    PRE-GROUTING AND WATER CONTROL SOME OF

    ,BEHIND ITS SUCCESS IN TUNNELLING

    NB # 4

    PRE-GROUTING FOR STABILITY AND OVER-BREAK CONTROL

    PRE-GROUTING FOR WATER CONTROL

    COMPARING PARTICLE SIZE WITH JOINT APERTURE LUGEON TESTING FOR APERTURE ESTIMATION (e and E)

    TYPICAL HIGH-PRESSURE GROUTING QUANTITIES

    1

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    2/79

    -water inflow in THE NEXT THREE or FOUR ROUNDS OF

    TUNNEL ADVANCE

    2

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    3/79

    PRE-INJECTION FANS FOR PROTECTING THE NEXT 4

    TO 6 ROUNDS

    3

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    4/79

    THIS ELKEM EXAMPLE HAS OUTER BLOCKER-GROUT TO

    ALLOW HIGHER PRESSURE WHEN LOW COVER

    4

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    5/79

    PRE-INJECTION MAY ALSO PREVENT PROBLEMS LIKE THIS

    - CONCRETE VOLUMES LATER WHEN LINING

    5

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    6/79

    PRE-GROUTING TOREDUCE FUTURE

    ....AND CURING

    PROBLEMS

    6

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    7/79

    LOW COVER HIGH WATER TABLE DEEP WEATHERINGAN APPROACHING RIVER CROSSING.

    GOOD PRE-GROUTING IS IMPERATIVE!

    7

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    8/79

    SKETCHES OF WHY

    PRE-GROUTING IS

    IF TUNNELS(AND STATIONS) ARE

    THEREFOREIN WEATHERED,PERMEABLE,LESS STABLEROCK MASSES !

    8

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    9/79

    OBVIOUSLY LEAKING JOINTS ARE EASY TO

    GROUT.. BUT THE TIGHT ONES THAT ALSOLEAK.?

    9

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    10/79

    The dilemma is how to get blocks

    (i.e. particles) that are too large in

    joints that are too tight.

    10..smaller particles! .. wider joints!

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    11/79

    Before leaving large blocks and

    concentrating on cementparticles.note problems

    -

    in mine ore passes!

    Blockage if D< 4.d95

    Boundary layer

    Wall roughness

    Slow particles

    11

    problems with large blocksand wall roughness

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    12/79

    IN TUNNEL WALLS

    with grout ???

    12

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    13/79

    SOME FUNDAMENTAL PHYSICAL ATTRIBUTES OF ROCK JOINTS

    13

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    14/79

    HEAD LOSSES IN JOINTS AND BOUNDARY LAYER EFFECTS

    14

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    15/79

    EFFECTIVE STRESSES IN WATER AND GROUT INJECTION

    The existin a ertures can be chan ed b fluid ressure which is ver

    15

    advantageous in grouting!

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    16/79

    WATER INJECTION TESTS LUGEON METHOD

    16

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    17/79

    Pay special attention to % of zero flow sections

    AVERAGESPACING OF WATER CONDUCTING JOINTS

    17% of zero flow stages means 1.8 conducting joints per test lengthon average

    17

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    18/79

    SOME MORE SIMPLIFICATIONS ARE NEEDED!

    BECAUSE WE ARE ENGINEERS WE NEED A SOLUTION!

    This is how we modified from Snow 1968

    18

    visualize the conducting network of joints

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    19/79

    WE WILL NOW WORK WITH TWO DIFFERENT JOINT APERTURES

    19

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    20/79

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    21/79

    THEORETICAL INTERPRETATION (IN 3D) OF LUGEON RESULTS

    ,

    permeability of one smooth parallel plate : k = e2/12

    permeability of 1 set of parallel plates : K1 = e2

    /12 x e/S

    permeability of the conducting rock mass (3 sets) : Kmass 2e3/12 S

    1 Lugeon 10-7m/s, 10-7m/s 10-14 m2, laminar flow

    3D interpretation of Lugeon tests e (6LS x 10-8)1/3

    e an n m me ers, s average ugeon va ueeac app y olocal domain, rocktype, or borehole

    21

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    22/79

    The equation e (6LS x 10-8

    )1/3

    looks like this for typical S-values of 0.5 to 3.0m

    Obviousl it is difficult to in ect cement articles into e. . < 0.1 Lu eon rock masses

    22

    unless E ( the physical joint aperture ) >> e ( the hydraulic aperture )

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    23/79

    SOME OPTIONS FOR INJECTING TIGHT JOINTS

    It usually helps to start injection with a high water/cement ratio (i.e. > 1.0)

    It may help to use ultrafine or micro cements (with micro silica andplasticisers) if the joints are very tight

    It usually helps to use much higher grouting pressure (P ) than water pressure(PW)

    =. . G W

    In Norway we use final grouting pressures in the range 5 to 10 MPa(50 to 100 bars), when pre-injecting ahead of tunnels, successivelyreducing the w/c ratio. The grouts are stable (little shrinkage or water

    separation).

    BUT FIRST WE MUST INVESTIGATE IF WE NEED HIGH PRESSUREGROUTING what h sical a ertures do we have??

    23

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    24/79

    Here we have Lu eon results from 4 de th zones at a ermeable dam site

    (e) and (S) have been interpreted as previously explained

    (e) is converted to (E) using JRC (the joint roughness coefficient)

    24 Note that the Grout-Take estimate (from this 1978 example) assumes the

    same grout pressure as the Lugeon test.. i.e. PW= 1 MPa

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    25/79

    HOW TO ESTIMATE . JRC THE JOINT ROUGHNESS COEFFICIENT

    Can be done on core from ahead of the face, or in the tunnel close to the face

    25

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    26/79

    26

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    27/79

    JRC value ranges derived from tilt tests and direct shear tests

    0

    27

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    28/79

    . ,

    2850, 100 and 400m limits are simpler to remember

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    29/79

    IF THE AVERAGE APERTURES (E) ARE NOT LARGE ENOUGH ? then

    (very exaggerated) the pressure must be increased!

    Local aperture increase (0.1 to 0.3mm ?) with higher pressure

    29

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    30/79

    GROUTING BETWEENTHE JOINT SETS IS

    ACHIEVED WITH HIGHER PRESSURES

    30

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    31/79

    Even this is possible (all 3 cements can be injected) due to E>e, and

    maybe due to use of high injection pressure causing deformation

    If the joints were smooth this would be impossible without higher

    31

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    32/79

    32

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    33/79

    , or per aps ..BUT THE ROCK MASS IS STILL WET!

    33

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    34/79

    THE MECHANISM OF JOINT OPENING WITH REDUCED EFFECTIVE. . . ..

    SEE BB-MODELLING EXAMPLES

    a y rau c aper ure c anges

    34

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    35/79

    b) Physical aperture changes

    35

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    36/79

    EXAMPLE OF INPUT DATA, AND INITIAL CALCULATIONS WITH BB-EXCEL

    The initial unstressed physical aperture is estimated from an empirical equation :E0 = JRC0/5(0.2c/JCS0 0.1) mm

    36

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    37/79

    BUT. a false idea of permeability will be given with too high water pressure testing

    37

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    38/79

    Note that E can be almost doubled from 30 to 60m now OK for ULTRAFINE?

    38

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    39/79

    The difference between E and e in a UDEC-BB model (Makurat, 1988: Oslo Tunnel)

    39

    SOME RECENT ESTIMATES OF (e) from LUGEON TESTS

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    40/79

    SOME RECENT ESTIMATES OF (e) from LUGEON TESTSand (E) from Jr to JRC conversion.

    Large (E) due to high Lugeon values...and roughness.

    (ORANGE and RED and PINK are easiest to grout)

    YELLOW (OK)GREENBLUEneeds higher pressure or finer micro/ultrafine

    40

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    41/79

    BUT ROCK MASSES ARE VERY VARIABLE.WHAT ABOUT SHEARING ???

    41

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    42/79

    IF THE STRESSES ARE ANISOTROPIC

    42

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    43/79

    LOCAL SHEARING CAUSES LOCAL DILATION AND EASIER GROUT

    PENETRATION IN JOINTS THAT MAY HAVE BEEN TOO TIGHT

    43

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    44/79

    A TYPICAL SITUATION WHERE JOINT SHEAR AND DILATION MIGHTOCCUR DURING HIGH PRESSURE PRE-GROUTING

    Future tunnel wall on ri ht rinci al stress vertical.but no h draulic fracturin

    44

    HIGH PRESSURE PRE-INJECTION COULD CAUSE LOCAL HYDRAULIC

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    45/79

    HIGH PRESSURE PRE INJECTION COULD CAUSE LOCAL HYDRAULICSPLITTING IN ROCKS WITH LOW TENSILE STRENGTH

    but the presence of joints in other directions (not parallel to principal stress) willoften prevent this

    45

    DIFFERENT JOINT DEFORMATION MECHANISMS CAN OBVIOUSLY

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    46/79

    DIFFERENT JOINT DEFORMATION MECHANISMS CAN OBVIOUSLYOPERATE (LOCALLY) DURING HIGH PRESSURE INJECTION..

    due to the reduced local effective stresses

    46

    BUT HIGH PRESSURE GROUTING IS UNLIKELY TO CAUSE UNWANTED

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    47/79

    DEFORMATION i.e. uncontrolled hydraulic opening.ue o ew on an u pressure ecay mec an sms

    47

    THE LOGARITHMIC PRESSURE DECAY IS A SAFETY MECHANISM for

    high pressure grouting.while flow is still occurring.. and is extraeffective with cohesive + frictional fluids like grout

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    48/79

    48

    Logarithmic pressure decay with radial, laminar or turbulent flow (e.g. Cruz, 1979)

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    49/79

    DEFORMATION THAT MAY OCCUR IF FLOW HAS CEASEDAND PRESSURE IS MAINTAINED

    49

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    50/79

    WHAT HAPPENS WITH TOO LOW PRESSURE, TOO TIGHT JOINTS, TOO

    LARGE CEMENT PARTICLES..AND UNSTABLE GROUTSTHAT BLEED WATER?

    50

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    51/79

    - -...... ,

    BUTTHE NEXT SCREENS SHOW WHAT OCCURS WHEN DOING

    SUCCESSFUL INJECTION when the grout penetrates as expected

    51

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    52/79

    NOTE DRY ROCK BEHIND JUMBO ALREADY PRE-

    GROUTED)SEE SEVERAL EXAMPLES THAT FOLLOW

    52

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    53/79

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    54/79

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    55/79

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    56/79

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    57/79

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    58/79

    58

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    59/79

    59

    STABLE NON-BLEEDING GROUTS ARE ALSO ESSENTIAL FOR

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    60/79

    STABLE NON BLEEDING GROUTS ARE ALSO ESSENTIAL FORPREVENTING WATER-SICK ROCK

    60

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    61/79

    WHAT ABOUT PROPERTYIMPROVEMENT?

    CAUSED BY SUCCESSFUL GROUTING

    61

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    62/79

    mu t -probe-

    measure

    ment ofgrouting(Quadros

    an

    Correa,

    1995)

    62

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    63/79

    reduced in magnitude due to grouting Sin le hole inter retation shows from 1 to 4 orders of ma nitude

    improvement e.g. 10-7 to10-8 m/s up to 10-4 to 10-8 m/s

    With 3D interpretation across 4 to 8 m of rock mass (this was thehole spacing), the improvement is 1/17 for Kmax, and 1/11 for Kmin

    This emphasises the need for closer spacing (e.g. split-spacing) of

    The results suggest that individual joint sets are successively

    Norwegian experiences suggest pressure plateau . as each joint

    set is in ected? Can we take this further and think of rock mass property

    improvement ???

    63

    Suppose the following small improvements occur to individual Q-parameters

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    64/79

    64

    These could give the following improvements in rock mass properties ?

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    65/79

    65

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    66/79

    SOME OF THE

    EQUATIONS

    Q-value androck massproperty estimates

    a seen n ear erlectures)

    66

    .

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    67/79

    .

    THE EFFECTIVE Q-VALUE CAN BE IMPROVED

    67

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    68/79

    REDUCED TUNNEL DEFORMATION. WOULD ALSO BE SEEN IN MODELS

    68

    IF Q-VALUES CAN BE IMPROVED SO TOO WILL SEISMIC VELOCITY

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    69/79

    (see steep-diagonal behaviour due to consolidation effect)

    69

    RELATIVE TIME FOR TUNNEL EXCAVATION AND SUPPORT

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    70/79

    RELATIVE TIMEFOR TUNNEL EXCAVATION AND SUPPORT

    potential benefits of pre-grouting, especially if Q 0.1

    70

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    71/79

    potential benefits of pre-grouting, especially if Q 0.1

    71

    CONSEQUENCES OF-

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    72/79

    ON COST.....IF EFFECTIVE

    CAN BE INCREASED

    TRY TO ELIMINATEMOST OF THE LOWQ-VALUE ROCKi.e. Q< 1

    THEN GET LOWERCOST BECAUSE OFLESS PROBLEMS

    WITH CONSTRUCTION

    72

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    73/79

    Take care if cover (depth to surface ) is limited !

    73

    kg cement / bored meter?

    ra n en = g m we s : oo ow pressure: - ars ns ruc onf E i (1 d l ith t i j ti t t ti )

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    74/79

    from Engineer. (1 year delay with post injection, contractor won compensation) Arlandabanen = 16.9 kg/m (rail) Tsen = 24 kg/m Svartdal = 80 kg/m (very bad rock and low cover, mainly for stability) Lundby = 5.9 kg/m (Swedish: too low pressure extra injection rounds

    needed)

    Storhau = 8.0 k /m Bragernes = 68 kg/m (deformable volcanic rock) Baneheia = 9.0 kg/m Jong-Asker JA1: = 13 kg/m, JA2: = 19 kg/m (4 to 8 MPa)

    ese are mos y orweg an unne s, w ere sys ema c pre- n ec on was usefor many kilometers. Pressure range 2 to 9 MPa, cover 2 to 150 m)---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Line 4, screen 4

    11 kg/m (mean 134 kg/hole,12m long holes using 13 holes in arch only)(pressure 10- 60 bars, mean 32 bars

    AREA OF TUNNEL per 12 m grout fan 12.D x 12.10 x 180 m2

    1,735 kg/180m2 = 9.6 kg/m2 (THIS IS LOW, BUT SEE FIGURE FOR GNEISS

    74

    (assumed 6 m cylinder of grout gives 1.6 l/m ...typical for tight gneiss, granite)-----------------------------------------------------------------------------------------------------------------

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    75/79

    How many litres of grout per m3 of rock mass?

    with 6m cylinder assumption usually 1 to 6 liters/m .

    75

    Some pre-grouting volumetric results

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    76/79

    Some pre-grouting volumetricresults

    Pre- routin data derived from ndal et al. 2001.

    Rock type kg/m2 tunnel surface kg/m3 litres/m3

    gneiss 11.0 to 16.5 1.8-2,8 1.7-2.6

    granite 12.0 to 52 2.0-8.7 1.8-8.3

    phyllite 26 4.3 4.1

    . - . . - .

    syenite (dike) 30 to (186) 5.0-(31) 4.7-(28.7)

    fracture zone 19 to 50 3.1-8.3 2.9-7.7

    ASSUME 6M THICK CYLINDER (ON AVERAGE) IS GROUTED

    76

    AN UPDATE FROM 2006 NUMEROUS RECENTNORWEGIAN TUNNELLING PROJECTS

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    77/79

    NORWEGIAN TUNNELLING PROJECTS

    77

    Estimating Liters-of-grout / m3 of rock mass (as previous)

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton

    78/79

    78

    SUGGESTION FOR ALTERNATING SHORT AND LONG HOLES(to give better over-lap, and act as probe-holes without extra drilling)

  • 7/25/2019 HK Poly '10 NB4, Pre-grouting - Barton