1
House for architects and artists / AFGH Architects: AFGH / Andreas Fuhrimann Gabrielle Hachler ( Switzerland ) Clients: Andreas Fuhrimann, Gabrielle Hächler, Pipilotti Rist, Balz Roth Consutants: Reto Bonomo, Rüdin- gen ( Ing, ) , SJB.Kemptner.Fitze AG, Herisau ( H olzbauing. ) , Bau- physik Meier AG, Dällikon Project year: 2002-2003 Construction year: 2003-2004 Area: 1035 sqm Budget: $2,2M CHF ( USD$1,7M ) Common place and unrefined ma- terials such as concrete, timber, wood and galvanized steel were chosen, which animated each other when com- bined. Steps of 3d modeling Step 1 Step 2 Step 7 Step 8 Step 4 Step 5 Step 6 Step 3

House for architects and artists / AFGH

Embed Size (px)

DESCRIPTION

Poster of the 3D Modeling Project, House for architects and artists / AFGH

Citation preview

Page 1: House for architects and artists / AFGH

House for architects and artists / AFGH

Architects: AFGH / Andreas Fuhrimann – Gabrielle

Hachler ( Switzerland )

Clients: Andreas Fuhrimann, Gabrielle Hächler, Pipilotti Rist, Balz

Roth

Consutants: Reto Bonomo, Rüdin-

gen ( Ing, ) , SJB.Kemptner.Fitze

AG, Herisau ( H olzbauing. ) , Bau-

physik Meier AG, Dällikon

Project year: 2002-2003

Construction year: 2003-2004

Area: 1035 sqm

Budget: $2,2M CHF ( USD$1,7M )

Common place and unrefined ma-

terials such as concrete, timber, wood

and galvanized steel were chosen,

which animated each other when com-

bined.

Steps of 3d modeling

Step 1 Step 2

Step 7 Step 8

Step 4 Step 5 Step 6

Step 3