HOLCIM MINING AND DEVELOPMENT CORPORATION (BUENAVISTA QUARRY PROJECT) Brief Project Description The Holcim Mining and Development Corporation is a duly registered corporation that engages mainly in supplying of cement and aggregates (crushed stone, sand and gravel, limestone and other minerals. The company is already operational since 2000 and operating 7.7 million tons in all cement plants nationwide. The increasing needs for cement require additional limestone raw materials which is currently being process by the company to sustain its operation and meet the demand of the market. I. Need for the Project The proposed project will be engaging into quarrying of limestone which serve as component for cement and will be use for the increasing demand for government project especially during this build-build program of the government as well as fast development of different infrastructure project and road projects. This project will not intend purely in business and to gain more profit, but this innovations, patented designs, and inventions is intended to support the government policies and commitment to fast track development activities especially projects related to construction. Company’s Goal: Ensure progressive, responsible, and sustainable mining operation. Our mining operation is not merely the extraction of raw materials, but to serve society.

HOLCIM MINING AND DEVELOPMENT CORPORATION …

  • Upload
    others

  • View
    18

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HOLCIM MINING AND DEVELOPMENT CORPORATION …

HOLCIM MINING AND DEVELOPMENT

CORPORATION

(BUENAVISTA QUARRY PROJECT)

Brief Project Description

The Holcim Mining and Development Corporation is a duly registered

corporation that engages mainly in supplying of cement and aggregates

(crushed stone, sand and gravel, limestone and other minerals. The

company is already operational since 2000 and operating 7.7 million tons

in all cement plants nationwide.

The increasing needs for cement require additional limestone raw materials

which is currently being process by the company to sustain its operation

and meet the demand of the market.

I. Need for the Project

The proposed project will be engaging into quarrying of limestone

which serve as component for cement and will be use for the increasing

demand for government project especially during this build-build program

of the government as well as fast development of different infrastructure

project and road projects.

This project will not intend purely in business and to gain more profit,

but this innovations, patented designs, and inventions is intended to support

the government policies and commitment to fast track development

activities especially projects related to construction.

Company’s Goal:

Ensure progressive, responsible, and sustainable mining operation. Our

mining operation is not merely the extraction of raw materials, but to serve

society.

Page 2: HOLCIM MINING AND DEVELOPMENT CORPORATION …

Company’s Vision:

HMDC is the preferred mining and mining- derived resource developer

and supplier driving innovative environmental, social, safety, and

economic solutions.

Company’s Mission:

- To community and environment

We share in the success of the communities we are in by instill…. a legacy

that respects its continued ecological, social, and cultural development.

- To customers

We establish and uphold collaborative partnerships with our customers in

delivering quality resources and serve to the end users.

- To people

We create and build leaders to ensure the sustainability of our business, our

relationship, and our values.

- To shareholders

Our shareholders see us as partners in safeguarding, valuing, and growing the

company’s economic growth and corporate reputation.

II. Alternatives being considered

The limestone material is increasing demand because it is use for cement

production, project siting are:

• availability of lot property;

• the property is covered by Transfer Certificate of Title (TCTs);

• accessibility and ideal for the proposed development considering the

limestone deposits;

• compatibility with the existing land use as well as the support of the

Local Government Unit (LGU) in favor of the project;

• the area is far from the community and free from any informal settlers

and no indigenous people present at the project site; and

• basic services are available.

Page 3: HOLCIM MINING AND DEVELOPMENT CORPORATION …

There are no alternatives identified for the project site location as it

was determined by the setting of the deposit. Land development

such as roads was strategically planned to minimize the hauling

distance from quarry to plant facility.

There are alternative identified for the project site location as it was

determined by the setting of the deposit. The processing facility was

strategically chosen to be situated near the mineralize are to

minimize hauling distance from quarry to plant facility. Moreover, the

chosen site is also near the causeway, where the loading activities

will be performed, minimizing handling and hauling cost. There are

also no sitting alternatives considered for the auxiliary facilities as

most of them are existing facilities of the ANLP and will be

continuously used during ALP operations.

The project siting, water, power source considerations are

summarized in Table.

Component Alternatives Decision Criteria

One Resource

Alternative 1: Nickel

Laterite Deposits

Nickel deposit needs

more exploration work

Alternative 2: Gold and

Copper Deposits

Gold deposits within the

MPSA boundary are

currently deemed not

economically feasible to

mine.

Further exploration work

is needed.

Alternative 3: Limestone

Deposits(selected)

The limestone deposit is

found to be a high-

grade resource of

CaCO3/CaO.

Project can promote

continuity of the

employment

opportunities for the

community after the

HMDC ends.

Project can supplement

the demand for

Page 4: HOLCIM MINING AND DEVELOPMENT CORPORATION …

aggregates and cement

industries in Mindanao

and nearby regions

Mine Site Brgy. Buenavista,

(selected)

Location of the

limestone are deposit.

Site is considered with

low flood susceptibility

but with low landslide

susceptibility according

to the Mines and

Geosciences Bureau,

therefore, ground

stability techniques

should be utilized.

Crushing Plant Site Alternative 1: Flat area

north of deposit

Identified location of the

stockpile area.

Location far from the

causeway, increasing

hauling costs.

Alternative 2: Northwest

of deposit(selected)

Location is near relative

to both the deposit and

the causeway,

increasing hauling cost.

Resource Utilization

(Power)

Power Alternative 1:

Local grid (selected,

main)

Project site communities

are all connected and

taping to DAVAO Light.

Power Alternative 2:

Generator sets

(selected, secondary)

Generator sets will be

used in case of power

interruptions or as

additional source of

power.

Resource Utilization

(Water)

Water Alternative 1:

local creek(selected)

local Creek will be the

source of freshwater for

water lorries and Craft

Transport (LTC)

Water Alternative 2:

Deep Well(selected)

Deep Well will be the

source of water for the

campsite/domestic

water requirements

Page 5: HOLCIM MINING AND DEVELOPMENT CORPORATION …

For the mining method, quarrying which is the most widely accepted method on

limestone deposit recovery is selected. Crushing and screening will also be caried

out to produced the desired sizes of limestone products. The method and

technology selection criteria are summarized in Table below.

Table Technology and Process Alternatives

Component Alternatives Decision Criteria

Mining Method Surface Mining

(Quarrying)(selected)

The geology and

mineralization within the

area is shallow and

suggests a surface

mining approach

following technical and

economic

considerations There is

no other method

considered given this

type of deposit

Blasting Alternative 1:

Electrohydraulic blasting

This blasting method is

still unproven.

Requires large amount

of water and power

utilization

Alternative 2:

Conventional rock

blasting(selected)

Site is not considered an

area susceptible to

liquefaction according

to PHILVOCS.

Controlled blasting to be

implemented to

minimized effect of

noise, vibrations and

dust.

Alternative 3: Dozer

ripping (or no blasting)

Ripping will be done

when competence of

the ore will not require

blasting

Comminution Crusher alternative 1:

Jaw crusher

Jaw crusher is a

commonly used primary

crusher and is best

Page 6: HOLCIM MINING AND DEVELOPMENT CORPORATION …

suited for high hardness

rocks.

Crusher alternative 2:

Impact

crusher(selected)

Impact crusher is used to

minimize production of

unwanted fine products

Impact crushers have

higher crushing

efficiency than crushers.

III. Proposed location of project facilities/components and alternatives

considered in the decision

Project alternatives provide design concept and layout options

encountered during early stages of project development that

required management decisions. It starts with a project description

and comparison of the various alternatives plans/designs that were

considered in the feasibility study and project impact analysis which

formed that basis for final approved (architectural and engineering)

plans.

The EIA guidelines require that the proponent provide a discussion of

the consequences of not carrying out the project full project

implementation as to the proposed project plan

- No Action, No Use to the area

The no action- no use of the area provides that the project will not

come unto existence and the no activity would take place in the

area. Therefore, the probable impacts of construction and

operation of the proposed limestone quarry will not be

experienced.

On the other hand, the inaction corresponds to lost opportunities

not only for the barangay and the city but more importantly to

the aspiring locals who will be potentially deprived of job

opportunities.

Page 7: HOLCIM MINING AND DEVELOPMENT CORPORATION …

- Full Project Implementation as to the Proposed Project

Development Plan

This alternatives assumes full project implementation, that is, the

installation and operation of quarry project in the barangay.

The establishment of quarry project and development of the area

into a full-scale commercial establishment shall boost further the

City’s local trade and economic activities. This is in the form of

procurement of locally available construction supplies and

increased demand for goods and services particularly during the

operation stage.

During initial construction stage, an initial of 30 workers will be

required. During operation of quarry project, it will generate 50

jobs from daily hire, contractual and permanent job placement

for the people in the locality and nearby places.

- Comparison of the Project Alternatives

The full project development and no action alternatives are of

opposite objectives that may result in either advantages or

disadvantages.

In the case of full project implementation, the immediate host

community of Brgy Buenavista and Panabo City will be entitled to

a share of realty and sales taxes. It will also open a variety of

opportunities like employment of qualified individuals from the

locality and neighboring barangays and provision of needs and

services as well. The establishment of a treatment facility in the

area would mean further increase of commercial activities that

may attract other businesses entrepreneurs to put up

complimentary businesses particularly those that cater to the

employees budget range. In addition, the problem on the supply

of limestone and cement will be resolved.

Page 8: HOLCIM MINING AND DEVELOPMENT CORPORATION …

The operation of the limestone quarry project require utilities such

as electricity and water during its operational life. This in turn will

add up to the resource users/consumer in the area. Likewise, the

operations would result in generation of solid and liquid wastes,

which requires proper handling and disposal.

The “no action” alternatives on the other hand, will not create

negative environmental impact as there would be no activity on

the site and will remain as it is.

IV. A Map showing the project site/s and the proposed EIA Study Area

Project Site :

Specific Location: Brgy. Buenavista, Panabo City, Davao Del Norte

Coordinate : 7°16'11.5"N 125°35'26.8"E

\

Page 9: HOLCIM MINING AND DEVELOPMENT CORPORATION …

V. Aerial Photos of the Project Site

Page 10: HOLCIM MINING AND DEVELOPMENT CORPORATION …
Page 11: HOLCIM MINING AND DEVELOPMENT CORPORATION …
Page 12: HOLCIM MINING AND DEVELOPMENT CORPORATION …
Page 13: HOLCIM MINING AND DEVELOPMENT CORPORATION …

VI. Project Proponent

Name of Proponent : Holcim Mining and Development

Corporation

Address of the Proponent : Pan-Philippine Highway,

Bunawan, Davao City, Davao

Del Sur

VII. Projected timeframe of the project phases

Project Phases Timeframes

1. Pre-Construction June 2021

2. Construction / Installation September 2021

3. Commissioning and Dry-run

Operation January 2022

4. Operation February 2022

5. Abandonment Dependent of the material

available

VIII. Preliminarily identified environmental aspects for each alternatives

1. Wastewater – waste treatment facility (WTF) will be established in

the project site in order to treat waste water from washing area.

A septic tank for comfort rooms will be established also.

2. Air Emission – Activated carbon filters will be installed before

releasing to the chimney to make sure that all air pollution

parameters area within the standard of RA 8749 and other related

laws and policies.

Page 14: HOLCIM MINING AND DEVELOPMENT CORPORATION …

3. Solid Waste Management

3.1 Domestic Waste - all domestic waste produce in the

operation of the project will be temporary stored in the

Material Recovery facility (MRF) for sorting for possible reuse

and recycling of waste. Identified waste will be separated

for the collection of the Waste Management Office of the

LGU Davao for disposal in the Sanitary Landfill (SLF).

Page 15: HOLCIM MINING AND DEVELOPMENT CORPORATION …

Lists of Participants for the Public Scoping

Name Barangay / Sector / Agency /

Sector Position

Hon. Suganob Nilo Brgy. Buenavista Punong Barangay

Hon. Orlita Algarme Brgy. Buenavista Barangay Kagawad

Hon. Eliaser Bacalso Brgy. Buenavista Barangay Secretary

Hon. Lourece Mark Libre Brgy. Buenavista Barangay Kagawad

Hon. Renedicto Onias Brgy. Buenavista Barangay Kagawad

Hon. Angel Pugado Brgy. Buenavista Barangay Kagawad

Hon. Allan Sanane Brgy. Buenavista Barangay Kagawad

Hon. Lito Sanani Brgy. Buenavista Barangay Kagawad

Hon. Sunny Boy Mahinay Brgy. Buenavista Barangay S.K

Chairman

RED Bagani Fidel A. Evasco DENR XI Regional Executive

Director

RD Engr. Mario Bulacan DENR-EMB XI Regional Director

RD Atty. Jasper Alberto L. Lascano MGB XI Regional Director

Hon. Jose Ralampagos LGU Panabo City Mayor

Hon. Janrey G. Gavina LGU Panabo City Vice Mayor

Hon. Janno Paolo Gentiles LGU Panabo City Councilor

Hon. Gregorio Dujali LGU Panabo City Councilor

Hon. Atty. Devona Jumamil LGU Panabo City Councilor

Hon. Emeterio Blase LGU Panabo City Councilor

Engr. Bernardo C. Rabanoz LGU Panabo City Engineer

Engr. Felix Jonases P. Senajon LGU Panabo City ENRO

Community Members

Community Members

Community Members

Community Members

Community Members

Community Members

Page 16: HOLCIM MINING AND DEVELOPMENT CORPORATION …

Community Members

Community Members

Community Members