    GENERAL NOTES

    CONCRETING:

    1. MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE DPWHSTANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS2004 EDITION VOLUME II.

    2. CONSTRUCTION (CONTACT !OINTS ARE FORMED WHEN CONCRETE

    ONONE SIDE OF THE !OINT IS POURED AHEAD AND ALLOWED TO SET

    BEFOREPOURING ON THE OTHER SIDE.

    ". AT CONSTRUCTION !OINTS (LONGITUDINAL OR TRANSVERSE CARESHOULD BE TAKEN THAT NO CONCRETE FROM THE LAST SLAB FACE

    OVERHANGS ANY PORTION OF THE FIRST SLAB.

    4. TIE BARS SHOULD BE DEFORMED STEEL BARS, ALL DOWEL BARS

    SHALL BE SMOOTH ROUND STEEL.

    #. TYPE OF WEAKENED PLAIN !OINT TO BE USED SHALL BE AS

    SPECIFIED IN THE PLANS AND ONLY ONE TYPE SHALL BE USED FOR THE

    WHOLE PRO!ECT.

    $. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEETMETAL GAUGE NO. 1% OF BLACK IRON FREE FROM RUST AND KINKS.

    &. AT LEAST SI' ($ SUCCESSIVE DOWELED BUTT !OINTS AT NORMAL

    !OINT SPACING SHALL BE PROVIDED BEFORE OR AFTER AN E'PANSION

    !OINT.

    %. THE GROOVE OR CRACK ABOVE !OINTS (LONGITUDINAL OR

    TRANSVERSE SHALL BE SEALED WITH "0 #0 PENETRATION ASPHALT

    SEAL OR COLD APPLIED LI)UID RUBBER COMPOUND AFTER THE

    CONCRETE HAD BEEN CURED AND OPEN BEFORE OPENING THE

    PAVEMENT TO TRAFFIC. PENETRATION ASPHALT SEAL OR CONCRETE

    PAVEMENT SHOULD BE POURED ON SUCH MANNER THAT SPILLING

    WILL BE ELIMANATED * PREVENTED THUS, PROVIDE A SMOOTH

    LEVELING SURFACE.

    +. ALL TRANSVERSE !OINTS, E'CEPT CONSTRUCTION !OINT SHALL BE

    CONTINOUS FROM EDGE TO EDGE

  • 8/12/2019 higway engineering

    2/23

    10. ALL LONGITUDINAL !OINTS SHALL MEET AT INTERSECTION WITH NO

    GAPS AND OFFSETS.

    11. PRIOR TO CONSTRUCTION CONDUCT BORING FOR VERIFICATION

    OF PAVEMENT THICKNESS (PCCP.

    12. VERIFY*CHECK STABILITY OF E'ISTING SUB GRADE AFTER REMOVAL

    OF DETERIORATED PAVEMENT, PRIOR TO ITS RECONSTRUCTION *

    REPLACEMENT.

  • 8/12/2019 higway engineering

    3/23

    V. LEGAL PROBLEM

    PROPOSAL DESIGN OF CONSTRUCTION OFNATIONAL ROADS ALONG SAN MIGUEL AKLE

    ANGAT ,BULACAN ROADS, SECTION KM. 0030+00

    TO KM. 0044 + 800

    LEGAL PROBLEMS, TO BE CONSIDERED IN THE PROPOSAL DESIGN OF

    THE HIGHWAY.

    E!"#$%&'( P)%*%$' R'-")(%*- D/!

    A- ///- 356 675 55 853/858 /35 65 9/;/ 6/;6/3.

    T&' S!"!' "*( 1!&') -12')*'*!"$ /*%! (1 *1! !"*( %* !&'""%! 1 %*/)') 1 !&' "'! 1 !&' )1"(.

    D/! % $%%!'( !1 !&"! 1 "%*!"%*%*- !&' )1"(5" !' %* "1*(%!%1* )'"1*"#$ "' 1) /#$% !)"2'$ # 1!1)%! 5&1")' !&''$2' '6')%%*- 1)(%*") ")'.

    I* "* "!%1* "-"%*! !&' S!"!', 1) 1!&') -12')*'*!"$ '*!%!%',!1 )'12') 1) ('"!&, %*7/), 1) )1')! (""-' "/'( # "(''! $%*- %*, "$1*-, "#12' 1) "(7"'*! !1 !&' "2'( /)"'1) !&' &1/$(') 1) #') 1 !&' )1"(5", %! % *''") !1'!"#$%& !&"! !&' (''! 5" !&' )16%"!' "/' 1 !&'

    "%('*!, "*( " " *''") 1)1$$"), !&"! !&' '/'*!%"$&"%* 1 '2'*! $'"(%*- !1 !&' "%('*! 5" *1! #)19'* # "*':%'*!, %*!')2'*%*-, 1) %*(''*('*! "/'.

    A " /)!&') 1*(%!%1* )''('*! !1 )'12') %! % *''") !1'!"#$%& !&"! !&' S!"!' 1) /#1)(%*"!' -12')*'*!"$ "-'* &"('%!&') "!/"$ 1) 1*!)/!%2' *1!%' 1 !&' (''! "*( "! !&' "'

  • 8/12/2019 higway engineering

    4/23

    !%' 5" "1)('( " )'"1*"#$' 11)!/*%! !1 !"9' )''(%"$ "!%1*5%!& )''! !&')'!1.

    R''*! C1/)! D'!')%*"!%1*. T6/ >==5@5 ==5 39/58 6535 @35 9 855@/5 5 5;53 9 65 = 9 65

    5 9 / >8/7//9. O5 75- /@=9 39/85/9 / 36

    />/9 8 =55 3> 9 39>3/75 9/35 9 398//9

    689> 9 65 @99/; =>/3. T

  • 8/12/2019 higway engineering

    5/23

    65595, 5/575 65 S5 9 - 8>- 9 ;>8 ;/, - 5@97,

    /5, /;/;, 965/85 65 /;6?9?- 9 595 35 - 398>3/; 8/75?-

    /=53/9 - >/58 =595. I 8/558 398//9 / 958 -

    9575, 65 S5 6 65 8>- 9 5 5@58/ 3/9,

  • 8/12/2019 higway engineering

    6/23

    A- 893/ 5,

    C9>3/ 35 65 =95/ 9 98 365 8 />/5 9 65 /8;5 8

    ==9365 /3>8/; - /553/9 8 3953/; 98.

    P97/85 5 3///5 9 =585/ 8 3-3/.

    I)12' !)": ':%'* #'!5''* S"* M%-/'$ "*( A9$', A*-"!

    P97/85 5J3/5 335 9 5398 39/; 9 65 C535 R/75 8 9

    65 S5 98 5

  • 8/12/2019 higway engineering

    7/23

    P97/85 J3 @;5@5 5/9 6 39@=5@5 5//; 8 >>5 8 >5

    8 >==9 85759=@5 9==9>//5.

    P97/85 /@=9758 9==9>//5 9 5399@/3 8 9>/ 85759=@5 9

    S M/;>5, B>3

    P97/85 9 39@@53/ =9 /3>8/; B?89>5 /58.

    P97/85 998 /@@>/- 9 65 /8;5 9 1 / 100 -5 998 575, 8 9

    65 ==936 98 9 1 / 20 -5 998 575, /58.

    P97/85 7/;/9 3535 9@ 65 88//9 39/; 9 /75 >5.

    I*21$2' "$$ !"9'&1$(') "*( 1*%(') !&'%) %*!')'!

    D5759= 9>/9 6 39/85 39@@>/- 5=53/9 9 65 =953.

    S/- 65 536/3 8 =9358> 5>/5@5 9 R98 8 @//@5

    57/35 (9@5- R98 8 TJ3 A>69/- 9@ 65 39@@>/- /9 65 85759=@5 9 65 =953

    69>;6 65 /@=5@5/9 9 39@=565/75 =9;@ 9 39@@>/-

    39>/9 8

    P/3/=/9.

    P)12%(' 2"$/' 1) 1*'

    A36/575 >/5 55*39 /9 985 39.

    D5759= 5;- 9 /5;5 >>5 >=;85 /9 65 =953.

    M%*%%8/;

    =9=5- /@=3.

  • 8/12/2019 higway engineering

    8/23

    M//@/5 65 /@=3 9 5/85/ @5/-, /3>8/; 9/5, 7//9, /

    >/- 53.

    M//@/5 65 /@=3 9 65/;5.

    M//@/5 /@=3 9 65 > 57/9@5.

    P97/85 =953 6 5//75- /9 65 >/, > 8 39@@>/-

    395.

    M//@/5 998/; /@=3 3>58 - 65 =953.

    T&'' 1#7'!%2' ")' %1)!"*! " !&' 5%$$ #' /'( !1 1")' "*(

    &1)!;$%! !&' )'$%%*") )1/!' 1!%1* "*( %('*!% " )'1'*('(

    )''))'( $1"!%1* 1) !&' "((%!%1*"$ )1%*-.

  • 8/12/2019 higway engineering

    9/23

    II. PRO=ECT DESCRIPTION

    T65 =>=95 9 6/ =953 853/=/9 / 9 853/5 65 =9=958

    39>3/9 9 65 1#@ 9 39355 8/75/9 98 6 6 39@@535 /

    S M/;>5, B>3 8 6 5@/5 / A5 / 65 M>/3/=/- 9 A;,B>3.

    T65 =953 6 5 2?5 98 @5 9 J3 8 6 5/575 J3 398//9 /

    S M/;>5

    T65 98 /==58

  • 8/12/2019 higway engineering

    10/23

    IV. SOURCES OF FUNDS

    H 9 65 =953 39 8558 - 65 P6//==/5 G975@5. A

    2"0 M//9 P59 9 ?.@ KM HIGHWAY SAN MIGUEL TO AKLE, ANGAT, BULACANINTRODUCTION

    P)17'! B"9-)1/*(

    T65 1#.$ KM HIGHWAY SAN MIGUEL TO AKLE, ANGAT, BULACAN =953

    /5858 9 39>3 6/;65 9 A5, A; B>3

    9 65 85759=@5 9 65 /9 98 5- / 5

    85759=58 5 /3 W9 8 H/;68/; 65 /@=975@5 9 /9 98,

    56///9 8 >3> 975-, /8/; / 7/9> 5, =953 3998//9 8 55

    @9/9/; 8 57>/9.

    T65 5/@58 =953 39 /75 85=@5 9 65 P6//==/5 ;975@5 5=9/5 9

    5- 9 =953 / 65 58 9 =>/3

  • 8/12/2019 higway engineering

    11/23

    @/535 9 65 P6//==/5 98 5858 - DPWH 8 93 ;975@5 9 B>3. T65

    ==936 9 855@//; 65 93/9 9 >8/; / 9< 3//3 3935 9

    =97/3/ 8 93 98 ;53/5. T9 /5 88//9 575>5 9 98, 65

    PRC 69>8 5/65 /355 5//; 5 9 5/6 5< 575>5?//;

    @536/@. A8 6/9/3-, 65 >5 9 9 9 35 98/- 98=9;@ 6 ;5- 933>58 65 8/35/9 9 =97/3/ 8 93

    ;975@5.

    I. SCENARIO OF THE DESIGN

    A.!.A I3. / 3/7/ 8 39>3/9 39@=- 6 6 >/ 9;

    5=>/9 9 85/75/; >/- 57/35, 9 /@5, 8 39@=5//75

    =/35. W5 =/85 9>575 9 5/; /58 8 5=5/5358 / =53 9

    3/7/ 39>3/9 8 6/, 39@/58 55/75 9 @9 =-5 / 6/ /8>-.

    O> 39@@/@5 9 /97/9 8 535535 /7/- 5> /

    >335>- 39@=558 =953 9 96 3939 8 3/5. W5 >858

    8 =9@95 65 /85 9 5

    65/ ;9 5 @5.

    A A.!.A I3., =9 9> >5 8 5 =/95 8 8/75

    9 39/>5 65 6/;6 575 9 3>9@5 /3/9 855 7/5- 9 =953 9 >/>5 8

    5/5 =953 @;5@5 -5@ 5>5 6 =9//75 9>39@5 /

    36/5758 5;85 9 /5 9 >5 9 65 =953

    II. PRO=ECT DESCRIPTION

    T65 =>=95 9 6/ =953 853/=/9 / 9 853/5 65 =9=958

    39>3/9 9 65 1#@ 9 39355 8/75/9 98 6 6 39@@535 /

    S M/;>5, B>3 8 6 5@/5 / A5 / 65 M>/3/=/- 9 A;,

    B>3.

  • 8/12/2019 higway engineering

    12/23

    T65 =953 6 5 2?5 98 @5 9 J3 8 6 5/575 J3 398//9 /

    S M/;>5

    T65 98 /==58 5 9 A5, A;, B>3 8 5

    395358 - 98 ;6 3=3/- 9 339@@985

    65 756/35 95 9 6/ 655 933> 9 9 />5 9>

    =9/9. T65 />5 3 5 58 995 5< 6/;6358, 1#.$ KM

    HIGHWAY SAN MIGUEL TO AKLE, ANGAT, BULACAN

    IV. SOURCES OF FUNDS

    T65 5/@58 =953 39 /75 85=@5 9 65 P6//==/5 ;975@5 5=9/5 9

    5- 9 =953 / 65 58 9 =>/3 3. T65

    ==936 9 855@//; 65 93/9 9 >8/; / 9< 3//3 3935 9

  • 8/12/2019 higway engineering

    13/23

    =97/3/ 8 93 98 ;53/5. T9 /5 88//9 575>5 9 98, 65

    PRC 69>8 5/65 /355 5//; 5 9 5/6 5< 575>5?//;

    @536/@. A8 6/9/3-, 65 >5 9 9 9 35 98/- 98

    =9;@ 6 ;5- 933>58 65 8/35/9 9 =97/3/ 8 93

    ;975@5.

    T65 1#.$ KM HIGHWAY SAN MIGUEL TO AKLE, ANGAT, BULACAN 98 =953

    8 5 >858 - DPWH 8 93 ;975@5 9 B>3. T65 ==936

    9 855@//; 65 93/9 9 >8/; / 9< 3//3 3935 9

    =97/3/ 8 93 98 ;53/5. T9 /5 88//9 575>5 9 98, 65

    PRC 69>8 5/65 /355 5//; 5 9 5/6 5< 575>5?//;

    @536/@. A8 6/9/3-, 65 >5 9 9 9 35 98/- 98

    =9;@ 6 ;5- 933>58 65 8/35/9 9 =97/3/ 8 93

    ;975@5.

    V. LEGAL PROBLEM

    PROPOSAL DESIGN OF CONSTRUCTION OF NATIONAL ROADS ALONG

    SAN MIGUEL AKLE ANGAT ,BULACAN ROADS, SECTION KM.

    0030+00 TO KM. 004?+ @00

    LEGAL PROBLEMS, TO BE CONSIDERED IN THE PROPOSAL DESIGN OF

    THE HIGHWAY.

    E!"#$%&'( P)%*%$' R'-")(%*- D/!

    A- ///- 356 675 55 853/858 /35 65 9/;/ 6/;6/3.

    T&' S!"!' "*( 1!&') -12')*'*!"$ /*%! (1 *1! !"*( %* !&'

    ""%! 1 %*/)') 1 !&' "'! 1 !&' )1"(.

  • 8/12/2019 higway engineering

    14/23

    D/! % $%%!'( !1 !&"! 1 "%*!"%*%*- !&' )1"(5" !' %* "

    1*(%!%1* )'"1*"#$ "' 1) /#$% !)"2'$ # 1!1)%! 5&1

    ")' !&''$2' '6')%%*- 1)(%*") ")'.

    I* "* "!%1* "-"%*! !&' S!"!', 1) 1!&') -12')*'*!"$ '*!%!%',

    !1 )'12') 1) ('"!&, %*7/), 1) )1')! (""-' "/'( # "(''! $%*- %*, "$1*-, "#12' 1) "(7"'*! !1 !&' "2'( /)"'

    1) !&' &1/$(') 1) #') 1 !&' )1"(5", %! % *''") !1

    '!"#$%& !&"! !&' (''! 5" !&' )16%"!' "/' 1 !&'

    "%('*!, "*( " " *''") 1)1$$"), !&"! !&' '/'*!%"$

    &"%* 1 '2'*! $'"(%*- !1 !&' "%('*! 5" *1! #)19'* # "*

    ':%'*!, %*!')2'*%*-, 1) %*(''*('*! "/'.

    A " /)!&') 1*(%!%1* )''('*! !1 )'12') %! % *''") !1

    '!"#$%& !&"! !&' S!"!' 1) /#1)(%*"!' -12')*'*!"$ "-'* &"(

    '%!&') "!/"$ 1) 1*!)/!%2' *1!%' 1 !&' (''! "*( "! !&' "'

    !%' 5" "1)('( " )'"1*"#$' 11)!/*%! !1 !"9' )''(%"$ "!%1*5%!& )''! !&')'!1.

    R''*! C1/)! D'!')%*"!%1*. T6/ >==5@5 ==5 39/58 65

    35 @35 9 855@/5 5 5;53 9 65 = 9 65

    5 9 / >8/7//9. O5 75- /@=9 39/85/9 / 36

    />/9 8 =55 3> 9 39>3/75 9/35 9 398//9

    689> 9 65 @99/; =>/3. T

  • 8/12/2019 higway engineering

    15/23

    O/!%(' !&' R%-&!;1;W"

    I 6/ 35 65 39> 658 6 655 68 55 9 536 9 8>-. T65 555 7/5

    3/@. T65 39> >65 395858 6 65 39>- 98 / /58 -

    >@59> 55 8 965 75;5/9. K55=/; 98 / 595 5=/

    895 9 /3>85 8595/9 9 65 >9>8/; 39>-/85. T65 >5,

    65595, 5/575 65 S5 9 - 8>- 9 ;>8 ;/, - 5@97,

    /5, /;/;, 965/85 65 /;6?9?- 9 595 35 - 398>3/; 8/75?-

    /=53/9 - >/58 =595. I 8/558 398//9 / 958 -

    9575, 65 S5 6 65 8>- 9 5 5@58/ 3/9,

  • 8/12/2019 higway engineering

    16/23

    L89/58 9 55= 55 ;98- 535 9 @//@>@ 65/;6 9 / @55

    9 >36 965 ;55 65/;6 39/8558 ==9=/5 - C9>3/.

    A- 893/ 5,

    C9>3/

  • 8/12/2019 higway engineering

    17/23

    #. TYPE OF WEAKENED PLAIN !OINT TO BE USED SHALL BE AS SPECIFIED IN

    THE PLANS AND ONLY ONE TYPE SHALL BE USED FOR THE WHOLE PRO!ECT.

    $. MATERIAL FOR THE METAL SIDE FORM SHALL BE BRAND NEW SHEET

    METAL GAUGE NO. 1% OF BLACK IRON FREE FROM RUST AND KINKS.

    &. AT LEAST SI' ($ SUCCESSIVE DOWELED BUTT !OINTS AT NORMAL !OINT

    SPACING SHALL BE PROVIDED BEFORE OR AFTER AN E'PANSION !OINT.

    %. THE GROOVE OR CRACK ABOVE !OINTS (LONGITUDINAL OR TRANSVERSE

    SHALL BE SEALED WITH "0 #0 PENETRATION ASPHALT SEAL OR COLD

    APPLIED LI)UID RUBBER COMPOUND AFTER THE CONCRETE HAD BEEN

    CURED AND OPEN BEFORE OPENING THE PAVEMENT TO TRAFFIC.PENETRATION ASPHALT SEAL OR CONCRETE PAVEMENT SHOULD BE POURED

    ON SUCH MANNER THAT SPILLING WILL BE ELIMANATED * PREVENTED THUS,

    PROVIDE A SMOOTH LEVELING SURFACE.

    +. ALL TRANSVERSE !OINTS, E'CEPT CONSTRUCTION !OINT SHALL BE

    CONTINOUS FROM EDGE TO EDGE

    10. ALL LONGITUDINAL !OINTS SHALL MEET AT INTERSECTION WITH NO GAPSAND OFFSETS.

    11. PRIOR TO CONSTRUCTION CONDUCT BORING FOR VERIFICATION OF

    PAVEMENT THICKNESS (PCCP.

    12. VERIFY*CHECK STABILITY OF E'ISTING SUB GRADE AFTER REMOVAL OF

    DETERIORATED PAVEMENT, PRIOR TO ITS RECONSTRUCTION * REPLACEMENT.

  • 8/12/2019 higway engineering

    18/23

    B. PROFILING

  • 8/12/2019 higway engineering

    19/23

    C. CUT AND FILL

  • 8/12/2019 higway engineering

    20/23

    VII. DESIGN COMPUTATIONA. BO

  • 8/12/2019 higway engineering

    21/23

    B. ELEMENT OF CURVES

  • 8/12/2019 higway engineering

    22/23

    OUTLINE

    INTRODUCTION

    I. SCENARIO OF THE DESIGN

    II. PRO!ECT DESCRIPTION

    III. STATEMENT OF PROBLEM

    IV. SOURCE OF FUND

    V. LEGAL PROBLEM

    VI. DESIGN CRITERIA. G5 N95. P9/;

    3. C> 8 F/

    VII. DESIGN COMPUTATION. BO). E5@5 9 C>753. C> 8 F/

  • 8/12/2019 higway engineering