Housing and Multi-Activity (Advanced). Work Write-Ups, Specifications, and Requests for Bid. Work Write-Ups. A document that details individual tasks that will be addressed during the course of the Rehab project. Work Write-Ups. The Work Write-Up will contain: - PowerPoint PPT Presentation

Citation preview

Page 1: Housing and Multi-Activity (Advanced)

2009 DCA CDBG/CHIP Applicants’ Workshop

Housing and Multi-Activity (Advanced)

Work Write-Ups, Specifications, and

Requests for Bid

Page 2: Housing and Multi-Activity (Advanced)

Page 22009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups

• A document that details individual tasks that will be addressed during the course of the Rehab project.

Page 3: Housing and Multi-Activity (Advanced)

Page 32009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups

• The Work Write-Up will contain:▪ A Specification detailing materials to be

used.▪ The Method that will be used to install the

item.▪ The Quantity of the material required to

complete the task.▪ An Estimated Cost of the material and labor

required to complete the task.

Page 4: Housing and Multi-Activity (Advanced)

Page 42009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups: the Specification

• A Specification describes, in great detail, the material and it’s attributes that will be used in the completion of the task.▪ Size or quantity of material required.▪ Composition: wood, fiberglass, vinyl, tile,

linoleum, brick, Hardi-plank, tile, etc.▪ The material attributes: color, texture, pattern.▪ Quality or manufacturer name brand (“or

equal”)

Page 5: Housing and Multi-Activity (Advanced)

Page 52009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups: the Specification

• A Specification describes, in great detail, the method of installation that will be used to complete the task.▪ Attaching hardware type.▪ Procedures and steps necessary to ensure

professional results – Manufacturers Instructions.

Page 6: Housing and Multi-Activity (Advanced)

Page 62009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups: Standard Units of Measure

• The Standard Unit of Measure is the basic unit by which the material is sold.▪ Square foot – sq. ft.▪ Square yard – sq. yd.▪ Each – ea.▪ Linear foot – Lf.▪ Square – sq.▪ Gallon – gal.

Page 7: Housing and Multi-Activity (Advanced)

Page 72009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups: Unit Cost

• The Unit Cost is the cost of each standard unit of measure.▪ Paint: $19.75 per gallon▪ Base board: $ .88 per linear foot▪ Windows: $225.00 each▪ Carpet: $15.15 per square yard

Page 8: Housing and Multi-Activity (Advanced)

Page 82009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups: Quantity

• The quantity of materials, described in Units of Measure, that will be needed to complete the task.▪ 722 sq. ft.▪ 13 sq. yd.▪ 17 each▪ 275 Lf.

Page 9: Housing and Multi-Activity (Advanced)

Page 92009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups: Cost

• Costs: the Unit Cost multiplied by the number of units (Standard Units of Measure) required.▪ 12 gal. @ $19.75/gal. $237.00▪ 135 Lf. @ $.88/ Lf. $118.80▪ 9 windows @ $225.00 ea.$2025.00▪ 27 sq. yd. @ $15.15/yd. $409.05

Total: $2,789.85

Page 10: Housing and Multi-Activity (Advanced)

Page 102009 CDBG/CHIP Applicants’ Workshop

Work Write-Ups – an example

Page 11: Housing and Multi-Activity (Advanced)

Page 112009 CDBG/CHIP Applicants’ Workshop

Request for Bids

The Request of Bid contains the same information as the Work Write-Up

EXCEPT

The Unit cost and the Total cost

Page 12: Housing and Multi-Activity (Advanced)

Page 122009 CDBG/CHIP Applicants’ Workshop

Request for Bids

• Distribute the Request for Bid among as many QUALIFIED contractors as possible.

• Compare your cost estimate to those received from your contractors.

• Select best (not necessarily lowest) bid.• Ignore “Low Ball” bids.• Negotiate final cost with selected

contractor.

Page 13: Housing and Multi-Activity (Advanced)

Page 132009 CDBG/CHIP Applicants’ Workshop

Request for Bids - an example

Page 14: Housing and Multi-Activity (Advanced)

Page 142009 CDBG/CHIP Applicants’ Workshop

Things to Remember

• Have the homeowner initial each page of the Work Write-Up. Explain each item.

• Include the Request for Bids in the Final Contract.

• Have the home owner and contractor initial each page of the Request for Bids as part of the Final Contract.

• Your Anniversary Date and Spouse's birthday.

Page 15: Housing and Multi-Activity (Advanced)

Page 152009 CDBG/CHIP Applicants’ Workshop

Questions or Comments

Tom Spinks(404) 679-3128

[email protected]