28
References High Rise Construction

High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

Embed Size (px)

Citation preview

Page 1: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

ReferencesHigh Rise Construction

Page 2: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

DIN 18218

2

Arabtec (United Arab Emirates) built the world’s highest building – the Burj Khalifa – together with Sam-sung (Korea), Besix (Belgium) and Turner Corporation (USA), relying on MEVA formwork to do so.

More than just FormworkKnow-how for your building successFrom the beginning, it has been MEVA‘s philosophy to offer added value in the form of know-how and expertise – beyond supply-ing high-quality formwork. This far-reaching promise has been redeemed impressively for many years.

Leaders in the fieldCommittee and industry standards work has a high priority because it is essential to further expertise in concrete works. This is where qual-ity and safety standards are defined and imple-mented. The German quality control association (GSV) nominated MEVA to chair the technology committee; MEVA ist part of the influential, internationally active American Concrete Institute and its formwork committee and we´re a member of the ASCC (American Society of Concrete Contractors) to name only a few.

Page 3: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MEVA MEVA

3

High-Rise Construction: Contents

In the client satisfaction rankingconducted by the professional

building magazine SOLID among50 leading formerwork suppliers

Client Winner2012

No 1

Leading the way in concrete standardsMEVA has been instrumental in redefining the European DIN 18218 Standard for concrete load to take account of new concrete mixtures such as self-compacting and flowable concrete. A new procedure to determine how concrete pressure will develop during each pour is based on MEVA know-how and will be part of the new standard.

Expertise in architectural concreteMEVA is active part of the research consortium investigating the interaction between concrete, release agent and forming face. Its findings are the basis for the industry’s definitive publication on achieving top concrete finish: The Guide to Architectural Concrete.

MEVA is acclaimed as an innovative leader in the formwork industry, underlined by several awards, distinctions and commendations for quality and service.

MEVA

MEVA: More than just formwork .................................................................................................... 2Solutions in High-Rise Construction ................................................................................................. 4Technology in High-Rise Construction ............................................................................................. 6Quality Concrete Finish ................................................................................................................... 8MEVA International / Addresses and contacts ................................................................................ 26

More London Business Tower, Great Britain ...................................................................................10Mirax Federation Tower, Moscow, Russia .......................................................................................11Ardmore Park, Singapore ..............................................................................................................12Palais Royale, Mumbai, India .........................................................................................................13Soul Tower, Surfer’s Paradise, Australia ..........................................................................................14Burj Khalifa, Dubai, United Arab Emirates .....................................................................................15Al Nadha Tower, Sharjah, United Arab Emirates.............................................................................16Grass Residence, Manila, Philippines .............................................................................................17Jazz Residence, Manila, Philippines ................................................................................................18One Rockwell, Manila, Philippines .................................................................................................19Al Manara Tower, Dubai, United Arab Emirates .............................................................................20Burswood Tower 5, Perth, Australia ...............................................................................................21Al Attar Tower, Dubai, United Arab Emirates .................................................................................22Barwa Financial District, Doha, Qatar ............................................................................................23Maze Tower, Dubai, United Arab Emirates .....................................................................................24Allianz Tower, Wallisellen, Switzerland ...........................................................................................25

REFERENCES

Page 4: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

4

Cost Efficiency, Safety, QualityWith what and how?Requirements in high-rise construction are com-plex and demand expertise far beyond standard formwork applications. Where crane time and availablity is limited, site space is cramped and work flow is tight, it is the intelligent solution that makes the dif-ference. How you work is what determines suc-cess, not just with what you work. MEVA offers you a comprehensive product and technology programme plus the know-how and support that makes your project a success from A to Z.

Logistics, inventory, handlingHandling formwork material is often as impor-tant as the formwork itself. How much material needs to be moved from

one level to the next? Are the panels light enough to be lifted and

set up by hand? What is the best cycle? Can the formwork be stripped early to save

40 % inventory? Which climbing methods fits and how can

they combine for the interlocking work flows for walls, shafts and slabs?

What about worker protection?

Engineering

Work flow planning

Formwork design

Page 5: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MEVA MEVAMEVA

5

Solutions in High-Rise Construction

Contractor Benefit through ExpertiseMEVA engineers are committed to answering your questions with solu-tions and to assisting you in making the project a success through: Formwork design and planning Application consultation Customised solutions and design Work flow, cycles and early stripping Training for site managers and foremen Technical documentation

On-site project support Instruction of workers on site Supervision of work flows Forming and assembly services Support during concrete pours

Based on MEVA’s comprehensive prod-uct range for high-rise construction, the best solution for your project will be found. We are at your side to develop clever answers and support you in all formwork challenges.

On site support

Project management

Customised designs

Logistics

Page 6: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

1 2

3 4

5 5

6

Wall formwork Mammut 350 Support Frame STB 450

Slab formwork MevaDec Shoring System MEP

MEVA Guided Climbing MGC MEVA Guided Climbing MGC

Page 7: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MEVA MEVAMEVA

6 7

8

7

Technology in High-Rise Construction

Leading the Way

MEVA Guided Screens MGS Climbing scaffold KLK 230

MEVA Automatic Climbing MAC

Mammut 350: heavy-duty wall formwork for higher, faster, bigger pours

Support Frame STB: single-sided formwork for wall heights up to 13.50 m

Slab Formwork System MevaDec: fastest cycle, simple assembly, early stripping, less labour

Shoring System MEP for flexibility in heights and loads

MEVA Guided Climbing MGC: crane-lifted rail-guided wall climbing solution

MEVA Guided Screens MGS: crane or hydraulic-lifted rail-guided safety system for optimum edge protection

Climbing Scaffold KLK 230: scaffold platform for single and double-sided formwork

MEVA Automatic Climbing MAC: automatic hydraulic climbing system for fast precision-climbing in a single platform.

1

2

3

4

5

6

7

8

Page 8: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

12321

1 2

3

21

8

Warranty against rotting

Warranty against ripplings

Warranty on �exural rigidity

Warranty against discoloration

Warranty on UV resistance

7 Year unlimited usage

The All-Plastic Facing for Unlimited Cycles

The patented all-plastic facing sheet is made of polypropylene (1 and 3), reinforced by an aluminium foil (2). The facing is resistent to UV rays, shrinking, swelling, rotting, building chemicals and fungal decay. It remains stable in any climate or temperature.

The Serwator Hotel in Warsaw, Poland: superb concrete finish with every pour.

The all-plastic facing puts an end to plywood waste in formworkThe introduction of the world´s first 100% wood-free facing started a new age in form-work. Replacing worn-out plywood sheets is now a thing of the past. No more waste. Get your job done without interruptions. No more unnecessary freight costs, no down-times and no hassles in work flow. No more chemical coat-ings that make disposal dangerous and expen-sive. Less waste means fewer C02 emissions. Besides offering better quality, the all-plastic innovation saves time and money.

Your advantages No swelling and shrinking Nailable like plywood No re-facing – no hidden costs Easy and quick to clean Repairable using the same material Better concrete finish

Page 9: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MEVA

9

Quality Concrete Finish

Page 10: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

10

More London Business Tower, United Kingdom

ProjectOffice tower in London‘s CBD

MEVA SystemsMammut formwork on climbing scaffold KLK 230

Contractor Laing O‘Rourke

Formwork engineeringMEVA Formwork Systems, Tamworth

Combination of safety, cost-effectiveness and speed for climbing the cores.

Page 11: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

Mammut, KLK 230

11

Mirax Federation Tower, Moscow, Russia

Walls and Cores

ProjectCommercial tower and Europe´s highest build-ing

MEVA Systems Wall formwork Mammut Climbing scaffold KLK 230

Formwork engineeringZAO MosMeva, Moscow

High concrete pres-sure, robust on-site use over several years; no re-facing.

Page 12: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

12

Ardmore Park, Singapore

ProjectLuxury comdominium tower in Singapore´s central business district

MEVA Systems MEVA Automatic Climbing MAC Slab formwork MevaDec Wall formwork Mammut 350

DeveloperSC Global Development

Contractors Dragages / BBI Bouygues Batimat International

Formwork engineeringMEVA Formwork Systems, Singapore

Precision and speed: each level completed in 6 days including one climbing lift.

Page 13: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MAC, Mammut 350, MevaDec

REPROPPING

13

Cores, Walls and Slabs

Palais Royale, Mumbai, India

ProjectHotel and commercial tower – the largest and most innovative building project on the Indian subcontinent with: Underground parking garage Hotel complex Office tower Shopping mall

MEVA Systems MEVA Automatic Climbing MAC MEVA Guided Climbing MGC MEVA Guided Screens MGS Wall formwork Mammut 350 Wall formwork AluFix Slab formwork MevaDec Shoring system MEP

Formwork engineeringMEVA Formwork Systems, Mumbai

Safe overall solution with five systems for climbing, cores, walls and slabs.

Page 14: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

14

Soul Tower, Surfer‘s Paradise, Australia

ProjectCondominium tower with 77 levels on the Gold Coast in Quensland, Australia

MEVA SystemSlab formwork MevaDec

Contractor Grocon Pty Ltd., Melbourne, Australia

Formwork engineeringMEVA Formwork Systems, Singapore

Crane-independent slab formwork; 40 % less inventory due to early stripping.

Page 15: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MevaDec

15

Burj Khalifa, Dubai, United Arab Emirates

Slabs

Project The Burj Khalifa is the world´s highest building at 818 m and 206 levels. It was built with MEVA formwork technology. Seen here in December 2008: MEVA’s Tarc Froehlich and SAMSUNG Construction Manager Martin Kang on level 154.

MEVA SystemSlab formwork MevaDec with early stripping achieved record-breaking 3-day cycle no interruptions for re-facing in 28 month building period

ContractorJV Samsung, Besix, Arabtec

Project managementTurner Corporation (issued official recommendation for MevaDec as preferred slab formwork method in high-rise buildings)

Formwork engineering MEVA Schalungs-Systeme, Haiterbach

224,808 m² slabs on 154 levels: 0 re-facing. 3 dasy per slab. Tight schedule fulfilled.

Page 16: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

16

Al Nadha Tower, Sharjah, United Arab Emirates

ProjectResidential and commercial complex MEVA Systems MEVA Automatic Climbing MAC Slab formwork MevaDec Wall formwork Mammut 350

DeveloperSaef Abdullah Al Noman

ContractorUnited Engineering Construction

Formwork engineeringMEVA Schalungs-Systeme, Haiterbach, Germany

Combined safety and climbing solution for shafts, slabs and walls.

Page 17: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MAC ,MGC, Mammut 350

17

Walls, Cores and Slabs

Grass Residence, Manila, Philippines

ProjectFour residential high-rise buildings

MEVA Systems MEVA Guided Climbing MGC Wall formwork Mammut Slab formwork MevaDec

ContractorMegawide Construction Corp.

Customised climbing and safety work flow for all cores, walls and slabs.

Formwork engineeringMEVA Formwork Systems, Singapore

Page 18: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

18

Jazz Residence, Manila, Phillipines

Project4 residential towers with up to 45 levels. Fast tracking was applied: Using AluFix, the inner walls were poured after the slabs had been poured.

MEVA Systems Wall formwork AluFix Slab formwork MevaDec

ContractorMegawide Construction Corporation

Formwork engineeringMEVA Formwork Systems, Singapore

Crane-independent hand-set formwork for slabs and walls. High safety requirements.

Page 19: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

AluFix, MevaDec

19

One Rockwell, Manila, Philippines

Walls and Slabs

ProjectResidential & commercial tower

MEVA SystemSlab formwork MevaDec

ContractorDatem Inc.

Formwork engineeringMEVA Formwork Systems, Singapore

Slab work flow with hand-set formwork; less material required due to early stripping.

Page 20: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

20

Project Commercial office tower

MEVA Systems MEVA Automatic Climbing MAC Wall formwork Mammut 350 Slab formwork MevaDec

Formwork engineeringMEVA KHK

Climbing in one short lift. Adjustment of form panels with +/- 3 mm precision.

Al Manara Tower, Dubai, United Arab Emirates

Page 21: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MAC, Mammut 350

21

Walls, Cores and Slabs

Burswood Tower 5, Perth, Australia

ProjectResidential high-rise building in Burswood Park, Perth

MEVA Systems MEVA Automatic Climbing MAC Wall formwork Mammut 350 Slab formwork MevaDec Shoring system MEP

ContractorCrown Construction (Pty) Ltd.

Formwork engineeringMEVA Formwork Systems, Singapore

Highest safety demands. Closed hous-ing. Fast, safe climb in a single lift.

Page 22: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

22

Al Attar Tower, Dubai, United Arab Emirates

Labour and material handling reduced through crane-free work with MevaDec.

ProjectCommercial high-rise building

MEVA SystemSlab formwork MevaDec

ContractorAl Fara‘a

Formwork engineeringMEVA KHK

Page 23: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MevaDec

23

Barwa Financial District, Doha, Qatar

Slabs

Project9 residential and commercial high-rise buildings and a mosque

MEVA SystemsSlab formwork MevaDec with3 days per slab pouring schedule

ContractorBouygues Construction, Qatar

Formwork engineeringMEVA KHK, Dubai

Fast, zero error work with hand-set slab sys-tem. Optimum work flow. No down times.

Page 24: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

24

Maze Tower, Dubai, United Arab Emirates

ProjectCommercial high-rise building

MEVA Systems Wall formwork Mammut 350 Slab formwork MevaDec MEVA Guided Climbing MGC MEVA Guided Screens MGS

Work flow optimised in cycles: guided climbing plus hand-set system for slabs.

ContractorAl Rostamani Pegel

Formwork engineeringMEVA KHK

Page 25: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MGC / MGS

25

Allianz Tower, Wallisellen, Switzerland

Walls, Slabs, Guided Climbing & Screens

Strict safety super-vision by SUVA; complete enclosure for worker protection.

ProjectOffice tower for the Allianz Suisse insurance in the urban district Richti-Areal of the town of Wallisellen near Zurich. All safety precau-tions and equipment had to be planned and installed following the strict safety guideline of the national Swiss accident insurance SUVA. The MEVA Guided Screens system was a key factor for the required safety.

MEVA Systems MEVA Guided Screens MGS MEP shoring towers Wall formwork Mammut Working scaffold KAB 190 Slab formwork MevaDec

ContractorAllreal Generalunternehmung AG, Zurich

Formwork engineeringMEVA Schalungs-Systeme, Seon

Page 26: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MEVA SchalungsSysteme Pfaffstätten, A - Österreich

Novatec Construction SystemsAdelaide, AUS - Australia

N.V. van HautKruibeke, B - België/Belgique

MEVA Formwork SystemsToronto, CDN - Canada

MEVA SchalungsSystemeSeon, CH - Schweiz/Suisse/Svizzera

MEVA Sistemas de EncofradoBogotá, CO - Colombia

MEVA SchalungsSystemeHaiterbach, D - Deutschland

MEVA Systèmes de CoffrageSarreguemines, F - France

MEVA Formwork SystemsTamworth, GB - United Kingdom

MEVA Zsalurendszerek Budapest, H - Magyarország

VIBAU Gradevinska TehnikaBestovje, HR - Hrvatska

MEVA Formwork SystemsMumbai, IND - India

MEVA Formwork Systems, Mumbai, India

MEVA Schalungs-Systeme, Seon, Schweiz

MEVA Bekistingssystemen, Gouda, Nederland MEVA Sisteme de Cofraje, Bucuresti, Romania

MEVA Formwork Systems, Tamworth, Great Britain

26

MEVA in Haiterbach in the Black Forest, Ger-many. It is the home of the MEVA group of companies with its 40 locations in around 30 countries and 10 logistics centers all over the world. The headquarters are also home to research and development, engineering, production, rental logistics, detailing and sales. Cost-effective, lean logistics, transparent work flow, cost-saving rental concepts, technical sup-port for better concrete results: client benefit is in focus, everywhere. All the time. All over the world.

Page 27: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

MEVA

MEVA Asia PacificSingapore, SGP - Singapore

VIBAPetrovce, SLO - Slovenija

MEVA KHKDubai, UAE - United Arab Emirates

MEVA Formwork SystemsSpringfield, Ohio USA - United States of America

UAB MuramedaKaunas, LT - Lietuva

Waiko Engineering WorksPerak, MAL - Malaysia

TeknikkOslo, N - Norge

MEVA BekistingssystemenGouda, NL - Nederland

CorpinsaCuidad de Panamá, PA - Panamá

PPU PalisanderBialystok, PL - Polska

MEVA Sisteme de cofrajeBucuresti, RO - Romania

ZAO MosMevaMoskva, Sankt-Peterburg, RUS - Rossija

MEVA

MEVA Schalungs-Systeme, Haiterbach, Deutschland

MEVA Formwork Systems, Springfield, Ohio, USA

27

International

Page 28: High Rise Construction - meva- · PDF fileMEVA MEVA 3 High-Rise Construction: Contents In the client satisfaction ranking conducted by the professional building magazine SOLID among

Headquarters (Germany) International Sales & ServiceLogistic Centers

2458

GB

1000

3/1

3 M

, Prin

ted

in G

erm

any

MEVA Schalungs-Systeme GmbH

Industriestrasse 5

D-72221 Haiterbach

Tel. +49 7456 692-01

Fax +49 7456 692-66

[email protected]

www.meva-international.com

A-Pfaffstätten, Tel. 02252 20900-0

D-Berlin, Tel. 03375 90300

D-Haiterbach, Tel. 07456 692-01

D-Hannover, Tel. 0511 949930

GB-Tamworth, Tel. 01827 60217

H-Budapest, Tel. 01 2722222

RO-Bucuresti, Tel. 021 2066460

RUS-Moskva, Tel. 495 7813737

USA-Springfield, Tel. 937 3280022

A-Pfaffstätten, Tel. 02252 20900-0

AUS-Adelaide 08 82634377

B-Kruibeke, Tel. 03 250 11 11

CHSeon, Tel. 062 7697100

CDN-Toronto, Tel. 416 5766397

CO-Bogotá, Tel. 01 5204236

FSarreguemines, Tel. 0387 959938

GBTamworth, Tel. 01827 60217

HBudapest, Tel. 01 2722222

HR-Bestovje, Tel 013 323 666

IND-Mumbai, Tel. 022 27563430

LT-Kaunas, Tel. 0684 82795

MAL-Perak, Tel. 12 5209337

N-Oslo, Tel. 067 154200

NLGouda, Tel. 0182 570770

PA-Panama City 507 2372222

PL-Bialystok, Tel. 085 6768159

ROBucuresti, Tel. 0 21 2066460

RUSMoskva, Tel. 495 7813737

RUSSankt-Peterburg, Tel. 812 6802890

SGP-Singapore, Tel. 67354459

SLO-Petrovce, Tel. 03 7131500

UAEDubai, Tel. 04 3411180

USASpringfield, Tel. 937 3280022