High-Speed Transportation Opportunities Greater Dallas Planning Council September 12, 2019 Kevin Feldt North Central Texas Council of Governments

High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

  • Upload
    others

  • View
    20

  • Download
    0

Embed Size (px)

Citation preview

Page 1: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

1

High-SpeedTransportation Opportunities

Greater Dallas Planning Council

September 12, 2019

Kevin Feldt

North Central Texas Council of Governments

Page 2: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

2

High Speed RailHigh-Speed Rail Recommendations

Page 3: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

3

High Speed RailDFW High-Speed Rail Projects

Fort Worth to Laredo High-Speed Transportation Study

NCTCOG

Dallas to HoustonHigh-Speed Rail ProjectTexas Central Railway (TCR)

DFW High-SpeedTransportation Connection Study

NCTCOG

Page 4: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

4 February 11, 2018

We Are Here

Page 5: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

5

Dallas to Houston

Dallas

Houston

Bryan/College Station/Huntsville

FRA Preferred Alignment

Potential Stations

Page 6: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

6

Current TCR Activity Highlights

•Building the Project Every Day

•Working with Design/Build Partner

• Preparing for Construction Activity

• Petition for Rulemaking Granted by FRA• Rule of Particular Applicability

• Final Rule Expected in 2020

• Environmental Impact Statement• Record of Decision Expected 1Q 2020

Source: Texas Central Railway

Page 7: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

7

Other Activities

•Perkins + Will Study for Dallas

• Lot E Feasibility

• No Fatal Flaw

Source: Lockwood, Andrews and Newnam

Page 8: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

8

Dallas Station

Source: Texas Central Railway

Lot E

Page 9: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

9

Fort Worth to Laredo

Page 10: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

10

Fort Worth to Laredo

• Generally Parallels IH 35• Fort Worth

• Waco

• Temple

• Killeen

• Austin

• San Antonio

• Laredo*

• Investigate High-Speed Transportation (HST) Options• Corridors• Technology• Modes of Travel

*In Laredo, the end point/station location will be studied as to not

preclude extending an alignment to Monterrey, Mexico

Page 11: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

11

Project Background

2017

Previous StudyTOPRS ROD and FEIS

Tier 1 NEPA Study

Future

Future StudyFurther Corridor

EvaluationTier 2 NEPA Study

2019 2020

Current StudyBridge – Previous to Future

Page 12: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

12

Project Purpose

Fort Worth

Waco

Austin

San Antonio

Laredo

Killeen-Temple

• “Bridge” to Tier 2 Environmental Study

• Investigate High-Speed Transportation (HST) Options• Corridors

• Technology

• Modes of Travel

Page 13: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

13

TOPRS Tier 1 Corridor Analysis

Page 14: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

14

Technologies/Modes Analyzed

MaglevHigh-Speed &Higher-Speed Trains

Hyperloop

Guaranteed TransitRegional Rail

Page 15: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

15

City Pairs Analyzed

Fort Worth Laredo

Study Corridor

Fort Worth – Laredo: All Stops

Fort Worth – Austin – San Antonio – Laredo

Fort Worth – Austin – Laredo

Fort Worth – Laredo

Fort Worth Waco Killeen-Temple Austin San Antonio

Laredo

Fort Worth Waco Killeen-Temple Austin San Antonio

Laredo

Fort Worth Austin San Antonio

Laredo

Fort Worth Austin Laredo

Page 16: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

16

Project Schedule

March April May June July August

September October November December JanuaryAugust

Review Technology & Design Criteria

Review Previous StudiesCorridor Development

Corridor Development Final Report

Stakeholder Coordination

Page 17: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

17

Fort Worth to Dallas

Page 18: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

18

Fort Worth to Dallas High-SpeedTransportation Study• Previous Efforts

• TxDOT• DFW Core Express Service

• NCTCOG• Station Area Studies• Corridor Analysis

• New Project Next Steps• Complete Agreements with FRA and FTA• Complete Scope of Work• Publish RFP – October?• Hire Consultant• Notice to Proceed – February?

Source: Hua Yang

Page 19: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

19

DFW Core Express Service Alternatives Analysis

Downtown Dallas

Downtown Fort Worth

Arlington

Grand Prairie

Irving

19

Page 20: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

20

Potential Arlington Station and Alignment Options

Page 21: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

21

Potential Fort Worth Station and Alignment Options

Page 22: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

22

Alignment Corridors Analyzed by NCTCOG

22

Proposed Texas Central HSRAlignment Corridors Analyzed

Page 23: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

23

New Project Scope of Work

• Public & Agency Involvement

• Alternative Development

• Alternative Screening

• Conceptual Engineering

Phase 1 – Alternative Development

• NEPA Documentation & Record of Decision

• Preliminary Engineering

• Financial & Project Management Plans

Phase 2 – Engineering & Environmental

Includes a technology forum

Includes alignments & technology

Pre

-NEP

AN

EPA

Page 24: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

24

Technology

Source: AECOM

Source: AECOM

Page 25: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

25

Two Primary Technologies

Characteristic High-Speed Rail Hyperloop

Top Speed ~220 mph ~700 mph

Headway 30 minutes 2 minutes

Station Spacing 250 miles 250 miles

Person Capacity 2,400/hour/direction1 16,000/hour/direction2

Operation Scheduled Service On Demand

Access Multiple Stops Point to Point

Cost ~$60m/mile ???

Freight No Yes

Notes: 1 Estimate based on NCTCOG calculations combining stated headway and train set capacity from TCR2 Estimate from Virgin Hyperloop One

Page 26: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

26

What is Hyperloop?

•New Mode of Transportation• Moving Passengers and Freight

• Near-Vacuum Tube

• Electric Propulsion

•Autonomous Pod Levitates Above the Track

•Glides Over Long Distances

Passenger pod

Cargo pod

Source: Virgin Hyperloop One

Page 27: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

27

Virgin Hyperloop One (VHO)

•VHO One of Several Firms

• Several Meetings With Staff

•Hyperloop On The Hill Event

•Nevada Test Track

•Passenger Pod Tour

•Certification Center• Research and Development

Source: Kevin Feldt

Page 28: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

28

Nevada Test Track

Source: Kevin Feldt

Page 29: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

29

Passenger Pod Tour

Source: Kevin Feldt

Source: NCTCOG

Page 30: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

30

VHO Certification Center Phasing and Timing

Phase Timing Length of Track

A 18 months1.5 km (straight)

(0.9 mi)

B 9 months3 to 5 km

(1.9 to 3.1 mi)

C 9 Months 0

D 9 Months6 to 8 km

(3.7 to 5.0 mi)

Page 31: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

31

Hyperloop Design Parameters

✓Need For Service/Access Road Along The Guideway

✓Vacuum Buildings Every 5 Miles

X Design Elements

X Maximum Vertical Grade

X Minimum Horizontal Curve

Page 32: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

32

747 In-flight Turn Radius

Calculate the radius of the turn using this formula, slightly

modified from Wikipedia to give nmi instead of feet:

Which gives us:

So the turn itself would be about 15 nautical miles wide(≈ 91,000 feet) not accounting for wind.

Source: Wikipedia

Radius of turn in nautical miles = velocity2

68579 x tan(bank)

7.51 nmi = 4902

68579 x tan(25°)

Page 33: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

33

Typical Section DRAFT

* Horizontal and vertical clearances allow for the area needed to construct, operate and maintain the guideway and supporting facilities.** Minimum vertical clearance over roadways is 5 m or 16.5 ft. Vertical clearance of 5.6 m or 18.5 ft would be required over interstate highways and other roadway corridors designated for freight. Vertical clearance over passenger or freight railroads would be 7 m or 23 ft.

5 m16.4 ft

Tube

4 m13.1 ft

4 m13.1 ft

13 m42.7 ft

4 m13.1 ft

Vertical Clearance*

5 m16.4 ft

Tube

10 to 10.6 m32.9 to 34.9 ft

Vertical Clearance

Over Roadway**5 to 5.6 m

16.5 to 18.5 ft

Horizontal Clearance*

Horizontal Clearance*

Page 34: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

34

Typical Section DRAFT

* Horizontal and vertical clearances allow for the area needed to construct, operate and maintain the guideway and supporting facilities.** Minimum vertical clearance over roadways is 5 m or 16.5 ft. Vertical clearance of 5.6 m or 18.5 ft would be required over interstate highways and other roadway corridors designated for freight. Vertical clearance over passenger or freight railroads would be 7 m or 23 ft.

5 m16.4 ft

Tube 4 m

13.1 ft4 m

13.1 ft

Horizontal Clearance*

19 m62.3 ft

4 m13.1 ft

Vertical Clearance*

5 m16.4 ft

Tube

9 m29.5 ft

Horizontal Clearance*

5 m16.4 ft

Tube

1 m3.3 ft

Vertical Clearance

Over Roadway**5 to 5.6 m

16.5 to 18.5 ft

Page 35: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

35

Typical Section DRAFT* Horizontal and vertical clearances allow for the area needed to construct, operate and maintain the guideway and supporting facilities.** Minimum vertical clearance over roadways is 5 m or 16.5 ft. Vertical clearance of 5.6 m or 18.5 ft would be required over interstate highways and other roadway corridors designated for freight. Vertical clearance over passenger or freight railroads would be 7 m or 23 ft.

5 m16.4 ft

Tube

4 m13.1 ft

4 m13.1 ft

26.5 m = 87 ft

4 m13.1 ft

Vertical Clearance*

5 m16.4 ft

Tube

10 to 10.6 m32.9 to 34.9 ft

Vertical Clearance

Over Roadway**5 to 5.6 m

16.5 to 18.5 ft

Horizontal Clearance*

Horizontal Clearance*

8.5 m28 ft

AV/Roadway

5 m16.4 ft

Tube

Page 36: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

36

Potential Certification Track Alignments

Page 37: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

37

Certification Center• Working with Dallas Regional Chamber• Anticipate RFP Published in November

• Will be Interactive (No “Cone of Silence”)• Three Focus Areas

• Land • Regulatory• Funding

• Involvement • Universities• Trade Groups• Transportation Industry

• Planners• Engineers• Contractors

• Finance and Funding Key Components

Page 38: High-Speed Transportation Opportunities - GDPC · •Final Rule Expected in 2020 ... Hyperloop Regional Rail Guaranteed Transit. 15 City Pairs Analyzed Fort Worth Laredo ... Typical

38

Contact

Kevin FeldtProgram [email protected]