| 1
How many skilled people do we
need to train for which position
by 2030 to serve the rapidly
growing national and
international market?
WIND INDUSTRY is growing
around the world
and in SA
Source: https://www.esi-africa.com | 3
Roggeveld Wind Farm 140
The Karusa Wind Farm 140
The Nxuba Wind Farm 139
Golden Valley Wind Farm 117
Oyster Bay Wind Farm 140
Total 676
Onshore Wind Round 4
Section 1
Section 2
| 4
| 5
| 7
676 MW x 0.2=135.2O&M technicians
| 8
July 2012
Assessment of training and skills needs
for the wind industry in South Africa
Construction and Installation 10 jobs/ MW installed
Operation & Maintenance 0.2 – 0.4 jobs/ MW installed
| 9
http://www.globalwindsafety.org/download/2767/171016_gwo_basic_maintenance_training_standard_version_2pdf | 10
| 11
is a world class training facility
offers various world class qualifications
has experienced trainers
has well established relationships with international
training faclities
is the TRAINING CENTRE FOR THE SA WIND INDUSTRY