Agenda
�Introductions
�Overview of Project
�Demographics and Market Analysis
�Engineering Assessment
�Draft Concepts Presentation
�Concepts Discussion
Population Growth
10,138
18,644
19,775 21,935
24,218 26,799
29,522
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
2000 2010 2012 2015 2020 2025 2030
Population
2000
2010
2012
2015
2020
2025
2030
Housing Values
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
Home Value
< $100,000
$100,000 - $149,99
$150,000 - $199,999
$200,000 - $249,999
$250,000 - $299,999
$300,000 - $399,999
$400,000 - $499,999
> $500,000
Household Income
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
Household Income
< $15,000
$15,000 - $24,999
$25,000 - $34,999
$35,000 - $49,999
$50,000 - $74,999
$75,000 - $99,999
$100,000 - $149,999
$150,000 - $199,000
> $200,000
Median Household Income: $74,040
Retail Goods & Service Expenditures
Average Total
Apparel and Services $1,797.63 $12,844,038
Computer $323.01 $2,307,901
Entertainment and Recreation $4,017.82 $28,707,350
Movies / Theater / Opera / Ballet $197.94 $1,414,263
Food $9,603.19 $68,614,814
Food at Home $5,788.64 $41,359,842
Food Away from Home $3,814.55 $27,254,973
Alcoholic Beverages $634.03 $4,530,110
Food Service Supply & Demand
DemandSupply Gap
Food Services & Drinking
Places (Total)$24,091,060 $14,566,520 $9,524,540
Full Service Restaurants $11,217,153 $4,260,119 $6,957,034
Limited Service Restaurants $11,038,922 $8,194,319 $2,844,603
Special Food Services $1,112,212 $2,062,094 $949,882
Drinking Places – Alcohol $722,773 $49,988 $672,785
Tapestry Segmentation
38.90%
15.70%
12.90%
12.10%
9.10%
11.30%
Tapestry
Up and ComingFamilies
In Style
Main Street, USA
Milk and Cookies
Green Acres
Other
Conclusion
• Rapid Population Growth
• Diverse Mix of Businesses
• Proximity to Other Rapidly Growing Communities
• High Income
• High Quality of Life
• Tons of Potential for Any Use at the Mill
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G Preliminary Concept Presentation 07.29.2014
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Table of Contents
I. Project Goals
II. Program Type Analysis - Pros and Cons
III. Site Plan
IV. Scheme A
V. Scheme B
VI. Scheme C
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Restore the Historic Windsor Mill• thoughtfully repair, strengthen and amplify the Mill’s unique architectural features while preserving the character and integrity of the structure
• construct an innovative plan that will celebrate the Mill’s heritage and honor the spirit of its original use and builder
• design a vision for future use of the Mill as a beautiful, safe, and re-energized community space
Revitalize the Windsor Community• develop the property with respect to the citizen-driven values, goals and vision for the greater Windsor community
• create an iconic place that serves as a historical regional and civic landmark as well as a viable commercial hub
• envision the Mill as an anchor for the future revitalization,densification, and connectivity of Windsor’s downtown core
• boost Windsor’s pride through the re-creation of a special place which is vital to the soul of the Windsor community
Historic Windsor Mill Project Goals
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Commercial Pros ConsRestaurant -amenity to downtown community- provides access to food and gathering
-ample space for indoor and outdoor dining-built-in ambiance with historic building-family friendly
-extensive kitchen infrastructure requirements-large space could remain vacant for extended period of time-loading dock and back of house infrastructure may be required
Cafe -ammenity to downtown community- potential to become an informal gathering place-ample space for indoor and outdoor dining-built-in ambience with historic building-fewer kitchen and interior fit-out requirements than traditional restaurant-family friendly
-some kitchen infrastructure needed-lower lease rate may be necessary-potential for limited hours
Retail -amenity to downtown community-provides tourist attraction and access to goods-family friendly
-chain stores may require special and/or disruptive signage-building may not provide sufficient storefront space -limited operation hours, specialized security may be required
Small Grocery -amenity to downtown community- provides access to food staples at central core-family friendly-long operation hours
-parking may not be adequate for large store-leased space may not be adequate for store-loading dock and back of house infrastructure may be required
Professional Office -amenity to downtown business community- provides stable job opportunities-more stable tenant not as reliant on cultural forces and walk up clientele
-limited operation hours, specialized security may be required-may require additional parking, data and electrical requirements
Manufacturing -amenity to larger economic community- provides job opportunities at central core-in line with historic use of the building-variable operation hours
-less likely to involve public in use-small spaces and limited storage for large scale operation-may require additional parking, safety, security, plumbing and mechanical infrastructure
Artist Studios/ Private Gallery
-amenity to downtown community- provides community arts resource-family friendly-requires minimal interior fit-out-compliment to additional civic opportunities, variable operation hours
-additional mechanical and plumbing infrastructure may be required-subsidized rents may be required-interior daylighting may not be sufficient
Bar/Lounge -amenity to downtown community- provides night-time entertainment in central core-built in ambiance with historic building-requires minimal interior fit-out
-potential for being not family friendly-limited to evening hours unless food or entertainment is provided
Brewery -amenity to downtown community- provides economic, jobs and tourism opportunity-built in ambiance with historic building, in line with historic use-adaptable program for additional restaurant or cafe
-may require additional parking, electrical, mechanical and plumbing infrastructure-potential for not being family friendly
Billiards/Games Hall -amenity to downtown community-provides entertainment-built in ambiance with historic building, adaptable to basement level-variable operation hours
-potential for not being family friendly-potential limited hours unless food or daytime programming is offered
Private Event Space -amenity to downtown community- provides gathering space-built in ambiance with historic building, outdoor courtyards-variable hours and event types-potential to draw persons from outside of the community
-may sit vacant without enough programming-lease structure might be unclear and inconsistent-may not be enough parking for very large events
Program Type Analysis
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Residential Pros ConsApartments -amenity to downtown community- provides housing that can be more affordable in city core
-residents provide watch over community of the building-small unit sizes may lend themselves to a leasing situation-ease of overall building management within leasing structure
-additional security will need to be provided for residents-small unit sizes may be hard to rent at affordable rate-conflicts may arise between commercial and residential functions of building-requires fit-out prior to rental-will need to provide dedicated parking
Condos -amenity to downtown community- provides housing that can be more affordable in city core-residents provide watch over community of the building-ownership provides long term stability of building-fit-out can be the responsibility of the buyer
-additional security will need to be provided for residents-small unit sizes may be hard to sell at a profitable rate without extensive fit out.-homeowners fees will need to be carefully negotiated with commercial aspects of building-will need to provide dedicated parking
Live/Work Spaces -amenity to downtown community-provides unique housing for artists and artisans in commercial building at the city core-minimal tenant fit-out required-symbiotic opportunities with gallery and commercial spaces on lower levels
-fewer units will likely be available for lease-additional mechanical, electrical, IT and plumbing requirements may need to be provided for each unit-will need to provide dedicated parking
Program Type Analysis
Civic Pros ConsHistoric Museum -amenity to downtown community- provides a repository and display location for Windsor’s history
-community resource embedded in an active commercial space -opportunity for hands on learning within the historic building and downtown location-opportunity to become a hub for tourists and visitors-family friendly
-funding and long term maintenance may lead to limited programming and hours of operation-lease rate will likely need to be subsidized-will require interior fit-out
Public Art Gallery -amenity to downtown community- provides a display location for local artists and artisans-community resource embedded in an active commercial space -opportunity for hands on learning within the historic building and downtown location-opportunity to become a hub for tourists and visitors-family friendly
-funding and long term maintenance may lead to limited programming and hours of operation-lease rate will likely need to be subsidized-will require interior fit-out
Public Events Space -amenity to downtown community-provides an informal gathering space for the public-opportunity for concerts, outdoor movies, festivals and other family friendly events-minimal fit out required -provides public relaxing space and restroom amenities within active commercial space
-will require initial cost to develop space-will require minimal, but committed ongoing maintenance-may not be enough parking for very large events
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
AREAS
Brew Pub/Lounge1755sf
Bar632sf
Mech485sf
Additional Storage5253sf
SunkenCourt440sf
Exit
ExitStage
schemeAlevel0
Brew Pub Lounge 1755sfBar 632sfSunken Courtyard 440sf
Assignable: 2827sf
Mechanical 485sfAdditional Storage 5253sf
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Retail 1581sfMuseum 1555sfRestaurant 6605sfOutdoor Dining 3554sfBrewery 1260sf
Assignable: 14555sf
Retail/Shops1581sf Windsor Historic Museum
1555sf
Restaurant6605sf
Patio Seating3554sf
Brewery1260sf
Open Kitchen
Storage Office Walk-in
Service
Dining Room
Dining Room
Main EntryDeck
Outdoor DiningPavilion
M
W
schemeAlevel1
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Brewery Office 543sfMezzanine 342sfResidential 3333sf
Assignable: 4218sf
Residential 864sf
Residential 672sf
Residential 650sf
Residential 650sf
open to below
open to below
open to below
Mezzanine342sf
Office543sf
roof
roof
schemeAlevel2
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Residential 3333sf
Assignable: 3333sf(2-4 units)
Residential 864sf
Residential 672sf
Residential 650sf
Residential 650sf
open to below
roof
roof
roof
roof
schemeAlevel3
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Residential 3302sf
Assignable: 3302sf(2-4 units)
Residential 1257sf Residential
2045sf
open to below
roof
roof
roof
roof
schemeAlevel4
AREAS
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Scheme A level 0 level 1 level 2 level 3 level 4buildingtotal
Brew Pub / Lounge 1755 1755Bar 632 632Sunken Court 440 440Retail / Shops 1581 1581Windsor Historic Museum 1555 1555Restaurant 6605 6605Outdoor Dining 3554 3554Brewery 1260 1260Brewery Office 543 543Outdoor Dining Mezzanine 342 342Residential 3333 3333 3302 9968
Net Assignable (ASF) 2827 14555 4218 3333 3302 28235
Vertical Circulation 460 460 460 460 1840Horizontal Circulation 518 518 325 1361Mechanical 485 485Additional Mech / Storage 5253 5253
Unassigned 5738 460 978 978 785 8939
Level Totals (GSF) 8565 15015 5196 4311 4087 37174
Windsor Mill Feasibility StudyProgram Areas
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Bar/Lounge 3070sf
Assignable: 3070sf
Mechanical 485sfAdditional Storage 3652sf
ram
p do
wn
ram
p do
wn
Mech485sf
Additional Storage3652sf
Lounge
Lounge Seating3070sf
Lounge
schemeBlevel0
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Ice Cream Cafe 1581sfGalleries 1176sfRestaurant 6596sfEvent Space 1260sf
Assignable: 10612sf
Outdoor Event 1500sfOutdoor Dining 2102sf
silo removed and relocated
ram
p be
low
elevated walkway
above
ram
p be
low
Kitchen
M W
Office
Outdoor Dining2102sf
Restaurant Dining6595sf
Public Event Space1260sf
Covered Courtyard1500sf
Ice Cream/Cafe1581sf Galleries
1581sf
Main EntryTo Parking
schemeBlevel1
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Office/Lease 3525sf
Assignable: 3525sf
Office/Lease1480sf Office/Lease
2045sf
roof
roof
roof
canopy roof
elevated walkway
over road
schemeBlevel2
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Office/Lease 3525sf
Assignable: 3525sf
Office/Lease1400sf Office/Lease
2045sf
roof
roof
roof
canopy roof
covered walkway
below
schemeBlevel3
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Office/Lease 3213sf
Assignable: 3213sf
Office/Lease1168sf Office/Lease
2045sf
roof
roof
roof
schemeBlevel4
AREAS
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Scheme B level 0 level 1 level 2 level 3 level 4buildingtotal
Bar / Lounge 3070 3070Ice Cream / Café 1581 1581Galleries 1176 1176Restaurant 6595 6595Outdoor Dining 2102 2102Public Event Space 1260 1260Outdoor Event Space 1500 1500Office / Lease 3525 3525 3213 10263
Net Assignable (ASF) 3070 14214 3525 3525 3213 27547
Vertical Circulation 460 460 460 460 1840Horizontal Circulation 522 328 325 1175Mechanical 485 485Additional Mech / Storage 3652 3652
Unassigned 4137 460 982 788 785 7152
Level Totals (GSF) 7207 14674 4507 4313 3998 34699
Program AreasWindsor Mill Feasibility Study
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Lounge 1604sfBilliards Hall 1607sfSunken Plaza 455sf
Assignable: 3666sf
Mechanical 485sfAdditional Storage 3636sf
ramp down
Mech485sf
Additional Storage3636sf
Lounge 1604sf
Billiards Hall1607sf
SunkenPlaza455sf
ramp down
step
sea
ting
silo removed and relocated
schemeClevel0
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Cafe 1621sfGallery 1352sfRestaurant 5265sfOutdoor Dining 3621sfConcession 543sf
Assignable: 12402sf
Outdoor Event Space 1661sf
silo removed and relocated
ramp below
plaz
a be
low
Outdoor Dining3621sf
Restaurant Dining5265sf
Conc
essi
on54
3sf
Outdoor Event Space1661sf
Cafe1621sf Gallery
1352sf
Main EntryTo Parking
M
W
sidewalk to street over
ramp
lobby reception
schemeClevel1
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Live/Work Space 1558sfArtist Space 1352sf
Assignable: 2910sf
Live/Work1558sf Artist Space
1352sf
roof
roof
roof
canopy roof
schemeClevel2
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Live/Work Space 1558sfArtist Space 1352sf
Assignable: 2910sf
Live/Work1558sf
roof
roof
roof
canopy roof
Artist Space1352sf
schemeClevel3
AREAS
Concept Diagrams+
Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Live/Work Space 1904sfArtist Space 1352sf
Assignable: 3256sf
Artist Space1352sf
Live/Work1558sf
roof
roof
roof
canopy roof
schemeclevel4
+Historic Windsor Mill Feasibility Study
H O L T K A M PP L A N N I N G
Scheme C level 0 level 1 level 2 level 3 level 4buildingtotal
Lounge 1604 1604Billiards Hall 1607 1607Sunken Plaza 455 455Café 1621 1621Gallery 1352 1352Restaurant 5265 5265Outdoor Dining 3621 3621Concession 543 543Outdoor Event Space 1661 1661Live/Work 1558 1558 1902 5018Artist Space 1352 1352 1352 4056
Net Assignable (ASF) 3666 14063 2910 2910 3254 26803
Vertical Circulation 520 520 520 520 2080Horizontal Circulation 600 415 415 385 1815Mechanical 485 485Additional Mech / Storage 3636 3636
Unassigned 4121 1120 935 935 905 8016
Level Totals (GSF) 7787 15183 3845 3845 4159 34819
Windsor Mill Feasibility StudyProgram Areas