SIAFI Europe, Paris, September 30th, 2008 1
SeptemberSeptember 3030thth, 2008, 2008
CHO, CHO, HyunHyun--AhAh
High Speed Railway in KOREA High Speed Railway in KOREA High Speed Railway in KOREA High Speed Railway in KOREA High Speed Railway in KOREA High Speed Railway in KOREA High Speed Railway in KOREA High Speed Railway in KOREA
SIAFI EUROPE 2008 (2ND SESSION)
SIAFI Europe, Paris, September 30th, 2008 2
ContentsContents
�� Current Status of KTX Current Status of KTX
�� Features of KTXFeatures of KTX
�� Performance of KTXPerformance of KTX
�� Features of KTX IIFeatures of KTX II
�� Expansion & DevelopmentExpansion & Development
SIAFI Europe, Paris, September 30th, 2008 3
Gyeongju
DaejonDaejonjochajang
OkchunDongdaegu
Shindong
Busan
SeoulSiheung
GoyangDeport
Iksan
SeoDaejon
Gwangju
Mokpo
KwangMyung
Sonjungri
CheonanAsan
GyeongbuLine
HonamLine
Mokpo
2 2 2 2
Current Status of KTX Current Status of KTX
�� Total Length : 683 km Total Length : 683 km �� Newly Constructed High Speed Line Newly Constructed High Speed Line
: 232 km (34%): 232 km (34%)�� Conventional Line : 450.8km (66%)Conventional Line : 450.8km (66%)
May 1989 Gyeongbu HSR ConstructionProceeding Policy confirmed
Dec.1992 Construction Started
April 2004 KTX Launching
Conventional Line Conventional Line Conventional Line Conventional Line Newly Constructed Line Newly Constructed Line Newly Constructed Line Newly Constructed Line To be Constructed To be Constructed To be Constructed To be Constructed at the 2at the 2at the 2at the 2ndndndnd StageStageStageStage
3
SIAFI Europe, Paris, September 30th, 2008 4
Gyeongju
DaejonDaejonjochajang
OkchunDongdaegu
Shindong
BusanBusanBusanBusan
SeoulSeoulSeoulSeoulSiheung
GoyangDeport
Iksan
SeoDaejon
Gwangju
Mokpo
KwangMyung
Sonjungri
CheonanAsan
KTX realized a KTX realized a ““ Half Day Life ZoneHalf Day Life Zone ””
Seoul-Gwangju
Seoul-Mokpo
Seoul-Busan
Seoul-Dongdaegu
Section
2:40
2:58
2:40
1:38
After KTX
3:53
4:32
4:10
3:03
Before KTX
1:13
1:29
1:30
1:25
Savings
200km 200km
In 1 Hour In 1 Hour (hh:mm)
�� SeoulSeoulSeoulSeoulSeoulSeoulSeoulSeoul--------CheonanAsan(96.0km) : 34minCheonanAsan(96.0km) : 34minCheonanAsan(96.0km) : 34minCheonanAsan(96.0km) : 34minCheonanAsan(96.0km) : 34minCheonanAsan(96.0km) : 34minCheonanAsan(96.0km) : 34minCheonanAsan(96.0km) : 34min
�� SeoulSeoulSeoulSeoulSeoulSeoulSeoulSeoul--------Daejeon(159.8km) : 49minDaejeon(159.8km) : 49minDaejeon(159.8km) : 49minDaejeon(159.8km) : 49minDaejeon(159.8km) : 49minDaejeon(159.8km) : 49minDaejeon(159.8km) : 49minDaejeon(159.8km) : 49min
Expansion of Commuter BeltExpansion of Commuter BeltExpansion of Commuter BeltExpansion of Commuter Belt
450km450km
In 3 hourIn 3 hour
SIAFI Europe, Paris, September 30th, 2008 5
Features of Features of
6 min 6 sec6 min 6 sec6 min 6 sec6 min 6 sec6 min 6 sec6 min 6 sec6 min 6 sec6 min 6 sec
300 km/h300 km/h300 km/h300 km/h300 km/h300 km/h300 km/h300 km/h
13500 13500 13500 13500 13500 13500 13500 13500 kwkwkwkwkwkwkwkw
20 cars/ 388 m20 cars/ 388 m20 cars/ 388 m20 cars/ 388 m20 cars/ 388 m20 cars/ 388 m20 cars/ 388 m20 cars/ 388 m
KKKKKKKK--------TGVTGVTGVTGVTGVTGVTGVTGV
�� KTX Technical FeaturesKTX Technical Features
�� 46 train sets(12 train sets from France & 34 train sets in Korea46 train sets(12 train sets from France & 34 train sets in Korea))
�� 935 (127 in the first class, 808 in the second class)935 (127 in the first class, 808 in the second class)
�� Braking distance in 300km/h: 6,600m (2 min and 40 sec) for Braking distance in 300km/h: 6,600m (2 min and 40 sec) for
normal braking 3,300m (1 min and 20 sec) for emergency brakingnormal braking 3,300m (1 min and 20 sec) for emergency braking
�� Braking system: 3 way braking system (regenerative, Braking system: 3 way braking system (regenerative, rheostaticrheostatic
and pneumatic braking)and pneumatic braking)
SIAFI Europe, Paris, September 30th, 2008 6
Passenger Growth by YearPassenger Growth by Year
19,88219,88219,88219,882
32,37032,37032,37032,37036,49036,49036,49036,490 37,31537,31537,31537,315
0000
5,0005,0005,0005,000
10,00010,00010,00010,000
15,00015,00015,00015,000
20,00020,00020,00020,000
25,00025,00025,00025,000
30,00030,00030,00030,000
35,00035,00035,00035,000
40,00040,00040,00040,000
2004200420042004 2005200520052005 2006200620062006 2007200720072007
2004
2005
2006
2007
(unit:1mil, people) (unit:1mil, people)
Average Average annual growthannual growth
25.8%25.8%
SIAFI Europe, Paris, September 30th, 2008 74yrs
2wks
1
1months
3months
5months
9months
1yr 14months
17months
20 months
2 yrs 26 months
2 710
20
27
30
40
50
60
70
100
(unit : million)
1st yr
2121stst MM
� Apr. 14, 2004 1 mil / after 14 days
� Jan. 2, 2005 20 mil / after 9 months
� Sep. 7, 2005 40 mil / after 17 months
� Dec. 10, 2005 50 mil / after 20 months
� Jul. 1, 2006 70 mil / after 27 months
� Oct. 10, 2006 80 mil / after 30 months
� Jan. 13, 2007 90 mil / after 33 months
� Apr. 21, 2007 100 mil
� Aug. 20, 2008 150mil
150 millions after 4Y 4M150 millions after 4Y 4M
From the inaugurationFrom the inauguration
KTX Passenger Transportation Trend
150
Aug. 2008
7
SIAFI Europe, Paris, September 30th, 2008 8
Before KTX After KTX
82,04682,046
102,650102,650
MugunghwaMugunghwa
67,50967,509
(82.28%)(82.28%)
SaemaeulSaemaeul
14,537 (17.71%)14,537 (17.71%)
MugunghwaMugunghwa
55,32055,320
(53.89%)(53.89%)
SaemaeulSaemaeul
10,015 (9.75%)10,015 (9.75%)
KTXKTX
37,31537,315
(36.35%)(36.35%)
�� KTX induced 25.12% increment in transportationKTX induced 25.12% increment in transportation
Annual Passenger Traffic VolumeAnnual Passenger Traffic Volume
+ 25.12%+ 25.12%(thousand of passengers)
2007 Year2007 Year2003 Year2003 Year
SIAFI Europe, Paris, September 30th, 2008 9
Annual RevenueAnnual Revenue
580,264580,264580,264580,264
884,885884,885884,885884,885
986,184986,184986,184986,1841,071,1271,071,1271,071,1271,071,127
0000
200,000200,000200,000200,000
400,000400,000400,000400,000
600,000600,000600,000600,000
800,000800,000800,000800,000
1,000,0001,000,0001,000,0001,000,000
1,200,0001,200,0001,200,0001,200,000
2004200420042004 2005200520052005 2006200620062006 2007200720072007
2004
2005
2006
2007
(unit: mil, KRW) (unit: mil, KRW)
Average Average annual growthannual growth
23.9%23.9%
SIAFI Europe, Paris, September 30th, 2008 10
MugunghwaMugunghwa520,031520,031
(63.89%)(63.89%)
SaemaeulSaemaeul293,945293,945
(36.12%)(36.12%)
MugunghwaMugunghwa
339,851339,851(21.76%)(21.76%)
SaemaeulSaemaeul150,807 150,807 (9.66%)(9.66%)
KTXKTX
1,071,1271,071,127(68.59%)(68.59%)
+91.88%
813,976813,976
1,561,7851,561,785
(Unit: Mil, KRW)
New Main Revenue Source, KTXNew Main Revenue Source, KTXKTX KTX KTX KTX KTX KTX KTX KTX Induced 112.3% Increment of RevenueInduced 112.3% Increment of Revenue
Before Before KTXKTX
After After KTXKTX
2003 Year2003 Year 2007 Year2007 Year
SIAFI Europe, Paris, September 30th, 2008 11
Shift of Passengers between Transport Modals Shift of Passengers between Transport Modals after KTX Inaugurationafter KTX Inauguration
►►►► Distance: Seoul –Busan(408.5km), Seoul-Daegu(293.1km)
SIAFI Europe, Paris, September 30th, 2008 12
SafetySafety
�� Efforts to reduce the number of accidents Efforts to reduce the number of accidents ––
�� Established realEstablished real--time monitoring system for KTXtime monitoring system for KTX
�� KTXKTX--OIS program has been updated and tested OIS program has been updated and tested
(May 2006 ~ May 2007)(May 2006 ~ May 2007)
�� Applied the test for KTX(46 train sets)Applied the test for KTX(46 train sets)
�� Rapid response to any defect through realRapid response to any defect through real--time monitoring time monitoring
system system --�������� It sharply reduced the troubles and accidentsIt sharply reduced the troubles and accidents
0.255 case0.248 case0.276 caseDriving accidents
Efforts to reduce
Accidents
(case/mil km)1.096 prs1.007 prs1.119 prsPersonal
accidents
ResultsGoal
20072006
Results
SIAFI Europe, Paris, September 30th, 2008 13
Punctuality RatePunctuality Rate
87.687.687.687.6
93.793.793.793.7
91.691.691.691.6
94.194.194.194.1
84848484 86868686 88888888 90909090 92929292 94949494 96969696
2004200420042004
2005200520052005
2006200620062006
2007200720072007
2007200720072007
2006200620062006
2005200520052005
2004200420042004
Unit: %Unit: %
�� Punctuality of KTXPunctuality of KTX
-- Under 5minutes than arrival time at terminal stationUnder 5minutes than arrival time at terminal station
�� Punctuality ratio(%) Punctuality ratio(%)
= (The number of punctual trains/ Total number of trains) * 1= (The number of punctual trains/ Total number of trains) * 10000
SIAFI Europe, Paris, September 30th, 2008 14
KTX Marketing StrategiesKTX Marketing StrategiesKTX-centered diagram
and operation of extra trainMarketing research
for customer-oriented strategy
Introduction of YMSto maximize earnings
Product development and co-marketing for increase the demand
Flexible fare system based on route, date, time, etc.
SIAFI Europe, Paris, September 30th, 2008 15
Enhancing Ticketing ServiceEnhancing Ticketing Service
14.16%14.16%14.16%14.16% 1.86%1.86%1.86%1.86%
84%84%84%84%
0.28%0.28%0.28%0.28%
Ticket counter
ATM
Home-ticket, e-ticket
etc.
SIAFI Europe, Paris, September 30th, 2008 16
Enhancing Ticketing ServiceEnhancing Ticketing Service
� SMS ticket
� Home ticket
BookingBooking
BookingBooking Home ticketingHome ticketingPaymentPayment BoardingBoarding
SIAFI Europe, Paris, September 30th, 2008 17
KTX Cinema & InternetKTX Cinema & Internet
�� KTX Cinema is the new KTX Cinema is the new
railway culture for railway railway culture for railway
customers who travel customers who travel
longlong--distance.distance.
�� Able to use the Internet Able to use the Internet
service in running KTXservice in running KTX
SIAFI Europe, Paris, September 30th, 2008 18
Daily Passengers using Daily Passengers using KwangmyungKwangmyung Station Station Increased by 3 times Increased by 3 times �������� lack of parking spacelack of parking space
KORAILKORAIL ’’ss Continuous Efforts for CSContinuous Efforts for CS
3 Stories Parking Tower
with the capacity of 2,064 cars
Additional parking tower has been constructedAdditional parking tower has been constructed
SIAFI Europe, Paris, September 30th, 2008 19
Features of Features of
5 min 16 sec5 min 16 sec
300 km/h300 km/h
17600 17600 kwkw
10 cars/ 201m10 cars/ 201m
Deluxe Korean ModelDeluxe Korean Model
�� KTX II Technical FeaturesKTX II Technical Features
�� Car capabilities: 10Car capabilities: 10--20 units, engine room remote control 20 units, engine room remote control
worldworld’’s a first aluminum car bogies for lightweight operation s a first aluminum car bogies for lightweight operation
�� Aerodynamic designAerodynamic design
�� Simplified power & control systemSimplified power & control system
�� Small, lightweight locomotive systemSmall, lightweight locomotive system
�� Train analysis control with improved speedTrain analysis control with improved speed
�� Reduced funnel noiseReduced funnel noise
II
SIAFI Europe, Paris, September 30th, 2008 20
Gyeongju
Daejeon
Dongdaegu
Busan
Seoul
Siheung
Iksan
SeoDaejon
Gwangju
Mokpo
KwangMyung
Sonjungri
CheonanAsan
� To expand High speed railway service to : 2010 : Jeolla Line
� To complete the Phase 2 Construction of Gyeongbu hig h speed railway project by 2010
� To construct dedicated high speed railway for Honam line : 2017(Seoul – Mokpo 2:58 ���� 1:49 )
(Seoul – Busan 2:40 ���� 1:58 )
Conventional Line
Newly Constructed Line in 2004
To be constructed at the 2nd stage
Honam Line
Jeolla Line
KTX is Planning to Expand its Network
Okchun
Ohsong
Sooncheon
Daejonjochajang