1887 Seattle, Lake Shore & Eastern Railway built railroad in Interbay to move timber and coal and connect with Canada. 1892 Great Northern Railway constructed railroad to Seattle, through Interbay, with a depot and piers at Smith Cove to handle cargo from Asia. 1924 The W Wheeler St trestle, one of three major routes to Magnolia, burned down after a train started a fire on the tracks below. 1930 The W Garfield St Bridge was constructed between 15th Ave W and Dartmouth Ave W. A Local Improvement District (LID) was formed assessing Magnolians for a little over 50% of the costs. The remaining 50% of the costs were shared between the railroad companies and the City. 1957 A new structure over 15th Ave W, on the east end of the bridge, was constructed. 1960 Bridge was renamed as Magnolia Bridge. 1961 West half of the bridge was strengthened by installing steel cross-bracing on piers and trusses under deck. 1974 East half of bridge was strengthened similar to west half. 1991 New ramps were added to serve Elliot Bay Marina. 1997 Landslide damaged piers on west end of bridge requiring closure until repaired. Landslide damaged piers on west end of bridge, requiring the bridge to be closed for repairs. 2001 The Nisqually earthquake damaged nearly half of the original concrete lateral bracing, requiring closure while it was replaced with tubular steel bracing. 2001 W Galer St Flyover was constructed. 2002 - 2008 SDOT received a federal grant to identify a replacement structure. Through this study, the preferred alternative was an in-kind replacement structure just south of the current structure. Funding to complete the design and construction of the in-kind replacement structure has not been secured. 2015 The Levy to Move Seattle provided funding to develop additional alternatives and to update cost estimates and traffic analyses of the in-kind replacement structure identified in the 2002-2008 study. 2017 Magnolia Bridge Planning Study began analysis to create an emergency access plan, update cost and traffic data for the in-kind replacement and develop additional alternatives to the in-kind replacement structure. HISTORY OF MAGNOLIA BRIDGE MAGNOLIA BRIDGE PLANNING STUDY WHAT WE’RE HEARING Photos courtesy of Seattle Municipal archives. Alternative I - Armory Bridge, etc. Alternative II - Dravus, etc. Alternative III - Dravus & Garfield Bridge 2 4 T H A V E W T HO RNDY K E A V EW 1 1 T H A V E W W NEWTON ST 1 3 T H A V E W 1 2 L O W E R A V E W W HOWE ST W LY NN PL 2 3 R D A V E W 2 1 S T A V E W W SMITH ST 1 7 T H A V E W W DRAVUS ST 2 5 T H A V E W 1 6 T H A V E W W RAYE ST 1 4 T H A V E W W A RMO UR ST EL L IO TT AVE W W W H E E L E R ST W BLAINE ST W GA RF IE L D S T MAG NO LIA BR W PLYMOUTH ST W BARRETT ALASKAN WAY W W BOSTON ST W LY NN ST GI LM AN D R W WM ARINA P L W W HALLADAY ST CROCKETT ST W A R MO R Y W A Y 1 2 T H A V E W 2 2 N D A V E W 1 5 T H A V E W 2 0 T H A V E W E L L I O T T B A Y T R L W GALER ST FLY O V E R P R O S C H A V E W 1 West Uplands Perimeter Road Provides primary access to the Smith Cove Waterfront & Marina. Alaskan Way W Extension Provides connection between W Garfield St Flyover (7) and existing W Galer St Flyover. W Garfield St Flyover New bridge is important for future traffic on 15th Ave W. Provides Southbound traffic on 15th Ave W a right turn option to access Elliott Bay over the BNSF tracks. 20th Ave W Improvements Provides a connection between Smith Cove access (1) and Magnolia. Armory Way Bridge New bridge provides southern access to Magnolia from 15th Ave W along Armory Way over the BNSF tracks. Thorndyke Ave W Improvements Provides connection between the new Armory Way Bridge (5B) and Smith Cove access (1 & 2A) 2A 6D 5B 7 8 N 2 4 T H A V E W T HO RNDY K E A V EW 1 1 T H A V E W W W HALLADAY ST NEWTON ST 1 3 T H A V E W 1 2 L O W E R A V E W W HOWE ST W LY NN PL 2 3 R D A V E W 2 1 S T A V E W W SMITH ST 1 7 T H A V E W W DRAVUS ST 2 5 T H A V E W 1 6 T H A V E W W RAYE ST 1 4 T H A V E W W A RMO UR ST EL L IO TT AVE W W W H E E L E R ST W BLAINE ST W GA RF IE L D S T MAG NO LIA BR W PLYMOUTH ST W BARRETT ST ALASKAN WAY W W BOSTON ST W LY NN ST GI LM AN D R W WM ARINA P L W CROCKETT ST W A R MO R Y W A Y 1 2 T H A V E W 2 2 N D A V E W 1 5 T H A V E W 2 0 T H A V E W E L L I O T T B A Y T R L W GALER ST FL Y O V E R P R O S C 1 West Uplands Perimeter Road Provides primary access to the Smith Cove Waterfront & Marina. Alaskan Way W Extension Provides connection between W Garfield St Flyover (7) and existing W Galer St Flyover. W Garfield St Flyover New bridge is important for future traffic on 15th Ave W. Provides Southbound traffic on 15th Ave W a right turn option to access Elliott Bay over the BNSF tracks. 20th Ave W Improvements Provides a connection between Smith Cove access (1) and Magnolia. W Dravus Street Improvements Provide additional capacity at existing crossing into Magnolia through intersection upgrades and additional travel lanes from 15th Ave W to 20th Ave W. 2A 7 8 N 3 2 4 T H A V E W T HO RNDY K E A V EW 1 1 T H A V E W W NEWTON ST 1 3 T H A V E W 1 2 L O W E R A V E W W HOWE ST W LY NN PL 2 3 R D A V E W 2 1 S T A V E W W SMITH ST 1 7 T H A V E W W DRAVUS ST 2 5 T H A V E W 1 6 T H A V E W W RAYE ST 1 4 T H A V E W W A RMO UR ST EL L IO TT AVE W W W H E E L E R ST W BLAINE ST W GA RF IE L D S T MAG NO LIA BR W PLYMOUTH ST W BARRETT ST ALASKAN WAY W W BOSTON ST W LY NN ST GI LM AN D R W WM ARINA P L W W HALLADAY ST CROCKETT ST W A R MO R Y W A Y 1 2 T H A V E W 2 2 N D A V E W 1 5 T H A V E W 2 0 T H A V E W E L L I O T T B A Y T R L W GALER ST FLY O V E R P R O S C Garfield St Bridge to 23rd Ave W New bridge provides access to 23rd Ave W & Smith Cove Waterfront over the BNSF tracks and Port’s Terminal 91. W Dravus Street Improvements Provide additional capacity at existing crossing into Magnolia through intersection upgrades and additional travel lanes from 15th Ave W to 20th Ave W. 10 N 3 2006 Recommended In-kind Replacement 2018 Total Cost: $340M - $420M 2018 Total Cost: $200M - $350M 2018 Total Cost: $190M - $310M 2018 Total Cost: $170M - $280M 2 4 T H A V E W T HO RNDY K E A V E W 1 1 T H A V E W W NEWTON ST 1 3 T H A V E W 1 2 L O W E R A V E W W HOWE ST W LY NN PL 2 3 R D A V E W 2 1 S T A V E W W SMITH ST 1 7 T H A V E W W DRAVUS ST 2 5 T H A V E W 1 6 T H A V E W W RAYE ST 1 4 T H A V E W W A RMO UR ST EL L IO TT AVE W W W H E E L E R ST W BLAINE ST W GA RF I E L D S T MAG NO LIA BR W PLYMOUTH ST W BARRETT ALASKAN WAY W W BOSTON ST W LY NN ST GI LM AN D R W WM ARINA P L W W HALLADAY ST CROCKETT ST W A R MO R Y W A Y 1 2 T H A V E W 2 2 N D A V E W 1 5 T H A V E W 2 0 T H A V E W E L L I O T T B A Y T R L W GALER ST FLY O V E R P R O S C H A V E W In-kind Magnolia Bridge Replacement Provides same access as today just south of the current structure. N JUNE 2018 Written comments 94 Drop-in sessions 4 200 Online open house comments 277 Drop-in session participants Online open house 1 186 Online alternatives survey participants • The majority of Magnolia residents prefer an in-kind replacement • The majority of Magnolia residents value a third access point - For this reason, the alternative that includes a new Armory Way Bridge ranked highest in this current study PROJECT INFORMATION Visit: www.seattle.gov/transportation/magnoliabridgeplanning Email: [email protected] PROJECT TIMELINE We’re updating the cost estimate and traffic modeling for an in-kind replacement and will compare these metrics to the analysis of the identified alternatives - shown below - in the final Magnolia Bridge Planning Study. We’ll continue to share information and work with Magnolia residents and businesses, King County Metro, our regional partners, Sound Transit, and the Port of Seattle, as we move through the process. Visit our web page (URL below) to sign up for email alerts. PLANNING STUDY PROCESS 2017 2018 2019 Q1 Q2 Q3 Q4 Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Q1 Q2 Q3 Q4 Stakeholder Workshops with Port of Seattle, Magnolia Chamber, Magnolia Community Council, King County Metro, Seattle Parks and Recreation, Seattle Department of Transportation, Sound Transit, Queen Anne Community Council, Magnolia Interbay Queen Anne Disaster Preparedness, Seneca/Expedia, BNSF Community Councils and Other Community Group Briefings to inform the public of the study purpose and present initial components for comment and questions Present to SDOT Directors, Mayor, and Council Members to review initial and technical screening and present alternatives Drop-in Sessions and Online Open House & Survey to describe Magnolia Bridge history, review evaluation process, present alternatives, and collect community input Finalize Alternatives Analysis and share Magnolia Bridge Planning Study results and comparison to SDOT Directors, Mayor, and other elected officials Ongoing Outreach Activities to conduct an intercept survey in Magnolia Village to better understand behaviors among people visiting and working there; share results of public inupt and technical analysis; mobile display to share information to-date with community Emergency Closure Plan Present analysis and information Technical screening of components to identify viable alternatives Perform alternatives analysis Listening to community & agencies

HISTORY OF MAGNOLIA BRIDGE MAGNOLIA BRIDGE PLANNING … · 2018. 11. 1. · Interbay, with a depot and piers at Smith Cove to handle cargo from Asia. 1924 The W Wheeler St trestle,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HISTORY OF MAGNOLIA BRIDGE MAGNOLIA BRIDGE PLANNING … · 2018. 11. 1. · Interbay, with a depot and piers at Smith Cove to handle cargo from Asia. 1924 The W Wheeler St trestle,

1887Seattle, Lake Shore & Eastern Railway built railroad in Interbay to move timber and coal and connect with Canada.

1892Great Northern Railway constructed railroad to Seattle, through Interbay, with a depot and piers at Smith Cove to handle cargo from Asia.

1924The W Wheeler St trestle, one of three major routes to Magnolia, burned down after a train started a fire on the tracks below.

1930The W Garfield St Bridge was constructed between 15th Ave W and Dartmouth Ave W. A Local Improvement District (LID) was formed assessing Magnolians for a little over 50% of the costs. The remaining 50% of the costs were shared between the railroad companies and the City.

1957A new structure over 15th Ave W, on the east end of the bridge, was constructed.

1960Bridge was renamed as Magnolia Bridge.

1961West half of the bridge was strengthened by installing steel cross-bracing on piers and trusses under deck.

1974East half of bridge was strengthened similar to west half.

1991New ramps were added to serve Elliot Bay Marina.

1997Landslide damaged piers on west end of bridge requiring closure until repaired. Landslide damaged piers on west end of bridge, requiring the bridge to be closed for repairs.

2001The Nisqually earthquake damaged nearly half of the original concrete lateral bracing, requiring closure while it was replaced with tubular steel bracing.

2001W Galer St Flyover was constructed.

2002 - 2008SDOT received a federal grant to identify a replacement structure. Through this study, the preferred alternative was an in-kind replacement structure just south of the current structure. Funding to complete the design and construction of the in-kind replacement structure has not been secured.

2015The Levy to Move Seattle provided funding to develop additional alternatives and to update cost estimates and traffic analyses of the in-kind replacement structure identified in the 2002-2008 study.

2017 Magnolia Bridge Planning Study began analysis to create an emergency access plan, update cost and traffic data for the in-kind replacement and develop additional alternatives to the in-kind replacement structure.

HISTORY OF MAGNOLIA BRIDGE MAGNOLIA BRIDGE PLANNING STUDY WHAT WE’RE HEARING

Photos courtesy of Seattle Municipal archives.

Alternative I - Armory Bridge, etc.

Alternative II - Dravus, etc. Alternative III - Dravus & Garfield Bridge

24TH

AVE

WTH

ORN

DYKE

AVE

W

1 1TH

AVE

W

W NEWTO N ST

13TH

A VE

W

12L O

WER

AVE

W

W HO WE ST

W LY NN PL

23R

DAV

EW

21S

TAV

EW

W SMITH ST

17TH

AVE

W

W DRAVUS ST

25T H

A VE

W

16TH

A VE

W

W RAY E ST

14TH

AVE

W

W ARMO UR ST

ELLIO TTAVE

W

W WHEELER ST

W BLAINE ST

W G ARFIELD ST

MAG NO LIA BR

W PLY MO UTH ST

W BARRETT

ALASKAN

WAY

W

W BO STO N ST

W LY NN ST

GILM

ANDR

W

W MARINA PL

W

W HALLADAY ST

CRO CKETT ST

WARM

ORYW

AY

12TH

AVE

W

22N

DAV

EW

15TH

A VE

W

20TH

AVE

W

ELL

IOT T

BAY

TRL

W

G ALER ST FLYOV ER

PR

OSC

HAV E

W

1

West Uplands Perimeter RoadProvides primary access to the Smith Cove Waterfront & Marina.

Alaskan Way W ExtensionProvides connection between W Garfield St Flyover (7) and existing W Galer St Flyover.

W Garfield St FlyoverNew bridge is important for future traffic on 15th Ave W. Provides Southbound traffic on 15th Ave W a right turn option to access Elliott Bay over the BNSF tracks.

20th Ave W ImprovementsProvides a connection between Smith Cove access (1) and Magnolia.

Armory Way BridgeNew bridge provides southern access to Magnolia from 15th Ave W along Armory Way over the BNSF tracks.

Thorndyke Ave W ImprovementsProvides connection between the new Armory Way Bridge (5B) and Smith Cove access (1 & 2A)

2A

6D

5B

78

N

24TH

AVE

WTH

ORN

DYKE

AVE

W

1 1TH

AVE

W

W

W HALLADAY ST

NEWTO N ST

13TH

A VE

W

12L O

WER

AVE

W

W HO WE ST

W LY NN PL

23R

DAV

EW

21S

TAV

EW

W SMITH ST

17TH

AVE

W

W DRAVUS

ST

25T H

A VE

W

16TH

A VE

W

W RAY E ST

14TH

AVE

W

W ARMO UR ST

ELLIO TTAVE

W

W WHEELER ST

W BLAINE ST

W G ARFIELD ST

MAG NO LIA BR

W PLY MO UTH ST

W BARRETT ST

ALASKAN

WAY

W

W BO STO N ST

W LY NN ST

GILM

ANDR

W

W MARINA PL

W CRO CKETT ST

WARM

ORYW

AY

12TH

AVE

W

22N

DAV

EW

15TH

A VE

W

20TH

AVE

W

ELL

IOT T

BAY

TRL

W

G ALER ST FLYOV ER

PR

OSC

1

West Uplands Perimeter RoadProvides primary access to the Smith Cove Waterfront & Marina.

Alaskan Way W ExtensionProvides connection between W Garfield St Flyover (7) and existing W Galer St Flyover.

W Garfield St FlyoverNew bridge is important for future traffic on 15th Ave W. Provides Southbound traffic on 15th Ave W a right turn option to access Elliott Bay over the BNSF tracks.

20th Ave W ImprovementsProvides a connection between Smith Cove access (1) and Magnolia.

W Dravus Street ImprovementsProvide additional capacity at existing crossing into Magnolia through intersection upgrades and additional travel lanes from 15th Ave W to 20th Ave W.

2A

78

N3

24TH

AVE

WTH

ORN

DYKE

AVE

W

1 1TH

AVE

W

W NEWTO N ST

13TH

A VE

W

12L O

WER

AVE

W

W HO WE ST

W LY NN PL

23R

DAV

EW

21S

TAV

EW

W SMITH ST

17TH

AVE

W

W DRAVUS

ST

25T H

A VE

W

16TH

A VE

W

W RAY E ST

14TH

AVE

W

W ARMO UR ST

ELLIO TTAVE

W

W WHEELER ST

W BLAINE ST

W G ARFIELD ST

MAG NO LIA BR

W PLY MO UTH ST

W BARRETT ST

ALASKAN

WAY

W

W BO STO N ST

W LY NN ST

GILM

ANDR

W

W MARINA PL

W

W HALLADAY ST

CRO CKETT ST

WARM

ORYW

AY

12TH

AVE

W

22N

DAV

EW

15TH

A VE

W

20TH

AVE

W

ELL

IOT T

BAY

TRL

W

G ALER ST FLYOV ER

PR

OSC

Garfield St Bridge to 23rd Ave WNew bridge provides access to 23rd Ave W & Smith Cove Waterfront over the BNSF tracks and Port’s Terminal 91.

W Dravus Street ImprovementsProvide additional capacity at existing crossing into Magnolia through intersection upgrades and additional travel lanes from 15th Ave W to 20th Ave W.

10

N3

2006 Recommended In-kind Replacement

2018 Total Cost: $340M - $420M 2018 Total Cost: $200M - $350M

2018 Total Cost: $190M - $310M 2018 Total Cost: $170M - $280M

24TH

AVE

WTH

ORN

DYKE

AVE

W

1 1TH

AVE

W

W NEWTO N ST

13TH

A VE

W

12L O

WER

AVE

W

W HO WE ST

W LY NN PL

23R

DAV

EW

21S

TAV

EW

W SMITH ST

17TH

AVE

W

W DRAVUS ST

25T H

A VE

W

16TH

A VE

W

W RAY E ST

14TH

AVE

W

W ARMO UR ST

ELLIO TTAVE

W

W WHEELER ST

W BLAINE ST

W G ARFIELD ST

MAG NO LIA

BR

W PLY MO UTH ST

W BARRETT

ALASKAN

WAY

W

W BO STO N ST

W LY NN ST

GILM

ANDR

W

W MARINA PL

W

W HALLADAY ST

CRO CKETT ST

WARM

ORYW

AY

12TH

AVE

W

22N

DAV

EW

15TH

A VE

W

20TH

AVE

W

ELL

IOT T

BAY

TRL

W

G ALER ST FLYOV ER

PR

OSC

HAV E

W

In-kind Magnolia Bridge Replacement Provides same access as today just south of the current structure.

N

JUNE 2018

Written comments

94Drop-in

sessions

4

200Online open

house comments

277Drop-in session

participants

Online open house

1 186Online alternatives survey participants

• The majority of Magnolia residents prefer an in-kind replacement

• The majority of Magnolia residents value a third access point- For this reason, the alternative that includes a new Armory Way Bridge ranked

highest in this current study

PROJECT INFORMATIONVisit: www.seattle.gov/transportation/magnoliabridgeplanningEmail: [email protected]

PROJECT TIMELINE

We’re updating the cost estimate and traffic modeling for an in-kind replacement and will compare these metrics to the analysis of the identified alternatives - shown below - in the final Magnolia Bridge Planning Study.

We’ll continue to share information and work with Magnolia residents and businesses, King County Metro, our regional partners, Sound Transit, and the Port of Seattle, as we move through the process. Visit our web page (URL below) to sign up for email alerts.

PLANNING STUDY PROCESS 2017 2018 2019

Q1 Q2 Q3 Q4 Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Q1 Q2 Q3 Q4

Stakeholder Workshops with Port of Seattle, Magnolia Chamber, Magnolia Community Council, King County Metro, Seattle Parks and Recreation, Seattle Department of Transportation, Sound Transit, Queen Anne Community Council, Magnolia Interbay Queen Anne Disaster Preparedness, Seneca/Expedia, BNSF

Community Councils and Other Community Group Briefings to inform the public of the study purpose and present initial components for comment and questions

Present to SDOT Directors, Mayor, and Council Members to review initial and technical screening and present alternatives

Drop-in Sessions and Online Open House & Survey to describe Magnolia Bridge history, review evaluation process, present alternatives, and collect community input

Finalize Alternatives Analysis and share Magnolia Bridge Planning Study results and comparison to SDOT Directors, Mayor, and other elected officials

Ongoing Outreach Activities to conduct an intercept survey in Magnolia Village to better understand behaviors among people visiting and working there; share results of public inupt and technical analysis; mobile display to share information to-date with community

Emergency Closure Plan Present analysis and information

Technical screening of components to identify viable alternatives

Perform alternatives analysis

Listening to community & agencies