O A C H I S C E R T I F I E D A N D S U P P O R T E D B Y P A R T N E R S
S A P C E R T I F I E D A P P R O A C H
S O F T W A R E C E R T I F I E D
S N P G L O B A L P A R T N E R S
© 2020 SNP I The Data Transformation Company – www.snpgroup.com 13
T H A N K Y O UM e e t u s a t o u r v i r t u a l b o o t h
t o d a y a n d t o m o r r o w !
S N P A U S T R A L I A P T Y L T D | L e v e l 1 2 | 1 4 1 W a l k e r S t . | N o r t h S y d n e y N S W 2 0 6 0 | A u s t r a l i a
[email protected] Australia: +61 455 021 005 www.snpgroup.com
© 2020 SNP SE or an SNP affiliate company. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the
express permission of SNP SE or an SNP affiliate company. The information contained herein may be changed at any time without notice. Some software products
marketed by SNP SE and its distributors contain proprietary software components of other software vendors.
This document is a preliminary version and not subject to your license agreement or any other agreement with SNP. This document contains only intended strategies,
developments, and functionalities of the SNP product and is not intended to be binding upon SNP to any particular course of business, product strategy, and/or
development.
SNP assumes no responsibility for errors or omissions in this document. SNP does not warrant the accuracy or completeness of the information, text, graphics, links, or
other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied
warranties of merchantability, fitness for a particular purpose, or non-infringement.
SNP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these
materials. This limitation shall not apply in cases of intent or gross negligence.
SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate
company) in Germany and in several other countries.
All other product and service names mentioned are the trademarks of their respective companies.
Heidelberg, Germany 2020
D I S C L A I M E R
© 2020 SNP – COMMERCIAL IN CONFIDENCESNP I The Business Transformation Company