 Amit Nath |[email protected] Page 1 HOSPITAL PROCESS FLOW: 1. Area Evaluation:- y General y Site Map/Site Drawings y Soil and Land Evaluation (Height/Water level/Contour) 2. Market Analysis:- y People Dynamics y Gross Income Rate y Occupational Contract etc 3. Networking:-  y Rail/Roads/Communication/Conveyance/Commute 4. Completion/Referral:-  Next Option Rating I) ARCHITECTURE PL ANNING:  y Specialty Finding y Techno Requirement Gauges (area/Location) y Bed Strength(Wards etc ) y Critical Units y Diagnostics Planning y Pharmacy Planning y Horizontal and Vertical Expansions y Storing of Accessories 1. (Biomedical Waste) 2. (Power/Transformers) 3. (DC) 4. (Rain Water Harvesting) y Staircase/Ramp/Lifts y SLD(Single Line Diagram)for:- i. Plumbing ii. Electricals iii. AC iv. Gas(Medicals) y Flooring and Roofing y OT y OPD

HOSPITAL-PROCESS-FLOW

Embed Size (px)

Citation preview

Page 1: HOSPITAL-PROCESS-FLOW

7/29/2019 HOSPITAL-PROCESS-FLOW.

http://slidepdf.com/reader/full/hospital-process-flow 1/6

 

Amit Nath |[email protected] Page 1

HOSPITAL PROCESS FLOW:

1.  Area Evaluation:- 

y  General

y  Site Map/Site Drawings

y  Soil and Land Evaluation

(Height/Water level/Contour)

2.  Market Analysis:- 

y  People Dynamics

y  Gross Income Rate

y  Occupational Contract etc 

3.  Networking:- 

y  Rail/Roads/Communication/Conveyance/Commute

4.  Completion/Referral:- Next Option Rating 

I)  ARCHITECTURE PLANNING: 

y  Specialty Finding

y  Techno Requirement Gauges

(area/Location)

y  Bed Strength(Wards etc)

y  Critical Units

y  Diagnostics Planningy  Pharmacy Planning

y  Horizontal and Vertical Expansions

y  Storing of Accessories

1.  (Biomedical Waste)

2.  (Power/Transformers)

3.  (DC)

4.  (Rain Water Harvesting)

y  Staircase/Ramp/Lifts

y  SLD(Single Line Diagram)for:-

i.  Plumbing

ii.  Electricals

iii.  AC

iv.  Gas(Medicals)

y  Flooring and Roofing

y  OT 

y  OPD

Page 2: HOSPITAL-PROCESS-FLOW

7/29/2019 HOSPITAL-PROCESS-FLOW.

http://slidepdf.com/reader/full/hospital-process-flow 2/6

 

Amit Nath |[email protected] Page 2

y  Sitting/Waiting Arena

II)  CIVIL DRAWING: 

y  Land Evaluation Concepts

y  Entry/Exit Point 

y  Floor wise Segmentation

y  Process Flow:-

i.  Patient Flow

ii.  Staff Flow

iii.  Material Flow

iv.  Waste Flow

y  Time Scaling

y  Outlook and Branding

y  Design Comparisons

III)  ARCHITECTURE-BUILDING: 

y  Raw Materials Quality Check 

y  Contracts and Agreements(Tender Management)

i.  Time Scale Mapping

ii.  Progression Check 

y  Foundation

y  Pillaring and Support 

y  Scanning and Projections

y  Stages:-i.  Base

ii.  Preparation

iii.  Implementation and Installation

iv.  S Fittings and Calibrations

y  4 Phases of Architecture:-

i.  Concept Plan/Execution

ii.  Assembly

iii.  Testing

iv.  Fine tuning of  Process and Corrections

y  Instrumentation/Tools and Machinery

y  Power

Page 3: HOSPITAL-PROCESS-FLOW

7/29/2019 HOSPITAL-PROCESS-FLOW.

http://slidepdf.com/reader/full/hospital-process-flow 3/6

 

Amit Nath |[email protected] Page 3

IV) a)  INSTRUMENTATION PLANNING (IP): 

y  Need for Quality Instruments and Equipments

y  Rationalization on Requirement to Budget and time f rame

y  Vendor Selection(Make/Manuf acture By)

y  Versioning

y  Rate and Negotiations

y  Cross Check and Evaluation

b)  PROCUREMENT: 

y  Imports

y  Logistics

y  Customs

y  Commission Tax

y Licensing and Documentation

y  Warranty/Accessories etc 

c)  COMMISSIONING: 

y  Implementation and Assembly

y  Beta Trail and Calibration

y  Training and Handling

y  Alpha Trial and Launch

y  Usable , Consumables and Accessories Count 

V) a)  STAFFING/HUMAN RESOURCES(HR): 

y  Analysis of Recruitment 

y  Minimal Head Count Strategy

y  Company Policy and Reforms

y  Source or Database

y  Strategy of HR Recruitment 

y  Interview

y  Negotiations

b)  COMPANY POLICY DESIGN: 

y  SOP(Systematic Operation Protocol)

y  KRA(Key Responsibility Area)

y  HR-Protocols:-

i.  Letters to off er

ii.  Letters to Appointment 

y  Salary structure and Reimbursement 

Page 4: HOSPITAL-PROCESS-FLOW

7/29/2019 HOSPITAL-PROCESS-FLOW.

http://slidepdf.com/reader/full/hospital-process-flow 4/6

 

Amit Nath |[email protected] Page 4

y  Attendance and Leave Policy

y  Employee Welf are and Medicals

c)  ORIENTATION 

d)  TRAINING: 

y  On Site

y  Judgmental/Probation

VI)  INFORMATION TECHNOLOGY (IT): 

y  Planning

y  Resources Selection

y  Budget 

y  Inf rastructure Decision:-

i.  Hardware

ii.  Software

iii.  Networking

iv.  IP 

v.  Consumables

y  Departmental Count 

y  Implementation

y  Training

y  Trials and Fine tunes

y  Synergies of Delta/PACS, Tele Radiology (as expansion) etc..

VII)  BRANDING/MARKETING: 

y  Strategies

y  Ref errals

y  Budget 

y  Time Frame(PERT)

y  People Involved

y  Services and Vendor Selection

y  Prints Required:-

i.  Brochures

ii.  Name Plates

iii.  Boards

iv.  Banners

v.  Hand outs

y  Out Reach Comparison

y  Reach Outs-SMS/Integrations

y  Website

Page 5: HOSPITAL-PROCESS-FLOW

7/29/2019 HOSPITAL-PROCESS-FLOW.

http://slidepdf.com/reader/full/hospital-process-flow 5/6

 

Amit Nath |[email protected] Page 5

VIII)  EVENTS: 

y  Staff  Orientation/Training

y  Community Responsive News/Social Responsibilities

y  Camps

y  Outreach Program

IX)  DEPARTMENTAL MUST PROCUREMENT: 

y  Ambulatory Services

y  Pharmacy Station

y  Drug Purchase

y  Diagnostics Accessories

y  CSSD- Instruments and Consumables

y  Linen

y House

Keeping

y  Electricals

y  Plumbicals

y  Stores and Inventories/Assets

y  Canteen/Restaurants

y  ATM/Banking Facilities

y  Insurance and Scheme Counters

y  Tele communication and internet 

y  Stationeries

y  Official/Admin Equipments

y  Patient Facilitation/Comforts

y  Toiletries

y  Furniture͛s

y  Prints of all vouchers/receipts

y  Prescription(PRINTABLES)

X)  ACCREDITATION/LICENSING 

y  Patient Count on:-

i.  Schemed Plan

ii.  Health Insurance

y  Profitability Factors

y  ROI

y  SOP/KRA/GHP 

y  Audits/Assessment 

y  Finals

y  GHP Accreditation

Page 6: HOSPITAL-PROCESS-FLOW

7/29/2019 HOSPITAL-PROCESS-FLOW.

http://slidepdf.com/reader/full/hospital-process-flow 6/6

 

Amit Nath |[email protected] Page 6

XI)  MANAGEMENT: 

y  Phase Study

y  Time Framing

y  Motion study of Fund/

y  ROI Forecasting

y  Purchase and Assets Management 

y  Specialty Forecast and Strategic testing

XIII) DELIEVERABLES: 

y  Products

For f urther information please contact 

 Amit Nath 

Max Medi Support Pvt. Ltd

Bangalore - 560 076

Phone: +91 80 4093 1112

E-Mail: [email protected]

web: http://www.maxmedisupport.com