20
Horizon 2020 Il Fast Track to Innovation Webinar Soci APRE, 4 febbraio 2015

Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Horizon 2020

Il Fast Track to Innovation

Webinar Soci APRE, 4 febbraio 2015

Page 2: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

2

Verso Horizon 2020

2014 - 2020

Europa 2020

Innovation Union

7

PQ EIT

CIP

Horizon 2020

2007 - 2013

H2020: la strategia

Page 3: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Struttura H2020

Excellent Science

European Research Council

Frontier research by the best individual teams

Future and Emerging Technologies

Collaborative research to open new fields of innovation

Marie Skłodowska Curie actions

Opportunities for training and career development

Research infrastructures (including e-infrastructure)

Ensuring access to world-class facilities

Industrial Leadership

Leadership in enabling and industrial technologies

ICT, nanotechnologies, materials, biotechnology, manufacturing, space

Access to risk finance

Leveraging private finance and venture capital for research and innovation

Innovation in SMEs

Fostering all forms of innovation in all types of SMEs

Societal Challenges

Health, demographic change and wellbeing

Food security, sustainable agriculture, marine and maritime research & the bioeconomy

Secure, clean and efficient energy

Smart, green and integrated transport

Climate action, environment, resource efficiency and raw materials

Inclusive, innovative and reflective societies

Security society

European Institute of Innovation and Technology (EIT)

Spreading Excellence and Widening Participation

Science with and for society

Joint Research Center (JRC)

EURATOM

Fast track to innovation

Page 4: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

4

TIPE OF FUNDING ACTIONS (art.6 RfP)

RESEARCH AND INNOVATION ACTION

INNOVATION ACTION

SME INSTRUMENT

FAST TRACK TO INNOVATION

CO-FUND ACTION

COORDINATION AND SUPPORT ACTIONS

PROGRAMME CO-FUNDING ACTIONS

PRE-COMMERCIAL PROCUREMENT (PCP)

PUBLIC PROCUREMENT OF INNOVATIVE SOLUTIONS (PPI)

AWARD

COLLABORATIVE PROJECT (SMALL-MEDIUM SCALE, LARGE INTEGRATING)

NETWORK OF EXCELLENCE

COORDINATION AND SUPPORT ACTIONS (SUPPORTING/COORDINATING TYPE)

RESEARCH FOR THE BENEFIT OF SMES/SME ASSOCIATIONS

ERANET/ERANET PLUS

Page 5: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

5

Fast Track to Innovation - FTI: cosa è?

Il FTI pilot (2015-2016) è l’unica misura pienamente “bottom-up” in Horizon 2020 finalizzato a promuovere le c.d. “azioni/innovazioni vicine al mercato” ed aperto a qualsiasi tipo di partecipante

Page 6: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

6

The visual identity

Page 7: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Regole e caratteristiche (1)

7

Finanziato tramite Innovation Action ma…

• Funding rate = 70% (100% per no profit)

• Min 3 max 5 partner

• Parteniarati «industry driven» ma qualsiasi entità giuridica

avente sede legale in MS o AC è eleggibile

• Contributo max per progetto = € 3 m (media € 1-2 m)

• Durata max progetto = 36 mesi (media 12 – 24 mesi)

Page 8: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

8

Criteri di eleggibilità:

Consorzi min. 3 - max. 5 partner Obbligatorio coinvolgimento dell’industria *

Almeno il 60% del budget della proposta a beneficio dei partner industriali

oppure per numero di partner: almeno 2 industrie su 3 o 4 partner oppure 3/5

Regole e caratteristiche (2)

* Private for profit entities

Page 9: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

9

• Time-to-market: 36 mesi o meno dall’inizio del progetto

• Punto di partenza = TRL 6 (per innovazioni tecnologiche)

• Punto di arrivo = TRL 9

• Logica business plan

• Valore aggiunto UE

Regole e caratteristiche (3)

Page 10: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

10

TRL 1 – basic principles observed TRL 2 – technology concept formulated TRL 3 – experimental proof of concept TRL 4 – technology validated in lab TRL 5 – technology validated in relevant environment (industrial environment in the case of key enabling technologies) TRL 6 – technology demonstrated in relevant environment (industrial environment in the case of key enabling technologies) TRL 7 – system prototype demonstration in operational environment TRL 8 – system complete and qualified TRL 9 – actual system proven in operational environment (competitive manufacturing in the case of key enabling technologies; or in space)

General Annexes

TECHNOLOGY READINESS LEVEL

Page 11: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Idee progettuali: esempi

11

1. Development of a new drug: should have already been tested in Phase 1 -> Phase 2 clinical studies will be funded

2. Medical devices: Class III device safety has been demonstrated -> final

product design validation and final prototype production and testing will be funded

3. Scale-up and initiate validation of GMP manufacturing process 4. Validation of assays for manufacturing quality control and

immunogenicity

Page 12: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Attività progettuali: esempi

12

• Advanced and specific research and development

• Advanced performance testing

• Piloting

• Demonstration activities

• Final validation of a system in the operational environment

• Business model validation

• Marketing activities (not purely commercial)

• Activities for strategic commercial and technical relevance

Page 13: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

L’approccio “Open call” e il budget

13

Apertura call: 6 gennaio 2015

Scadenze/Cut off dates:

Budget € 100m 2015 (€ 100m 2016)

Cut-off dates 2015 29/4/2015 1/9/2015 1/12/2015

Cut-off-dates 2016 TBD TBD TBD

Page 14: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Proposta e criteri di valutazione*

14

1. Excellence 1.1 Objectives 1.2 Relation to the work programme 1.3 Concept and approach 1.4 Ambition

2. Impact 2.1 Expected impact: 2.2 Measures to maximize the impact:

Dissemination and exploitation of results Intellectual Property, knowledge protection and regulatory issues Communication

3. Implementation 3.1 Work plan – Work package and deliverable 3.2 Management structure and procedures (only to the extent relevant in single entity proposals) 3.3 Consortium as a whole (if applicable) 3.4 Resources to be committed

* Sezione 1, 2, 3 Parte B = max 30 pagine

Page 15: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Il processo di valutazione (1)

15

• Solo da remoto

• Panel di 4 valutatori (expertise commerciale e finanziaria)

• No consensus meetings

• ESR molto sintetici media aritmetica delle 4 valutazioni

• Brevi feedback ai proponenti

• Soglia minima:

• Totale = 12/15

• Sul Criterio dell’Impatto = 4/5

Page 16: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

16

Il processo di valutazione (2)

• Le proposte che non raggiungono la soglia di 12/15 non sono finanziabili

• Le proposte che non raggiungono la soglia di 4/5 sull’Impatto non sono finanziabili

• In caso di parità di punteggio sarà data preferenza ad una proposta sulla base dei seguenti indicatori:

– Value of 'Impact' criterion

– Size of budget allocated to SMEs

– Number of first-time industry applicants

– Number of industry participants

– Gender balance of consortium staff performing the proposed action

Page 17: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

TIME TO GRANT (art.20)

ESITO DELLA VALUTAZIONE 3 MESI

DALLA SOTTOMISSIONE della PROPOSTA

FIRMA DEL GRANT AGREEMENT 3 MESI

DALLA COMUNICAZIONE DEGLI ESITI DELLA VALUTAZIONE

TTG = 6 mesi

TEMPISTICA FTI

Vs 8 mesi in H2020 (11 mesi in 7PQ)

Page 18: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Differenze con SME Instrument

18

• Fully bottom-up • Consortial approach • Not SME related

• Obligatory to be on market after 3 years

• No coaching support • One-stage scheme

• Topics • Single participation possible

• Restricted to SMEs • No obligation to be on market

after phase 3 • Coaching support

• 3 phases

FTI SME I

Page 19: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

Link utili

Horizon 2020 http://ec.europa.eu/programmes/horizon2020/

Participant portal https://ec.europa.eu/research/participants/portal/desktop/en/opportunities/h2020/calls/h2020-ftipilot-2015-1.html

Fast Track http://ec.europa.eu/programmes/horizon2020/en/h2020-section/fast-track-innovation-pilot-2015-2016

EASME http://ec.europa.eu/easme/sme_en.htm

Regole di partecipazione

http://ec.europa.eu/research/participants/portal/desktop/en/funding/reference_docs.html#h2020-legal-basis-rfp

APRE

http://www.apre.it/ricerca-europea/horizon-2020/fast-track-to-innovation/

19

Page 20: Horizon 2020 - UNIVPM · Horizon 2020 2007 - 2013 H2020: la strategia . Struttura H2020 Excellent Science ... Dissemination and exploitation of results Intellectual Property, knowledge

20

GRAZIE PER L‘ATTENZIONE!

Antonio Carbone [email protected]

National Contact Point

SMEs, ICT & Access to risk finance

APRE Agenzia per la Promozione della Ricerca Europea

Via Cavour, 71 00184 - Roma

www.apre.it Tel. (+39) 06-48939993

Fax. (+39) 06-48902550