PROGRAMME NAME
HIGHLIGHT REPORT TEMPLATE
Project Title
Release Status: DRAFT, REVIEW, FOR INFORMATION or FINAL
Author: Insert Name
Date: 01 January 2016
Filename & Version: Insert details
Project ID: Insert ID
Methodology: PRINCE2™ 2009
FMD Consultants Limited assumes no responsibility for the usage of any information contained in this document and the way it is handled and disclaims all liability in respect of such information and its provision. Subject to this disclaimer, you may copy and utilise the material contained in the document.
This information is based on OGC PRINCE2™ material. PRINCE2™ is a registered trade mark of the Office of Government Commerce in the United Kingdom and other countries. All registered trademarks recognised & accepted.
1 Document History1.1 LocationThis document is stored in the following location:
Filename
Location
1.2 Revision HistoryThis document has been through the following revisions:
Version No.
Revision Date
Filename/Location stored:
Brief Summary of Changes
1.3 AuthorisationThis document requires the following approvals:
AUTHORISATION Name Signature Date
Project Manager
1.4 DistributionThis document has been distributed to:
Name Title Version Issued Date of Issue
1.5 Related Documents Summary of filenames and locations of related documents:
Document Type Filename/Location stored:
Project Mandate
Project Brief
Project ID: Doc Ref:
HIGHLIGHT REPORT TEMPLATE Page 2 of 7 Date of Issue:
2 Contents
1 DOCUMENT HISTORY..................................................................................................2
1.1 LOCATION....................................................................................................................21.2 REVISION HISTORY.........................................................................................................21.3 AUTHORISATION............................................................................................................21.4 DISTRIBUTION...............................................................................................................21.5 RELATED DOCUMENTS....................................................................................................2
2 CONTENTS..................................................................................................................3
3 DATE...........................................................................................................................4
4 REPORTING PERIOD....................................................................................................4
5 STATUS SUMMARY.....................................................................................................4
6 THIS REPORTING PERIOD............................................................................................4
7 NEXT REPORTING PERIOD...........................................................................................5
8 PROJECT AND STAGE TOLERANCE STATUS...................................................................5
9 REQUESTS FOR CHANGE..............................................................................................5
11 KEY ISSUES AND RISKS.............................................................................................6
12 LESSONS IDENTIFIED...............................................................................................6
13 SUPPORTING INFORMATION...................................................................................6
Project ID: Doc Ref:
HIGHLIGHT REPORT TEMPLATE Page 3 of 7 Date of Issue:
3 Date
4 Reporting Period
5 Status SummaryProject Status Last
Period
This Perio
d
Comments
Overall Project Status
R R
Time A ACost G GScope G GQuality G GBenefit G GRisk G G
Stage Status Last Period
This Perio
d
Comments
Overall Stage Status
G G
Time G GCost G GScope G GQuality G GBenefit G GRisk G G
6 This Reporting PeriodWork Package Name
Status Baseline Date
Forecast Date
Pending authorizationIn executionCompleted
Product Name Status Baseline Date
Forecast Date
Not startedIn developmentIn reviewApprovedHanded over
Project ID: Doc Ref:
HIGHLIGHT REPORT TEMPLATE Page 4 of 7 Date of Issue:
Summary of corrective action taken during the period
7 Next Reporting PeriodWork Package Name
Status Baseline Date
Forecast Date
Pending authorizationIn executionCompleted
Product Name Status Baseline Date
Forecast Date
Not startedIn developmentIn reviewApprovedHanded over
Summary of corrective action taken during the period
8 Project and Stage Tolerance StatusTolerance
Element
Actual Forecast Variance
Project TimeCostBenefitsScopeQualityRisks
Stage TimeCost
Project ID: Doc Ref:
HIGHLIGHT REPORT TEMPLATE Page 5 of 7 Date of Issue:
9 Requests for ChangeRef Description and update Status
RaisedApprovedRejectedPending
10
Project ID: Doc Ref:
HIGHLIGHT REPORT TEMPLATE Page 6 of 7 Date of Issue:
11 Key Issues and RisksRef Item Description and update
Problem or concernOff-specificationRiskRequest for Change
12 Lessons IdentifiedLesson Type
Lesson Detail Logged By
CorporateProgrammeProject
13 Supporting Information
Project ID: Doc Ref:
HIGHLIGHT REPORT TEMPLATE Page 7 of 7 Date of Issue: