27
Innovation Driven, Service Led, Solutions Based. High Speed FTTx Deployment Minimising Cost & Disruption Maximising Effectiveness Mike Harper

High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

  • Upload
    others

  • View
    3

  • Download
    2

Embed Size (px)

Citation preview

Page 1: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   

   Innovation Driven, Service Led, Solutions Based.

High Speed FTTx Deployment

Minimising Cost & Disruption

Maximising Effectiveness

 

Mike  Harper  

Page 2: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-­‐trenching  for  FTTx    

Who  are  S7rling  Lloyd?  •  UK  &  US  Based  Materials  Manufacturer  

•  Infrastructure  Specialists  (40  years)  

•  7  years  in  micro-­‐trenching  for  fibre  

deployment  

We’re  “in  Highways”.    In  the  UK  we  work  with    

•  Local  AuthoriMes  (ADEPT)  

•  Highways  England  

•  HAUC  

Page 3: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Cracked  /  Fre?ed  Joint  

Micro-trenching for FTTx  

2013  

2015  

Page 4: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

Great  Progress  …….  right?    •  IniMal  target  90%  properMes  at    

           100  Mbps  by  end  2015  

•  Current  target  95%  of  properMes  at  

           24  Mbps  (or  beXer)  by  end  2017  

 

•  Current  posiMon  at  August  2015    

           =  83%  of  properMes  done    to  date  

           (source:  DCMS  &  Telecoms.com)  

 

 

Page 5: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

So  now  what?  How  do  we    complete  the  last  12%    

 

Page 6: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

So  now  what?  How  do  we    complete  the  last  12%    •  There  are  23  million  premises    

           approx.  in  the  UK  

 

Page 7: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

So  now  what?  How  do  we    complete  the  last  12%    •  There  are  23  million  premises    

           approx.  in  the  UK  

•  To  reach  the  95%  target    we  have    

           2.85  million  properMes  remaining  

 

Page 8: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

So  now  what?  How  do  we    complete  the  last  12%    •  There  are  23  million  premises    

           approx.  in  the  UK  

•  To  reach  95%  we  have  2.85  million  

           remaining  

•  The  UK  average  is  9  to  11  linear    

           metres  per  property  

 

Page 9: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

So  now  what?  How  do  we    complete  the  last  12%    That  means  we  have  17,700  miles  of    

fibre  to  install  in  the  next  24  months…..    

 

….  and  we’ve  done  all  the  easy  stuff!  

Page 10: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

That’s  the  same  as  ……    John  O  Groats  to  Lands  End  ……    

Page 11: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

That’s  the  same  as  ……    John  O  Groats  to  Lands  End  ……    

20  7mes!!!    

Page 12: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

That’s  the  same  as  ……    John  O  Groats  to  Lands  End  ……    

20  7mes!!!    We  can  do  that,  right….?    

Page 13: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

Oh,  and  that  could  cost  £1  billion!    And  take  many  years  if  we  do  it  like  this  (i.e.  by  “tradi7onal  dig”)    

Page 14: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

What’s  the  alterna7ve?      

Page 15: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

 Introducing  …    Micro-­‐trenching      

Page 16: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

Process  train  

What  is  Micro-­‐trenching?  •  Cucng  just  enough  –  and  no  

more  

•  Systemising  the  process  

•  UMlising  new  techniques  and  materials  

•  Installing  at  a  shallower  depth  

•  Doing  less  damage  to  highway  assets  

Page 17: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

What  can  micro-­‐trenching  offer?  Superfast  deployment    

•  Greater  Output  (typically  6x  faster  than  tradiMonal  dig)  

•  Up  to  600m  (2000  j.)  per  day    

•  Less  disrupMon  to  the  public  

•  Less  traffic  congesMon  

 Shetland,  UK  (2010)  

Page 18: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Why  micro-­‐trench?  Lower  Environmental  Impact  

•  Significantly  less  waste  created  to  be  disposed  of  

•  Less  new  materials  imported  

•  Fewer  truck  movements    

•  Less  traffic  congesMon    

All  this  means  lower  CO2  

 

Micro-trenching for FTTx  

Las  Vegas,  Nevada,  US  (2015)  

Page 19: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Why  micro-­‐trench?  Lower  cost  

•  Lower  first  cost  –  typically  1/3  of  tradiMonal  dig  

•  Lower  long  term  maintenance  costs  -­‐  no  secondary  compacMon  /  sunken  trenches  

•  Less  damage  to  the  highway  /  footway  asset  

•  Less  mess  outside  your  potenMal  customers  house!  

Micro-trenching for FTTx  

Galway,  Ireland  (2012)  

Page 20: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

Process  train  

Reinstatement  •  Process  train  approach  moves  

conMnuously  along  the  road  

•  All  the  processes  are  in  this  image  

•  Rapid  cure  of  the  reinstatement  means  minimal  traffic  management  behind  the  works  

•  600  lm  (2000  j.)  per  day  complete  installaMon  

Page 21: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Overcoming  Objec7ons….    

York  Phase  1,  UK  (2014)  

Micro-trenching for FTTx  

Page 22: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

New  UK  Guidance    •  Published  in  2014  

•  Detailed  coverage  on  what  is  required  for  successful  micro  trenching  

 •  Published  as  a  supplement  to  the  

SpecificaMon  for  the  Reinstatement  of  Openings  in  Highways  

 

York  Phase  1,  UK  (2014)  

Micro-trenching for FTTx  

Page 23: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

York  Phase  1,  UK  (2014)  

Micro-trenching for FTTx  

Page 24: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Cores taken in Oklahoma, US (2014)

Micro-trenching for FTTx  

Core  samples…  •  Samples  taken  

approximately  60  minutes  ajer  install  

•  Full  bonded  

•  No  cracking  

Page 25: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Minnesota, US (2015)

Micro-trenching for FTTx  

Safetrack    micro-­‐trench    installa7ons…  Shetland  Islands,  UK  (2010)  

York  –  Phase  1,  UK  (2014)  

York  -­‐  Phase  2  (2015)  

Galway,  Ireland  (2012)  

Le  Zion,  Israel  (2014)  

Toronto,  Canada  (2014)  

South  Africa  (2014)  

Sea?le,  US  (2015)  

Minnesota,  US  (2015)  

Las  Vegas    -­‐  US  (2015)  

 

York,UK  (2014)   Seattle, US (2015)

Page 26: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

Tradi7onal  dig  

The  alterna7ve…  •  TradiMonal  trench  dig  would  be  up  to  6  x  slower  

•  Would  create  much  more  disrupMon  for  residents  and  road  users  

•  Uses  far  more  material  and  creates  much  more  waste  

•  Far  higher  carbon  footprint  

•  Much  greater  damage  to  the  road  or  pavement  asset  and  likely  requirements  for  more  long  term  maintenance  liability  (secondary  compacMon  etc.)  

•  Costs  3x  as  much!  

Page 27: High Speed FTTx Deployment - NextGen Events 2015/Stirling Lloyd...Innovation Driven, Service Led, Solutions Based. Micro-trenching for FTTx ! Sonowwhat?Howdowe!! complete!the!last!12%!

   Innovation Driven, Service Led, Solutions Based.

Micro-trenching for FTTx  

Final  thoughts…  •  Just  because  we  have  always  done  it  that  way…..    •  The  scale  of  the  task  –  we  need  innovaMve  techniques    •  New  techniques  require  suitable  materials  

 Thank  you  e  -­‐  [email protected]  t  -­‐  +44  (0)  7976  517200