Document SLP502 Issue Date: Version 2.1 May 2015

Sustainable Energy Highway Lighting

acting for

Lighting for Staffordshire Limited

and

Highway Works Detail Drawings

P/2016/00474

Received 24.03.2016

Page 2: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail

Document SLP502 Issue Date: Version 2.1 May 2015

CONTENTS Section

12.52 Permanent Bollards Installation of Flexible Base Illuminated Types

12.53 Demountable central refuge sign and illuminated bollard arrangement

12.54 Zebra Crossing on Single “Two Way” Carriageway

Beacon and Lantern Installation Detail

12.55 Integration of centre island refuge with retention socket and access chamber

13.01 Installation of Sign Post. 5m Nominal Height, Steel Sign Post (Planted)

13.03 Installation of Lighting Columns. 6m Nominal Height, Steel Columns (Planted)

13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns

(Planted)

13.20 Detail for Build-out at street lighting column position on shared surface areas.

13.71 Notice for Road Lighting Columns

13.72 Warning Notice for Road Lighting Columns & Traffic Signs

14.01 Termination of Cables in Base Compartments Type L1

14.02 Termination of Cables in Base Compartments Type L2

14.03 Termination of Cables in Base Compartments Type L3

14.04 Termination of Cables in Base Compartments Type L4

14.05 Termination of Cables in Base Compartments Type L5

14.06 Termination of Cables in Base Compartments Type L6

14.15 Electrical Equipment & Wiring – Road Lighting Column

14.20 Arrangement of Electrical Equipment at Supply Interface for Extra Low

Voltage Highway Installations

14.40 Feeder Pillars Type A & D

14.43 Feeder Pillars Type C

14.46 Feeder Pillar Type B for over 6 outgoing circuits

14.47 Notices, Numbering & Lettering. Labelling Feeder Pillars

14.51 Underground Cables & Ducts

Note: Whilst every care has been taken in developing this guidance document E.ON, Lighting for Staffordshire and Staffordshire County Council accept no liability for any loss or damage arising directly or indirectly, in connection with reliance on its contents except to the extent that such liability may not lawfully be excluded. Any enquiries should be submitted in writing to E.ON Energy Solutions Limited, Staffordshire PFI, 234 Victoria Road, Fenton, Stoke on Trent. ST4 2JA.

Page 3: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 4: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 5: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 6: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 7: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 8: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 9: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 10: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 11: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 12: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 13: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 14: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 15: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 16: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 17: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 18: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 19: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 20: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 21: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 22: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 23: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 24: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail
Page 25: Highway Works Detail Drawings - East Staffordshire Application/623000/62… · 13.11 Installation of Lighting Columns. 8,10,12m Nominal Height, Steel Columns (Planted) 13.20 Detail