Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
High School Capacity Presentation For the Facilities Master Plan Task Force Meeting #5 on Aug. 13
Seattle Public Schools is committed to making its online information accessible and usable to all
people, regardless of ability or technology. Meeting web accessibility guidelines and standards is
an ongoing process that we are consistently working to improve.
While Seattle Public Schools endeavors to only post documents optimized for accessibility, due
to the nature and complexity of some documents, an accessible version of the document may
not be available. In these limited circumstances, the District will provide equally effective
alternate access.
For questions and more information about this document, please contact the following:
Rebecca Asencio
K-12 Planning Coordinator
This is a presentation intended for the use of the task force. It walks the task force through data points
on whether there is a need for an additional high school in Seattle Public Schools. It has background
information and a number of tables with data on high school enrollment by region.
Facilities Master Plan Task Force Meeting #5 High School Capacity Analysis
August 13, 2018
Photos by Susie Fitzhugh
Does SPS Need a 12th HighSchool?
2
Does SPS Need a 12th HighSchool?
Background
• Need for an additional high school identified during BEV IV planning
• Recent (2017) ten year 9-12 Student Resident Projections continue to show a capacity shortfall in Central/North part of the city
• Recent (2017) ten year 9-12 Student Resident Projections continue to show sufficient 9-12 capacity in the Southeast and Southwest part of the city
• Capital Planning trend analysis of enrollment data (actual and projections) also indicates a capacity shortfall in the north part of the district, and sufficient capacity in the south.
• Existing high school sites in the central and north part of the district are at or over capacity with limited space for additions
3
Does SPS Need a 12th HighSchool? Southeast and Southwest
4
School Right Oct. 2017 2018 2021-22 2026 Trend Additional Total Size Enrollment Portables Enrollment Analysis Classrooms Classrooms
Capacity Projection Surplus/Short Needed needed above Surplus/Short fall 2021; 2026 Right-Size: fall 2021; 2026
Cleveland 965 849 0 113 88 0; 0 0; 0
Franklin 1391 1284 0 100 226 0; 0 0; 0
Rainier 1088 721 2 419 210 0; 0 0; 0 Beach
SE Region 3444 2854 2 632 524 0; 0 2; 0 Subtotal
Chief 1289 1015 0 -2 209 0; 0 0; 0 Sealth Int’l
West 1215 970 0 -4 5 0; 0 0; 0 Seattle
SW Region 2504 1985 0 -6 214 0; 0 0; 0 Subtotal
Does SPS Need a 12th HighSchool? Central
5
School Right Oct. 2017 2018 2021-22 2026 Trend Additional Total Size Enrollment Portables Enrollment Analysis Classrooms Classrooms
Capacity Projection Surplus/Short Needed needed Surplus/Short fall 2021; 2026 above Right-fall Size: 2021;
2026
Garfield 1594 1774 1 -19 -187 0; 6 1; 7
Center 300 229 0 61 114 0; 0 0; 0
Central 1894 2003 1 42 -73 0; 6 1; 7 Region
Subtotal
Does SPS Need a 12th HighSchool? Northeast and Northwest
6
School Right Size Capacity
Oct. 2017 Enrollment
2018 Portables
2021-22 Enrollment Projection
Surplus/Shortfall
2026 Trend Analysis
Surplus/Short fall
Additional Classrooms
Needed 2021; 2026
Total Classrooms
needed above Right-Size:
2021; 2026
Ballard 1606 1882 8 -136 -415 5; 14 13; 22
Ingraham (with addition)
1696 1342 6 -22 -331 0; 11 6; 17
Lincoln (Opens
2019)
1600 0 0 0 No data available to
trend
0; Not available
0; Not available
NW Region Subtotal
3302 3224 14 -158 -746 5; 25 19; 39
Nathan Hale
1096 1189 4 -160 -195 5; 7 9; 11
Roosevelt 1719 1840 6 110 -45 0; 1 6; 7
NE Region Subtotal
2815 3029 10 -50 -240 5; 8 15; 18
Does SPS Need a 12th HighSchool? Options to Address Projected 9-12 Capacity Shortfall in Central and North Seattle
7
Solution Pros Cons
Utilize Portable Classrooms at • Flexible – can add where needed (if • Student population exceeds educational Existing High Schools space available). specifications.
• Can remove at future dates when • Limited program offerings – general additional space no longer required. education classroom.
• Cost effective. • Staff and students isolated from • Nimble. broader school community.
• Safety concerns. • Security concerns. • Impacts parking and lot coverage. • Greater impact on neighborhood.
Construct Additions to Existing • Meets future capacity needs. • Student population exceeds educational High Schools • Potentially costs less than new specifications.
construction. • Student population exceeds core • Operationally more efficient. facilities. Administration, cafeteria,
commons and gym may not be sufficient for added enrollment.
• Impacts parking and lot coverage. • Greater impact on neighborhood.
Construct a New High School • Educationally desired outcome as it • Capital costs are greater. meets current educational • Operational costs are greater.
specification requirements. • Address future capacity needs. • Allow greater educational program
flexibility at all high schools.