    How should risk be evaluated and allocated in PPP contracts?

    [Response by Rui Cunha Marques, February 2010]

    Risk is defined as the probability of a particular event occurring. In PPP, risk allocation isimportant for the public authority, as it is at the heart of the value for money of the project,and therefore for determining the decision of opting for the PPP procurement option or not.The principle is that risks should be transferred to those able to control or mitigate them atthe lowest cost . Improved risk allocation reduces not only economic costs but also the needto enter a renegotiation process and provides incentives for a sound management of thePPP.

    The efficiency rule for allocating risk is quite simple. The public authority (e.g. municipality)should not transfer to the private partner risks that are under the authoritys control, nor should it assume risks that are out of its control. The transfer of risks to the private partner brings, in general, an increase in the price of the project, so it is essential to ensure that thepublic benefit of such transfers is greater than that increase in financial costs . This additionalcost derives from the risk premium that is required by the private sector to support it. Therisks should be assigned to the right parties and carefully defined ex ante before the signed

    contract . A risk matrix should be defined for each project where all the risks are identifiedand allocated, their probability evaluated and their (financial) impact quantified. Finally,mitigation measures should be established for each type of risk.

    a) Identification and classification of risks

    In the design of a contract , it is crucial to identify and allocate risks before the procurementstage. This should be done by constructing a risk matrix. The bidding documents shouldlimit ex ante situations that may lead to ex post opportunism and, in particular, to therenegotiation of the contract . Renegotiation should be restricted to the aspects that theprivate sector does not control (public authority risk) and is not able to predict (e.g. extremeevents or changes in public policy).

    Among several possible classifications, risks can be divided into production , commercial andcontextual risks . Some of these risks are associated with the bidding process stage andothers with the project implementation stage. While risks related to the production processare almost always best borne by the private sector , the commercial and contextual ones aremixed. Among the production risks are those associated with the planning , design, right of way acquisition, construction, environmental (e.g. permits), archaeological constraints(discovered in the construction phase), maintenance and major repairs, operational,technological and performance risks . Commercial risks comprise mainly the demand , collection, capacity availability, and competition riskswhere the latter could stem fromchanges in public policy or dramatic changes in technologies that alter the feasible scale of potential entrants. Finally, within the scope of contextual risks , financing, inflation , legislativechanges, judicial rulings, regulation , swings in public opinion, and force majeure are the

    most relevant. The importance of each risk depends on the project under consideration.However, consumption/demand and unilateral (one party) change risks are in general themost problematic ones and are major reasons for contract renegotiation. Contract renegotiation is one the main consequences of initially incomplete allocation of risks .

    b) Allocation of risks

    The allocation of each type of risk between private and public sector should occur accordingto the minimization of economic costs . However, some risks can subsequently betransferred to third parties. For example, the private partner can subcontract activities,passing the associated costs on to the subcontractors. Similarly, the private or public partners might transfer some risks on to the customers/users (e.g. via price increases whennew legislation mandates new environmental controls). In other cases, risk can be mitigatedthrough insurance .

    http://www.regulationbodyofknowledge.org/glossary/define/Risk%20allocation/http://www.regulationbodyofknowledge.org/glossary/define/Risk%20allocation/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Value/http://www.regulationbodyofknowledge.org/glossary/define/Option/http://www.regulationbodyofknowledge.org/glossary/define/Option/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Risk%20allocation/http://www.regulationbodyofknowledge.org/glossary/define/Risk%20allocation/http://www.regulationbodyofknowledge.org/glossary/define/Economic%20cost/http://www.regulationbodyofknowledge.org/glossary/define/Economic%20cost/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Efficiency/http://www.regulationbodyofknowledge.org/glossary/define/Efficiency/http://www.regulationbodyofknowledge.org/glossary/define/Efficiency/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Transfers/http://www.regulationbodyofknowledge.org/glossary/define/Transfers/http://www.regulationbodyofknowledge.org/glossary/define/Transfers/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Bidding/http://www.regulationbodyofknowledge.org/glossary/define/Opportunism/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Production/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Bidding/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Production/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Production/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Planning/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Demand/http://www.regulationbodyofknowledge.org/glossary/define/Demand/http://www.regulationbodyofknowledge.org/glossary/define/Demand/http://www.regulationbodyofknowledge.org/glossary/define/Capacity/http://www.regulationbodyofknowledge.org/glossary/define/Competition/http://www.regulationbodyofknowledge.org/glossary/define/Competition/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Inflation/http://www.regulationbodyofknowledge.org/glossary/define/Inflation/http://www.regulationbodyofknowledge.org/glossary/define/Regulation/http://www.regulationbodyofknowledge.org/glossary/define/Regulation/http://www.regulationbodyofknowledge.org/glossary/define/Regulation/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Public%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Public%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Economic%20cost/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Legislation/http://www.regulationbodyofknowledge.org/glossary/define/Mandates/http://www.regulationbodyofknowledge.org/glossary/define/Insurance/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Value/http://www.regulationbodyofknowledge.org/glossary/define/Option/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Risk%20allocation/http://www.regulationbodyofknowledge.org/glossary/define/Economic%20cost/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Efficiency/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Transfers/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Bidding/http://www.regulationbodyofknowledge.org/glossary/define/Opportunism/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Production/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Bidding/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Production/http://www.regulationbodyofknowledge.org/glossary/define/Process/http://www.regulationbodyofknowledge.org/glossary/define/Private%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Production/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Planning/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Demand/http://www.regulationbodyofknowledge.org/glossary/define/Capacity/http://www.regulationbodyofknowledge.org/glossary/define/Competition/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Inflation/http://www.regulationbodyofknowledge.org/glossary/define/Regulation/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Contract/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Public%20sector/http://www.regulationbodyofknowledge.org/glossary/define/Economic%20cost/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Cost/http://www.regulationbodyofknowledge.org/glossary/define/Public/http://www.regulationbodyofknowledge.org/glossary/define/Risk/http://www.regulationbodyofknowledge.org/glossary/define/Legislation/http://www.regulationbodyofknowledge.org/glossary/define/Mandates/http://www.regulationbodyofknowledge.org/glossary/define/Insurance/http://www.regulationbodyofknowledge.org/glossary/define/Risk%20allocation/