HIMALAYAN TRUST NEPALKATHMANDU, NEPAL
SUBMITTED BY:
MRB & ASSOCIATESSETO DURBAR, JAMAL, KATHMANDUTel. 243532, Fax No. +977 1 226265E-mail: [email protected]
2-ROOM CLASSROOM BLOCK
CONSTRUCTION OF NEW CLASSROOMS INSOLUKHUMBU DISTRICT
ARCHITECTURE DRAWINGS
Table of Contents ARCHITECTURE Floor Plan .............................................................................................................................................................................................................................................. A1
Roof Plan .............................................................................................................................................................................................................................................. A2
Ceiling Plan ........................................................................................................................................................................................................................................... A3
Elevation ............................................................................................................................................................................................................................................... A4
Section .................................................................................................................................................................................................................................................. A5
Door/ Window Details .......................................................................................................................................................................................................................... A5
Railing Details ....................................................................................................................................................................................................................................... A5
GROUND FLOOR PLANArea: 580.49 sq.ft.
Teac
hers
Pla
tefo
rm
Teac
hers
Pla
tefo
rm
4"*4" varandahVertical Post
46'-2"
W1W1
W2 W2
D D
Ramp1:12
12'
4'
4"
1'-2
"
1'-2"1'-2"
1'-2"
1'-2
" A
A
A B C
2
1
16'-2
"1'
-2"
16'-2
"
21'-4
"
A B C
4"
1'-2"5' 5' 11'-2" 5' 5'
1'-2"
4"
16'-2" 16'-2"
46'-2"
4"1'
-2"
15'
1'-2
"
4'
16'-2
"
21'-8
"
3'-2" 3'-6" 2'-6" 4' 6'-2" 3'-6" 2'-6" 4' 4'-2"
4"16'-2" 16'-2"
Up
4"
12'
Up
2
1
CONSULTANT:
A1KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
FLOOR PLAN
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
DESIGNED BY: RAMA ONTA(RAJBHANDARI)CAROLINE RAJBHANDARI
DRAWN BY: JUBIN SHRESTHA
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
2
1
35'-6"
A B C
16'-2
"
23'-9
"
2
1
A B C
16'-2" 16'-2"
35'-6"
16'-2
"
23'-9
"
16'-2" 16'-2"
ROOF PLAN
Transparent SheetSky Light
Slope Slope Slope
Slope Slope Slope
CONSULTANT:
A2KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
ROOF PLAN
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
DESIGNED BY: RAMA ONTA(RAJBHANDARI)CAROLINE RAJBHANDARI
DRAWN BY: JUBIN SHRESTHA
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
CEILING PLAN
33'-6"
A B C
2
1
16'-2
"
17'-4
"
A B C
16'-2" 16'-2"
33'-6"
16'-2
"
17'-4
"
16'-2" 16'-2"
2
1
7'-1"
1'-9"
6'-2" 7'-1"
1'-9"
6'-2"
6'
11"
False CeilingWooden Plank of6'-0"x0'-8"
2'-0"x2'-0" WoodenFrame
CONSULTANT:
A3KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
REFLECTED CEILING PLAN
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
DESIGNED BY: RAMA ONTA(RAJBHANDARI)CAROLINE RAJBHANDARI
DRAWN BY: JUBIN SHRESTHA
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil" REFLECTED CEILING PLAN
FRONT ELEVATION
D DW1 W1
RIGHT ELEVATION
LEFT ELEVATIONBACK ELEVATION
W2 W2
CONSULTANT:
A4KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
ELEVATION
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
DESIGNED BY: RAMA ONTA(RAJBHANDARI)CAROLINE RAJBHANDARI
DRAWN BY: JUBIN SHRESTHA
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
-1'-0" Ground Level± 0'-0" Plinth Level
+3'-0" Sill Level
+7'-0" Lintel Level
+7'-11" Eaves Level
+12'-4" Ridge Level
2 1SECTION AT A:A
20mm TH. WOODEN FLOORING
3"x 6" WOODEN JOIST
1'-0"x1'-0"x0'-6" CONCRETE BLOCK
EARTH COMPACTION
2'-0"x2'-0"x0'-1"Wooden Frame6'-0"x0'-8"x1
2"Wooden Plank
2"x2" WoodenStrip
12" Th. Wooden
Plank
1.22 mm Th. MSplate
3"x3"x2" WoodenBlock @ 3'-5"c/c onEvery Primary Rafters
WINDOW DETAILS
4'
4'
1'-10" 1'-10"
4'
5'
1'-8" 1'-3" 1'-8"
DOOR DETAILS
7'
3'-6"
1'-6" 1'-6"
7'
6"1'
-1"
4"1'-1
"4"
3'5"
3"
B
B
RAILING DETAILS
CONSULTANT:
A5KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:SECTON, DOOR / WINDOW SCHEDULE &RAILING DETAIL
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
DESIGNED BY: RAMA ONTA(RAJBHANDARI)CAROLINE RAJBHANDARI
DRAWN BY: JUBIN SHRESTHA
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
STRUCTURE DRAWINGS
Table of Contents STRUCTURE Trench Plan(Option-1) ........................................................................................................................................................................................................................... S1
Wall Foundation Section & Ramp Detail(Option-1) .............................................................................................................................................................................. S2
Flooring Detail(Option-1) ...................................................................................................................................................................................................................... S3
Trench Plan(Option-2) ........................................................................................................................................................................................................................... S4
Wall Foundation Section & Ramp Detail(Option-2) .............................................................................................................................................................................. S5
Flooring Detail(Option-2) ..................................................................................................................................................................................................................... S6
Vertical Reinforcement Bar Layout Plan ............................................................................................................................................................................................. S7
Through Concrete Layout Plan & Section ............................................................................................................................................................................................. S8
Ground Floor Plan (Corner stitching & Strengthening At Side Of The Openings & Middle Of The Wall) ........................................................................................... S9
Typical Tie Band, Sill Band, Lintel Band & Top Band Layout Plan ...................................................................................................................................................... S10
Stitching Detail .................................................................................................................................................................................................................................... S11
Stitching, Tie Band, Sill Band, Lintel Band & Top Band section ........................................................................................................................................................... S12
Wall Sections ....................................................................................................................................................................................................................................... S13
Strengthening Of Wall (Section & Detail) ........................................................................................................................................................................................... S14
Typical Truss & Purlin Layout Plan………………………………………………………………………………………………………………………………...S15
Typical Truss Detail & Joints Detail………………………………………………………………………………………………………………………………..S16
Typical Steel Plate Details…………………………………………………………………………………………………………………………………………..S17
Typical Frame Detail For CGI Cladding & Section………………………………………………………………………………………………………………...S18
Typical Truss Detail & Wood Schedule……………………………………………………………………………………………………………………………S19
16'-2"
A B C
TRENCH PLAN
3'
3'
3'
3' 3'
1
1
1 1 1 11 1
TMT 12 Ø VERTICALREINFORCEMENT BAR ATALL CORNERS
TMT 12 Ø VERTICALREINFORCEMENT BAR
2
2
3
3
12'-4"
4'
4'-2
"
16'-2"
TMT 12 Ø VERTICALREINFORCEMENT BAR
4 4
5
5
14"
14"
TMT 12 Ø VERTICALREINFORCEMENT BAR
35'-4"
TMT 12 Ø VERTICALREINFORCEMENT BAR
1
16'-2
"
19'-2
"
2
3'-1
"1'
-2"
TMT 12 Ø VERTICALREINFORCEMENT BAR
CONSULTANT:
S1KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
TRENCH PLAN(OPTION-1)
SHEET NO.
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
3'
1'-8
"1'
6"6"
WALL FOUNDATION SECTION: 1.1
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVELEARTH COMPACTION
4 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c
1'-2"
2'-8
"1'
STONEMASONRY(1:6)
TMT 8Ø @6" c/c
3'
WALL FOUNDATION SECTION: 2.2
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVELEARTH COMPACTION
1'-2"
6"6"
8"1'-2"
1'-2"
STONE MASONRY
EARTH COMPACTION
1" TH. IPS FLOORING4" TH. PCC8" TH. STONE SOLINGEARTH COMPACTION
EARTH COMPACTION
4 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c
3'
WALL FOUNDATION SECTION: 3.3
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVELEARTH
COMPACTION
6"6"
8"1'-2"
9"
9"
4"x4" WOODEN POST
6 mm TH.MS BASE PLATE
6 mm TH. MS PLATE9"x9" PCC BLOCK
STONE MASONRY
1'-2"
STONE MASONRY
EARTH COMPACTION
1" TH. IPS FLOORING4" TH. PCC8" TH. STONE SOLINGEARTH COMPACTION
16 mm Ø MS BOLT
4 NOS. TMT 10ØLONGITUDINAL BAR
4' 1'-2"
1'-2"1'-2" 1'-2"1'-2"
1'-6
"
-1'-0" GROUND LEVEL
EARTH COMPACTIONSTONE MASONRY
1'-6
"6"
6"
1'-6
"6"
6"
4 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c
4 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c
STONEMASONRY(1:6)
STONEMASONRY(1:6)
2'-9
"
A
8"V
ARI
ES
1'-2"-1'-0" GROUND LEVEL
EARTHCOMPACTION
STONE MASONRY
FACE WALL SECTION:5.5
1'-2"
4" TH. PCCEARTH COMPACTION
IPS FLOORING
4"
EARTH COMPACTION
TMT 8Ø @6" c/c
1'-2"
STONE MASONRY
4 NOS. TMT 10ØLONGITUDINAL BAR
4'12' 4"
4"
4" TH. PCC
-1'-0" GROUND LEVEL
2" TH. IPS FLOORING4" TH. PCC
8" TH. STONE SOLINGEARTH COMPACTION
1'
± 00 PLINTH LEVEL
-1'-0" GROUND LEVELFACE WALLAT BOTH SIDE
EARTH COMPACTION
2" TH. IPS FLOORING
EARTH COMPACTION 1'-2"1'-2"
1'-6
"6"
6"
RAMP SECTION:4.4
6"6"
9"
9"
6"x6"x6 mm TH.MS BASE PLATE
9"x9" PCC BLOCK
16 mm Ø MS BOLT
4"x4"x6 mm TH. MS HOLLOW TUBE
DETAIL AT A
S S
4"x4" WOODEN POST
4"x4" WOODEN POST
SECTION: S.S
4"
4"
4"x4"x 6 mm TH.MS HOLLOW TUBE(INTERNAL DIMENSION)
9"
9"
9"x9"x PCC BLOCK
CONSULTANT:
S2KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:WALL FOUNDATION SECTION & RAMP DETAIL(OPTION-1)
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1"=2'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
-1'-0" GROUND LEVEL
WALL FOUNDATION SECTION &
16'-2" 16'-2"
B C
FLOORING PLAN
4'
3" x 6" WOODEN JOIST
TIE BAND
TIE B
AN
D
TIE B
AN
D
TIE B
AN
D
TIE BAND
IPS FLOORINGIPS FLOORING
12' 4"
4'
1'-2
"
1
1
20 mm TH. WOODEN FLOORING
3" x 6" WOODEN JOIST
12"x12"x6" PCC BLOCK
12"x12"x6" PCC BLOCK
1
2
16'-2
"4'
-2"
17'-4
"
1'-1
"3'
-6"
3'-6
"3'
-6"
3'-6
"1'
-1"
A33'-6"
2'-3"1'-1" 2'-3" 2'-3" 2'-8" 2'-3" 2'-3" 1'-1"1'-1"2'-3" 2'-3" 2'-3" 2'-8" 2'-3" 2'-3" 1'-1"
3'
1'-8
"1'
6"6"
FLOORING SECTION: 1.1
EARTH COMPACTION
1'-2"
3'
1'-8
"1'
6"6"
EARTH COMPACTION
1'-2"
20mm TH. WOODEN FLOORING
3"x 6" WOODEN JOIST
EARTH COMPACTION
2'-8
"
TMT 8Ø @6" c/c
6"6"
8"
1'-2"
STONE MASONRY
1" TH. IPS FLOORING4" TH. PCC8" TH. STONE SOLINGEARTH COMPACTION
4 NOS. TMT 10ØLONGITUDINAL BAR
4' 1'-2"
-1'-0" GROUND LEVEL
EARTH COMPACTION
1'-2"
1'-6
"6"
6"
12"x12"x6" PCC BLOCK
12"x12"x6"PCC BLOCK
STONE MASONRYSTONE MASONRY
CONSULTANT:
S3KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
FLOORING DETAILOPTION-1
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0" 1"=2'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
16'-2"
A B C
TRENCH PLAN
3'
3'
3'
3' 3'
1
1
1 1 1 11 1
TMT 12 Ø VERTICALREINFORCEMENT BAR ATALL CORNERS
TMT 12 Ø VERTICALREINFORCEMENT BAR
2
2
3
3
12'-4"
4'
4'-2
"
16'-2"
TMT 12 Ø VERTICALREINFORCEMENT BAR
4 4
5
5
14"
14"
TMT 12 Ø VERTICALREINFORCEMENT BAR
35'-4"
TMT 12 Ø VERTICALREINFORCEMENT BAR
1
16'-2
"
19'-2
"
2
3'-1
"1'
-2"
TMT 12 Ø VERTICALREINFORCEMENT BAR
CONSULTANT:
S4KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE: SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
TRENCH PLAN (OPTION-2)DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
TRENCH PLAN (OPTION-2)
3'
1'-8
"1'
6"6"
WALL FOUNDATION SECTION: 1.1
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVELEARTH COMPACTION
4 NOS. TMT 10ØLONGITUDINAL BAR TMT 8Ø @6" c/c
1'-2"
2'-8
"1'
STONEMASONRY(1:6)
TMT 8Ø @6" c/c
3'
WALL FOUNDATION SECTION: 2.2
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVELEARTH COMPACTION
1'-2"
6"6"
8"1'-2"
1'-2"
STONE MASONRY
EARTHCOMPACTION
2" TH. IPS FLOORING4" TH. PCC8" TH. STONE SOLINGEARTH COMPACTION
4 NOS. TMT 10ØLONGITUDINAL BAR TMT 8Ø @6" c/c
3'
WALL FOUNDATION SECTION: 3.3
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVELEARTH COMPACTION
1'-2"
1'-2"
6"6"
8"
4' 1'-2"
1'-2"
9"
9"
4"x4" WOODEN POST
6"x6"x6 mm TH.MS BASE PLATE
4"x4"x6 mm TH. MSHOLLOW TUBE
PCC BLOCK9"x9"
1'-2"
STONE MASONRY
EARTHCOMPACTION
2" TH. IPS FLOORING4" TH. PCC8" TH. STONE SOLINGEARTH COMPACTION
16 mm Ø MS BOLT
4 NOS. TMT 10ØLONGITUDINAL BAR
4' 1'-2"
6"6"
6"6"
1'-2"
1'-6
"6"
6"
1'-6
"6"
6"
EARTH COMPACTIONSTONE MASONRY EARTH COMPACTION
STONE MASONRY
4 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c
4 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c
STONEMASONRY(1:6)
STONEMASONRY(1:6)
A
8"V
ARI
ES
1'-2"-1'-0" GROUND LEVEL
EARTHCOMPACTION
STONE MASONRY1'-2"
4" TH. PCCEARTH COMPACTION
IPS FLOORING
FACE WALL SECTION:5.5
RAMP SECTION:4.44"
EARTH COMPACTION
TMT 8Ø @6" c/c
1'-2"
STONE MASONRY
4 NOS. TMT 10ØLONGITUDINAL BAR
4'12' 4"
4"
4" TH. PCC
-1'-0" GROUND LEVEL
2" TH. IPS FLOORING4" TH. PCC
8" TH. STONE SOLINGEARTH COMPACTION
1'
± 00 PLINTH LEVEL
-1'-0" GROUND LEVELFACE WALLAT BOTH SIDE
EARTH COMPACTION
2" TH. IPS FLOORING
EARTH COMPACTION 1'-2"1'-2"
1'-6
"6"
6"
4"x4" WOODEN POST
SECTION: S.S
4"
4"
4"x4"x 6 mm TH.MS HOLLOW TUBE(INTERNAL DIMENSION)
9"
9"
9"x9"x PCC BLOCK6"6"
9"
9"
6"x6"x6 mm TH.MS BASE PLATE
9"x9" PCC BLOCK
16 mm Ø MS BOLT
4"x4"x6 mm TH. MS HOLLOW TUBE
DETAIL AT A
S S
4"x4" WOODEN POST
CONSULTANT:
S5KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE: SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1"=2'-0"
WALL FOUNDATION RAMP DETAIL(OPTION-2)DESIGNED BY:
MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL" WALL FOUNDATION RAMP DETAIL
16'-2" 16'-2"
B C
FLOORING PLAN
4'
TIE BAND
TIE B
AN
D
TIE B
AN
D
TIE BAND
1
1
IPS FLOORING
12' 4"
IPS FLOORINGIPS FLOORING
IPS FLOORING
TIE B
AN
D
33'-6"
1
16'-2
"
17'-4
"
2
A
1'-2
"
4'-2
"
4'
3'
1'-8
"1'
6"6"
FLOORING SECTION: 1.1
EARTH COMPACTION
1'-2"
3'
1'-8
"1'
6"6"
EARTH COMPACTION
1'-2"
2'-8
"
TMT 8Ø @6" c/c
6"6"
8"
1'-2"
STONE MASONRY
2" TH. IPS FLOORING4" TH. PCC8" TH. STONE SOLINGEARTH COMPACTION
4 NOS. TMT 10ØLONGITUDINAL BAR
4' 1'-2"
-1'-0" GROUND LEVEL1'-2"
1'-6
"6"
6"
2" TH. IPS FLOORING4" TH. PCC8" TH. STONE SOLINGEARTH COMPACTION
EARTH COMPACTIONSTONE MASONRY
STONEMASONRY(1:6)
STONEMASONRY(1:6)
CONSULTANT:
S6KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
FLOORING DETAILOPTION-2
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0" 1"=2'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
-1'-0" GROUND LEVEL
VERTICAL REINFORCEMENT BAR LAYOUT PLAN
1'-2"1'
-2"
14" TH. STONE MASONRY (1:6)
TMT 12 Ø VERTICALREINFORCEMENT BAR
3" Ø (INTERNAL) X 2' LONG PIPE SLEEVE
1'-2"
1'-2
"
14" TH. STONE MASONRY (1:6)
TMT 12 Ø VERTICALREINFORCEMENT BAR
3" Ø (INTERNAL) X 2' LONG PIPE SLEEVE
WALL PLAN AT CORNERWALL PLAN AT T JUNCTIONVERTICAL REINFORCEMENT BAR LAYOUT PLAN
USE OF PIPE SLEEVE AROUND UNIFORM VOID FORREINFORCEMENT AS PER FOLLOWING STEPS:
1. PLACE PIPE SLEEVE AROUND REINFORCEMENT .2.BUILD MASONRY AROUND THE PIPE SLEEVE.3.LIFT THE PIPE SLEEVE LEAVING HOLLOW IN MASONRY.4. FILL THE VOID WITH MIXED CONCRETE AND COARSE AGGREGATE 10 mm.5. REPEAT THE PROCESS.
CONSULTANT:
S7KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:VERTICAL REINFORCEMENT BARLAYOUT PLAN
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL" VERTICAL REINFORCEMENT BAR
WALL PLAN AT T JUNCTION
1'-2"
1'-2
"
4'
4' 4'
4"
14" x 6"x 6"THROUGH CONCRETE BLOCK
14" x 6"x 6" THROUGHCONCRETE BLOCK
14" x 6"x 6"THROUGH CONCRETE BLOCK
14" TH. STONE MASONRY (1:6)
THROUGH CONCRETE BLOCK LAYOUT PLAN
1'-2"
1'-2
"4'
4'
14" x 6"x 6"THROUGH CONCRETE BLOCK
14" x 6"x 6"THROUGHCONCRETE BLOCK
14" TH. STONE MASONRY (1:6)
TMT 8 Ø
TMT 8 Ø
TMT 8 Ø
TMT 8 Ø TMT 8 Ø
WALL PLAN AT CORNERTHROUGH CONCRETE BLOCK LAYOUT PLAN
A A
2'6"
2'
PLINTH LEVEL
1'-2"
WALL SECTION
14" TH. STONE MASONRY (1:6)
14" x 6"x 6"THROUGH CONCRETE BLOCK
TMT 8 Ø
B
14" x 6"x 6"THROUGH CONCRETE BLOCK
TMT 8 Ø
6"
1'-2"6"
TMT 8 Ø
DETAIL AT B
1'-2"
6" 4"
DETAIL AT A
14" x 6"x 6"THROUGH CONCRETE BLOCK
TMT 8 Ø
STONE MASONRY
CONSULTANT:
S8KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:THROUGH CONCRETE BLOCK LAYOUTPLAN & SECTION
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1"=2'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL" THROUGH CONCRETE BLOCK LAYOUT
16'-2" 16'-2"
A B C
5'1'-2" 4'-9" 3" 3" 4'-9" 1'-2" 4'-9" 3" 5' 3" 4'-9" 1'-2"
4'
1'-2"1'-9"3" 3'-6" 3" 2' 3" 4' 3" 2'-9" 1'-2"1'-9"3" 3'-6" 3" 2' 3" 4' 3" 2'-9" 1'-2"
A
B
33'-6"
4'
1
2
16'-2
"
1'-2
"4'
-6"
3"5'
-6"
3"4'
-6"
1'-2
"4'
17'-4
"
4'-2
"
3
4'4'
3
4'
CORNER STITCHINGREFER SHEET NO.S11 &S12
C1
1 FOR SECTION 1.1REFER SHEET NO.S13
FOR DETAIL CREFER SHEET NO.S14
4'
CORNER STITCHINGREFER SHEET NO.S11 &S12
4'
4'-2"3'-2"
CORNER STITCHINGREFER SHEET NO.S11 &S12
T JUNCTION STITCHINGREFER SHEET NO.S11 &S12
T JUNCTION STITCHINGREFER SHEET NO.S11 &S12
4'
6'-2"
GROUND FLOOR PLANCORNER & T JUNCTION STITCHING &STRENGTHENING AT SIDE OF THE OPENINGS &MIDDLE OF THE WALL
FOR DETAIL AREFER SHEET NO.S14
2 2FOR SECTION 2.2REFER SHEET NO.S13
FOR SECTION 3.3REFER SHEET NO.S1244
FOR SECTION 4.4REFER SHEET NO.S12
4'
4' 4'
CORNER STITCHINGREFER SHEET NO.S11 &S12
FOR DETAIL BREFER SHEET NO.S14
CONSULTANT:
S9KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE: SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
GROUND FLOOR PLANCORNER STITCHING & STRENGTHENINGAT SIDE OF THE OPENINGS & MIDDLEOF THE WALL
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL" GROUND FLOOR PLAN
CORNER STITCHING & STRENGTHENING
16'-2" 16'-2"
B C
4'
BAND
BA
ND
12' 4"
33'-6"
1
16'-2
"
17'-4
"
2
A
1'-2
"
4'-2
"
4'
BA
ND
BA
ND
BAND
TYPICAL TIE BAND, SILL BAND, LINTEL BAND &TOP BAND LAYOUT PLAN
FOR TIE BAND, SILL BAND, LINTELBAND & TOP BAND DETAILREFER SHEET NO. S12 & S14
CONSULTANT:
S10KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE: SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 3"=16'-0"
TYPICAL TIE BAND, SILL BAND, LINTELBAND & TOP BAND LAYOUT PLANDESIGNED BY:
MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL" TYPICAL TIE BAND, SILL BAND, LINTEL
1'-2"
1'-2
"
4'
4'
2 Nos TMT 10 Ø
2 Nos TMT 10 Ø
TMT 8 Ø @ 6"c/c
TMT 8 Ø @ 6"c/c
STITCHING DETAIL(PLAN) AT T JUNCTION OF WALL
4'
14" TH. STONE MASONRY (1:4)
TMT 12 Ø VERTICALREINFORCEMENT BAR
1
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c U HOOK
1" 1' 1"1'-2"
3"
2" 2"
TYPICAL CORNER STITCHING &T JUNCTION STITCHING DETAIL(SECTION:1.1)
STITCHING DETAIL(PLAN) AT CORNER OF WALL
1'-2"
1'-2
"
4'
4'
2 Nos TMT 10 Ø
2 Nos TMT 10 Ø
TMT 8 Ø @ 6"c/c
TMT 8 Ø @ 6"c/c
14" TH. STONE MASONRY (1:4)
TMT 12 Ø VERTICALREINFORCEMENT BAR
1
STITCHING DETAIL(PLAN) AT CORNER OF WALL
1'-2"
1'-2
"
3'-2"
4'
2 Nos TMT 10 Ø
2 Nos TMT 10 Ø
TMT 8 Ø @ 6"c/c
TMT 8 Ø @ 6"c/c
14" TH. STONE MASONRY (1:6)
TMT 12 Ø VERTICALREINFORCEMENT BAR
1
2 Nos TMT 10 ØVERTICAL BAR
CONSULTANT:
S11KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
STITCHING DETAIL
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1"=2'-0", 1"=1'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
T JUNCTION STITCHING DETAIL(SECTION:1.1)T JUNCTION STITCHING DETAIL(SECTION:1.1)
1'6"
3"1'
-10.
5"1'
-10.
5"3"
1'-3
"6"
4'
4'
-1'-0" GROUND LEVEL
STITCHING & TIE BAND, SILL BAND, LINTEL BAND & TOP BANDSECTION AT CORNER OF WALL(SECTION:3.3)
1'-3
"3"
6"6"
CORNER WALL
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
6" TH. TIE BAND
3" TH. CORNERSTITCHING
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR3" TH. SILL BAND
3" TH. CORNERSTITCHING
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
6" TH. LINTEL BAND
6" TH. TOP BAND
2'-8
"
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVEL
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10Ø LONGITUDINAL BAR TMT 8 Ø @ 6"c/c
2 NOS. TMT 10Ø LONGITUDINAL BAR
TMT 12 Ø VERTICALREINFORCEMENT BAR
3"
-3'-8" FOUNDATION LEVEL
+3'-0" SILL LEVEL
+7'-0" LINTEL LEVEL
+9'-0"TOP BAND LEVEL
+5'-2.5" STITCHING LEVEL
+1'-6" STITCHING LEVEL
14" TH. STONEMASONRY
1
1
2
2
2
1
1'6"
3"1'
-10.
5"1'
-10.
5"3"
1'-3
"6"
4'
4'
1'-3
"3"
6"6"
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
6" TH. TIE BAND
3" TH. T JUNCTIONSTITCHING TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR3" TH. SILL BAND
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
6" TH. LINTEL BAND
6" TH. TOP BAND
2'-8
"
2 NOS. TMT 10ØLONGITUDINAL BAR TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10Ø LONGITUDINAL BAR TMT 8 Ø @ 6"c/c
2 NOS. TMT 10Ø LONGITUDINAL BAR
4'
4'
3" TH. T JUNCTIONSTITCHING
TMT 12 Ø VERTICALREINFORCEMENT BAR
3"
14" TH. STONEMASONRY
1
1
1
2
2
2
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVEL
+3'-0" SILL LEVEL
+7'-0" LINTEL LEVEL
+5'-2.5" STITCHING LEVEL
+1'-6" STITCHING LEVEL
+9'-0"TOP BAND LEVEL
STITCHING & TIE BAND, SILL BAND, LINTEL BAND & TOP BANDSECTION AT T JUNCTION OF WALL(SECTION:4.4)
6"
4 NOS. TMT 10Ø LONGITUDINAL BAR
1'-2"
TYPICAL TIE BAND, LINTEL BAND & TOP BAND DETAIL(SECTION:1.1)
TMT 8Ø @6" c/c
STONE MASONRY
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c U HOOK
1" 1' 1"1'-2"
3"
2" 2"
TYPICAL SILLBAND, CORNER STITCHING &T JUNCTION STITCHING DETAIL(SECTION:2.2)
CONSULTANT:
S12KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:STITCHING & TIE BAND, SILL BAND,LINTEL BAND & TOP BAND SECTION
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1"=2'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
1
3'
1'-8
"1'
6"6"
2'-9
"3"
4'6"
1'6"
9'
WALL SECTION :1.1
1'-2"
OUT IN
14" TH. STONEMASONRY(1:6)
4 NOS. TMT 10ØLONGITUDINALBAR
TMT 8Ø @6" c/c4 NOS. TMT 10ØLONGITUDINALBAR TMT 8Ø @6" c/c
2 NOS. TMT 10ØLONGITUDINAL BARTMT 8Ø @6" c/cU HOOK
1'-2"
EARTH COMPACTION
1'-2"
4 NOS. TMT 10ØLONGITUDINAL BAR
1'-2"
TMT 8Ø @6" c/c
3'1'
-8"
1'6"
6"2'
-9"
3"4'
6"1'
6"
9'
WALL SECTION :2.2
1'-2"
OUT IN
14" TH. STONEMASONRY(1:6)
-1'-0" GROUND LEVEL
-3'-8" FOUNDATION LEVEL
4 NOS. TMT 10ØLONGITUDINALBAR TMT 8Ø @6" c/c
4 NOS. TMT 10ØLONGITUDINALBAR TMT 8Ø @6" c/c
2 NOS. TMT 10ØLONGITUDINAL BARTMT 8Ø @6" c/cU HOOK
EARTH COMPACTION
1'-2"
1'-2"
1'-2"
2'-8
"
2'-8
"
1'1'
WOODEN TRUSSAS PER DETAIL
4 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8Ø @6" c/c
WOODEN TRUSSAS PER DETAIL
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVEL
+3'-0" SILL LEVEL
+7'-0" LINTEL LEVEL
+5'-2.5" STITCHING LEVEL
+1'-6" STITCHING LEVEL
-1'-0" GROUND LEVEL
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVEL
+3'-0" SILL LEVEL
+7'-0" LINTEL LEVEL
+5'-2.5" STITCHING LEVEL
+1'-6" STITCHING LEVEL
+9'-0"TOP BAND LEVEL +9'-0"TOP BAND LEVEL
24 GAUZECGI SHEET
24 GAUZECGI SHEET
CONSULTANT:
S13KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
WALL SECTIONS
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1"=2'-0"
DESIGNED BY:MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
1"1' 1'-2
"
3"
2"2"
DETAIL AT B
2 NOS. TMT 10ØVERTICAL BAR
TMT 8Ø @6" c/c U HOOK
2
SECTION:1.1
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
6" TH. TIE BAND
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR3" TH. SILL BAND
6" TH.LINTEL BAND
6" TH. TOP BAND
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10Ø LONGITUDINAL BAR TMT 8 Ø @ 6"c/c
2 NOS. TMT 10Ø LONGITUDINAL BAR
14" TH. STONEMASONRY
2 NOS. TMT 10ØVERTICAL BAR
TMT 8Ø @6" c/c U HOOK
3"
SECTION:2.2
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
6" TH. TIE BAND
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR3" TH. SILL BAND
6" TH. LINTEL BAND
6" TH. TOP BAND
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10Ø LONGITUDINAL BAR TMT 8 Ø @ 6"c/c
2 NOS. TMT 10Ø LONGITUDINAL BAR
14" TH. STONEMASONRY
2 NOS. TMT 10ØVERTICAL BAR
3"
DOOR
1'6"
4'3"
2'-9
"6"
-1'-0" GROUND LEVEL
SECTION:3.3
6"6"
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
6" TH. TIE BAND
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR3" TH. SILL BAND
6" TH. LINTEL BAND
6" TH. TOP BAND
2'-8
"
± 00 PLINTH LEVEL
-3'-8" FOUNDATION LEVEL
2 NOS. TMT 10ØLONGITUDINAL BAR
TMT 8 Ø @ 6"c/c
2 NOS. TMT 10ØLONGITUDINAL BAR
2 NOS. TMT 10Ø LONGITUDINAL BAR TMT 8 Ø @ 6"c/c
2 NOS. TMT 10Ø LONGITUDINAL BAR
+3'-0" SILL LEVEL
+7'-0" LINTEL LEVEL
+9'-0"TOP BAND LEVEL
14" TH. STONEMASONRY
2 NOS. TMT 10ØVERTICAL BAR
3"
WINDOWTMT 8Ø @6" c/c U HOOK TMT 8Ø @6" c/c U HOOK
2 NOS. TMT 10ØVERTICAL BAR
TMT 8Ø @6" c/c U HOOK
1" 1' 1"1'-2"
3"
2" 2"
DETAIL AT A
1
1"1' 1'-2
"
3"
2"2"
DETAIL AT C
2 NOS. TMT 10ØVERTICAL BAR
TMT 8Ø @6" c/c U HOOK
3
CONSULTANT:
S14KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE: SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1"=2'-0" 1"=1'-0"
STRENGTHENING OF MASONRY WALLSECTION & DETAILDESIGNED BY:
MANOHAR RAJBHANDARINIMA STHAPITBIJENDRA MAN PRADHANDILENDRA MAHARJANDRAWN BY: M. BAJRACHARYA
TEAM LEADER:MANOHAR RAJBHANDARI4042"CIVIL"
2
SECTION:2.2
TMT 8Ø @6" c/c U HOOK
CONSULTANT:
TYP. TRUSS & PURLIN LAYOUT PLAN
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
35'-6"
9'-8
"13
'-8"
23'-4
"
3"x3" Purlin
4"x4" Vertical Post
Roofing Sheet
Main Truss
3"x3" Bracing
5'-5" 5'-5" 5'-5" 5'-5" 5'-5" 5'-5"
Wall
A B C
2
1
CONSULTANT:
KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
TYP. TRUSS & PURLIN LAYOUT PLAN
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: 1/ 4"=1'-0"
S15
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TYP. TRUSS & PURLIN LAYOUT PLAN
3"x3" Vertical Strut1.22 mm thick Steelplates (18gauze) with nail
3"x5" RafterRidge Cover
24 GauzeCGI Sheet
3"x3" Purlin
4"x5"HorizontalBeam
4"x4"VerticalPost
Eaves
3"x4" Inclined Strut3"x5"Main Tie
3"x3" Vertical Strut1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8" 1'-8"
3"x4" Vertical Strut
TYP. TRUSS DETAILSScale= 1/ 2": 1'-0"
A
B
C
D 16Ø U hook7"
16'-2"4'-3"1'-4" 2'-1"
Horizontal BeamJoint Detail
Rafter & Main TieJoint Detail
16Ø U hook
TYP. JOINT DETAILSScale= 3/ 4": 1'-0"
7"
4'-3"1'-4" TYP. TIMBER JOINT DETAIL
2"
2"
CONSULTANT:
KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:TYP. TRUSS DETAIL & TRUSS JOINTSDETAIL
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: As Shown
S16
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
DETAIL AT D
1.22 mm thick Steelplates (18gauze) with nail
24 GauzeCGI Sheet
3"x5" Rafter
3"x5"Main Tie
3"x3" Purlin
1.22mm thick Steel plate
No. of nails= 24
8"
11"
11"
3"x5"Main Tie
24 GauzeCGI Sheet
3"x4" Inclined Strut
3"x5" Rafter
3"x3" Purlin
3"x3" Vertical Strut
1.22 mm thick Steelplates (18gauze)with nail
DETAIL AT CNo. of nails= 52
1'-1"
5"3"
1'-3"
7"4"7"
Nail
Ridge Cover
24 GauzeCGI Sheet
3"x3" Purlin
1.22 mm thick Steelplates (18gauze) with nail
3"x5" Rafter
3"x4" Vertical Strut
DETAIL AT A
1.22 mm thickSteel plates(18gauze) withnail No. of nails= 28
5"
4"
8"
4"
DETAIL AT B
3"x4" Vertical Strut
3"x4" Inclined Strut
1.22 mm thick Steelplates (18gauze)with nail
3"x5"Main TieNo. of nails= 44
11"
1'-1"
CONSULTANT:
KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
TYP. STEEL PLATE DETAILS
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: As Shown
S17
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
3"x5" Rafter
TYP. STEEL PLATE DETAILS
TYP. FRAME DETAIL FOR CGI CLADDINGScale= 3/ 4": 1'-0"
Ridge Cover
24 GauzeCGI Sheet
3"x3" Purlin
2' 1'-10" 1'-10" 1'-10" 1'-10" 1'-10" 1'-10" 2'3"x3" Horizontal tie 3"x3" Vertical Strut
3"x3" Rafter
1'-1
"1'
-7"
16'-2"
SECTION AT 1-1
24 GauzeCGI Sheet
Ridge Cover
6"
24 GauzeCGI Sheet
3"x3" memberfor CGI cladding
Main Truss
3"x3" Purlin
TYP. HORIZONTAL BEAM& POST JOINT DETAIL
4"x5"HorizontalBeam
4"x4"VerticalPost
3"x5" Rafter
2"
2"
CONSULTANT:
KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:TYP. FRAME DETAIL FOR CGI CLADDING& SECTION
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: As Shown
S18
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TYP. FRAME DETAIL FOR CGI CLADDING
WOOD SCHEDULESNO. DESCRIPTION SYMBOL
1 Rafter RA2
Main Tie MT3Vertical strut VS14Vertical strut VS5Inclined Strut IS6Horizontal beam HB
NOS.1
11221
Rafter RA1 1
Post PO 578
Purlin - 159
LENGTH
2'-6"1'-6"
8'-2"
17'-4"13'-9"9'-9"
3'-10"32'-4"
34'-10"
SIZE3" x 5"3" x 5"3" x 5"3" x 4"3" x 3"3" x 6"5" x 54"4" x 4"3" x 3"
VS
VS1IS IS
MTMT
RA1 VS
RA
HB
PO
16'-2"TYP. TRUSS DETAILSScale= 1/ 2": 1'-0"
4'-3"1'-4" 2'-1"
5'-6"
6'
6'
6'
4'-6"
24 GauzeCGI Sheet
1'-6"
CONSULTANT:
KATHMANDU, NEPAL
HIMALAYAN TRUST NEPALPROJECT:
CONSTRUCTION OF NEW CLASS ROOMSIN SOLUKHUMBU DISTRICT
SHEET TITLE:
TYP. TRUSS DETAIL & WOOD SCHEDULE
SHEET NO.
DATE: FEBRUARY,2016
Seto Durbar, Jamal, KathmanduTel. 243532, Fax No. +977 1 226265
E-mail: [email protected] SCALE: As Shown
S19
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TEAM LEADER:Er. MANOHAR RAJBHANDARI4042 "Civil"
DRAWN BY: A. NAPIT
DESIGNED BY:Manohar RajbhandariNima SthapitBijendra Man PradhanDilendra Maharjan
TYP. TRUSS DETAIL & WOOD SCHEDULE