第 1 頁How To Do Pile Driving With Percussion Method | Piling | Pile Driving | Piling Construction
30/11/2010 15:48:47http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
Jetty & Seawater Intake
for chemicals, coal, power plants , marine
terminals in Indonesia
www.swijetty.com
Resonant Machines
High Tech Concrete Recycling Global
Leader-60% Less Job Costs
www.resonantmachines.com
Sheet pile design program
DeepXcav 2010 graphical & powerful with
structural design AISC, EC .
deepexcavation.com
Piling | Pile Driving | Piling Construction
Ads by
GooglePile Driving Sheet Piling Percussion Bored Pile
How To Do Pile Driving With Percussion Method
Posted by Harry Lee on April 15, 2009 at 8:26 pm · Under Pile Driving, Piling
There are several types of pile driving method in the piling construction, type of pile driving method used is
depending on the condition of soil and location of the site . However, different piling machine will be used with
different pile driving methods too. The specification for pile driving mentioned below is generally recommended
for pile driving of prestressed spun concrete piles by using percussion method . Engineers may be required to
modify some of the clauses to suit requirements of different site conditions.
How To Do Pile Driving With Percussion Method
1) Joints
The bending strength of a joint between two lengths of pile shall be equal or more than the bending strength of the
concrete shaft. When two lengths of pile are jointed, the end plates must bear over their complete areas. The two
end plates are then welded along their entire periphery with weld size as specified.
1.1 Welding of Joints
All welding shall be carried out in accordance with the requirements of B.S .5135:1974 - Metal-Arc Welding of carbon and carbon-manganese steel.
1.2 Tests for Approval of Welders
Welders shall be qualified in accordance with the requirementsof AWS Code D1.1. Only welders who pass the qualifying tests for the type of weld
specified shall be employed on the Works.
1.3 Examination of Welds
Butt welds between the end plates of the joints shall be tested using magnetic particle or dye penetrant test methods. Copies of these test records and reports
shall be furnished to the Engineer.
Where such examination reveals defects in the welds, the joints shall either be rejected or repaired. If repeat tests show the weld to be still defective, the
joint shall be rejected. The defective weld shall be removed, replaced with a fresh weld and re-examined.
For the purpose of this Clause, cracks, leaks, laminations, lack of complete fusion, undercutting or reduction in wall thickness adjacent to the weld shall
constitute a defect .
2) Pile Driving by Using Percussion Method
2.1 Pile Hammers
Shall be of size and type able to deliver consistently an effective dynamic energy suitable to the piles to be driven and the material into which they are to be
driven. Hammers shall be provided with proper driving helmets suited for the piles. Any indication of collapse of hoses, tripping of hose lining or any
erratic action of the hammer shall be cause for immediate shutdown until the problem has been corrected.
Pile hammers shall be operated at the full rated efficiency and capacity and in the manner specified by the manufacturer, except as directed otherwise by the
Engineer, or noted herein below under Reductiono of Hammer Energy.
When a steam or air hammer is used for driving any type of piles, both the volume and pressure of steam or air recommended by the manufacturer of the
hammer shall be maintained at all times to ensure full energy of the driving blows . Before pile driving is started, the Piling Contractors shall provide written
certification to the Engineer that the pile hammer, compressors and valves have been inspected and found to be in good working condition .
2.2 Reductiono of Hammer Energy
When the pile is set in a pre-jetted or pre-drilled hole or when the point of a prestressed concrete pile is passing through soft soil so that there is little or no
resistance to penetration of the pile, there is a possibility that longitudinal tensile stresses may be set up in the pile shaft by the elastic shock waves travelling
up and down the pile. For such driving conditions, the length of stroke of the hammer shall be reduced. Failure of the piles due to longitudinal tensile
stresses caused by excessive driving shall be the Contractor’s responsibility.
2.3 Pile Cushion Block
The heads of all prestressed concrete cylinder piles shall be protected with a soft wood cushion block at least 15 cm thick to effectively and uniformly
第 2 頁How To Do Pile Driving With Percussion Method | Piling | Pile Driving | Piling Construction
30/11/2010 15:48:47http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
distribute hammer blog energy. The block shall be composed of layers of 20mm hi-grade marine plywood or approved equal, and of such dimensions as to
completely cover the concrete cross -section of the pile. The cushion block shall be inspected periodically during driving and no driving shall be done with a
block that has been unduly worn and compressed with use. Cushion blocks must be replaced when compressed to 1/2 their original thickness, when badly
worn or when burning.
2.4 Driving
The piles shall be driven to the driving resistance or tip elevation as determined by the Engineer from pile load tests. The maximum allowable variation at
the butt end of the pile shall be 150mm in any direction from the location shown on the Drawings or as directed by the Engineer. Any variation beyond
these limits shall be allowed or rejected at the sole discretion of the Engineer.
3) Cutting Off and Capping Piles
Tops of foundation piles shall be embedded in the concrete footing or pile cap for a minimum depth of 75mm (measured at center line of pile). When the
top elevation of a pile is below the elevation of the bottom of the cap, the pile shall, if approved by the Engineer be built up from the butt of the pile to the
elevatioon of the bottom of the cap by an approved method. The cuts shall be made accurately in clean, straight lines; care shall be exercised to avoid
damaging the remaining pile and to ensure full bearing between the footings (or pilecaps) and piles.
Bookmark
Related Articles
What Is ICP Piles
How To Produce Super Strength Pile (SS Pile)
Procedure Of How To Drive A Pile
AuGeo Piling System
What Is Bored Piles
Permalink for How To Do Pile Driving With Percussion Method
Pile Driver www.dd-eng.com
Sheet Pile Driver, Auger Vibro Hammer, Vibro
Ripper
Icanda Corporation www.icanda.com
Slurry Walls / Cutoff Walls Deep Foundation
Specialist
Leave a Comment for How To Do Pile Driving With Percussion Method
Name (required)
E-mail required)
URI
Submit Blog Comment
第 3 頁How To Do Pile Driving With Percussion Method | Piling | Pile Driving | Piling Construction
30/11/2010 15:48:47http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
Ads by Google
Steel Sheet Pile
CFA Piles
Piles 13
Types of Piling
K-E Persson ABSeamless steelpipes,
Sheet Piles, Piling
equipment, and much
more!www.kepab.com
Detailing Software
Antiseismic
Technologies Static
Dynamic Analysis
Softwarewww.pi.gr
Rock Drills
Get Free ImportQuotes Export Ready
Suppliers From IndiaIndiaMART.com/Industrial_
Plants香香香香港港港港敲敲敲敲擊擊擊擊樂樂樂樂中中中中心心心心 HKPC
Rockin' regular
percussion courses!ABRSM, Drum set,
Parent & Childwww.hkpercussion .com
Zueblin Cage
MachinesAuto-Reinforce Precast
Products Concrete
Pipes Piles Poleswww.cagemachine .com
Categories
AuGeo Piling System
Bored Pile
Deep Foundation
ICP Pile
Micropile
Pile Driving
Piling
Piling Machine
Retaining Wall
Sheet Piling
Super Strength Pile
Recent Piling Articles
Structural Foundation - Retaining Wall and Bored Piles
What Is ICP Piles
AuGeo Piling System
What Is Micropile
Cold Formed Steel Sheet Piling
How To Do Pile Driving With Percussion Method
How To Drill Bored Pile
What Is Bored Piles
How To Produce Super Strength Pile (SS Pile)
第 4 頁How To Do Pile Driving With Percussion Method | Piling | Pile Driving | Piling Construction
30/11/2010 15:48:47http://pile-driving.com/how-to-do-pile-driving-with-percussion-method/
How To Handle And Store Pile
Archives
June 2009
May 2009
April 2009
March 2009
Popular Tag
AuGeo Piling System Bored Pile Bored Piles Bored Piling Bored Piling Machine Cast-In-Situ Concrete Cold Formed Steel Concrete Pile Construction Deep Foundation
Extension Pile Ground Treatment ICP Piles Initial Pile Load Test Micropile Micro Pile Micro Piles Percussion Method Pile Pilecap Pile Driving Pile Head Piles Piling PilingConstruction Piling Contractor Piling Machine Precast Concrete Precast Concrete Pile Prestress Pile RC Square Pile Reinfored Concrete Retaining Wall Sheet Pile Sheet
Piling Spun Pile SS Pile Steel Pile Structural Foundation Super Strength Pile Timber Pile
Blogroll
Corrugated Drain Pipe
Dock Pilings
Vinyl Sheet Piling
Google AdSense Almost Spring Theme with SEO by David Law, based on Almost Spring theme
Piping Work | Concrete Curb | Piling | Pile Driving | Piling Construction