21
1. Introduction 2. High intensity proton beam measurements at GSI-UNILAC 3. Pushing the limits for uranium beam operation 4. Heavy ion stripping 5. beam brilliance analysis 6. U 28+ -beam brilliance at SIS18 injection 7. Summary&Outlook High Current Uranium Beam Measurements at GSI-UNILAC for FAIR Winfried Barth, GSI&HIM A. Adonin 2 , Ch. E. Düllmann 1,2,3 , M. Heilmann 2 , R. Hollinger 2 , E. Jäger 2 , O. Kester 2 , J. Khuyagbaatar 1,2 , J. Krier 2 , E. Plechov 2 , P. Scharrer 1,2,3 , W. Vinzenz 2 , H. Vormann 2 , A. Yakushev 1,2 , S. Yaramyshev 2 1 Helmholtz Institute Mainz, Germany 2 GSI Helmholtzzentrum für Schwerionenforschung, Darmstadt, Germany 3 Johannes Gutenberg-Universität Mainz, Germany

High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

  • Upload
    hathu

  • View
    233

  • Download
    0

Embed Size (px)

Citation preview

Page 1: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

1. Introduction

2. High intensity proton beam measurements at GSI-UNILAC

3. Pushing the limits for uranium beam operation

4. Heavy ion stripping

5. beam brilliance analysis

6. U28+-beam brilliance at SIS18 injection

7. Summary&Outlook

High Current Uranium Beam Measurements at GSI-UNILAC for FAIR Winfried Barth, GSI&HIM A. Adonin2, Ch. E. Düllmann1,2,3, M. Heilmann2, R.Hollinger2, E. Jäger2, O. Kester2, J.Khuyagbaatar1,2, J. Krier2, E. Plechov2, P. Scharrer1,2,3, W.Vinzenz2, H. Vormann2, A.Yakushev1,2, S. Yaramyshev2

1 Helmholtz Institute Mainz, Germany 2 GSI Helmholtzzentrum für Schwerionenforschung, Darmstadt, Germany 3 Johannes Gutenberg-Universität Mainz, Germany

Page 2: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

1. Introduction The GSI UNIversal Linear ACcelerator

High Current Injector (1999) Alvarez (1975) Single Gap Resonators (1975)

High Charge State Injector (1991)

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR 2

Page 3: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

3

Facility for Antiproton and IonResearch

Upgraded existing facility:´ion-beam source and injector for FAIR

Primary beams: protons to 238U

Accelerator Components & Key Characteristics

Ring/Device Beam Energy Intensity SIS 100 (100Tm) protons 30 GeV 4x1013

238U 1 GeV/u 5x1011 (intensity factor 100 over present)

SIS 300 (300Tm) 40Ar 45 GeV/u 2x109

238U 34 GeV/u 2x1010

CR/RESR/NESR ion and antiproton storage and experiment rings HESR antiprotons 14 GeV ~1011

Super-FRS rare isotope beams 1 GeV/u <109

New future facility: ion and anti-matter beams of highest intensities and high energies

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 4: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

LEBT RFQ HSI Gasstripper Alvarez Single GapRes.

TK Emittance@TK

Ion

cu

rren

t [m

A]

April 14

May 14

July 14

October 14

October 15

p+ - design limit

H3+ (3)p+

CH3+ (3)p+

C3H7+ (7)p+

2. High intensity proton beam measurements at GSI-UNILAC

4 W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 5: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

Front to end emittance measurements with a high current proton beam

5

W. Barth, et al., Phys. Rev. ST Accel. & Beams 18, 050102 (2015)

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 6: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

High Current Proton Beam Analysis

6

Analysis of (horizontal) beam emittance

Horizontal multi-turn injection into SIS18 • Beams are stacked until machine

acceptance is reached • Loss should be as low as possible

due to activation, damage, vacuum

... fixed particle number ... fixed relative fraction

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 7: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

3. Pushing the limits for uranium beam operation

7

• Ion Source: Applying a multi-aperture extraction system at the VARIS ion source Increased U4+-intensity and improved primary beam brilliance

• Low Energy Beam Transport: Improved LEBT-performance and RFQ-Matching using high brilliance uranium beam from the VARIS 70% RFQ-Transmission (Iout = 9.7 emA)

• RFQ: RF optimization by adjusting plunger positions at the HSI RFQ tank and extensive rf-conditioning Reduction of forwarded rf-power, yielding for reliable high-current uranium beam operation.

• MEBT: Optimizing the between RFQ and IH DTL by increasing the transverse and longitudinal focusing strength (3%) Reduction of beam loss, stable high current operation

• 1.4 MeV/u-Transport Line: Adapting the quadrupole channel (matching the gas stripper) 90% beam transmission, U4+ beam current of 6.6emA available for heavy ion stripping.

High Current Injector

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 8: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

4. Heavy Ion Stripping

• For high intensive heavy ion beams Increase of the so called „ionic charge“ by collision with matter (= STRIPPING, Removal of electrons) Reduction of the necessary effective potential for the acceleration of ions.

• Collision of heavy ions with matter e—capture ( Z5) and e--loss ( Z4)

• (Pulsed) H2 gas stripping cell with target thickness > 10μg/cm2

gas stripper section

-10 0 +10 X [mm]

-10

0

+10

Y [m

m]

27+ 28+ 29+

238U

8 W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 9: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

N2

H2

Particle Stripping Efficiency

U26+ U29+

N2-gas jet [6] H2- gas cell

Stripper-back-pressure 0.4 MPa 5.5 MPa (pulsed)

U4+-current (HSI) 6.0 emA 6.6 emA

Stripping charge state 28+ 29+

Max.uranium-current 4.5 emA 9.97 emA

Stripping efficiency 12.70.5% 21.00.8%

Energy loss 145 keV/u 275 keV/u

x (90%, tot.) norm. 0.76 µm 0.66 µm

y (90%, tot.) norm. 0.84 µm 1.15 µm

Hor. brilliance (90%) 5.32 mA/µm 13.60 mA/µm

Beam Energy Loss:

U28+ N2-jet (max.) 145 keV/u

U28+ Pulsed H2-stripper cell (1 valve, 7.5 MPa) 175 keV/u

U29+ Pulsed H2-stripper cell (2 valves, 5.5 MPa) 27 5 keV/u

Beam Parameters:

9 W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 10: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

10

0

4

8

12

16

LEBT HSI gas stripper

ion

curr

ent

[em

A]

Oct 14

Nov 14

Oct 15

Design

U4+

U28+

High Current Uranium Beam Transmission

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 11: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

High Current Uranium Beam Measurements at 1.4 MeV/u

horizontal vertical

-20 0 20 X [mm]

15

0

-15

X‘ [

mra

d]

-20 0 20 Y [mm]

15

0

-15

Y‘ [

mra

d]

-20 0 20 X [mm]

15

0

-15

X‘ [

mra

d]

-20 0 20 Y [mm]

15

0

-15

Y‘ [

mra

d]

H2 H2

N2 N2

norm.,tot,99% = 1.8 mmmrad norm.,tot,99% = 1.1 mmmrad

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 12: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

Beam Profile Measurements at 1.4 MeV/u

12

Beam spot (charge separation):

Pure separation from neighbouring charge states

emittance growth (momentum straggling) spot size

Ana

lyzi

ng s

lit

High Current Injector

Poststripper

Stripper box

QD 1 QD 2 QT

QD 3

D 1

D 2

D 3

Analyzing slit

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 13: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

13

5. Beam Brilliance Analysis

0

10

20

30

40

0 2 4 6 8 10

Bea

m B

rillia

nce

[mA/m

m]

I [emA]

238U28+

I = 9.7 emA @1.4 MeV/u

Bx [mA/muem]

By [mA/muem]

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 14: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

High brilliance uranium beam measure-ments at 1.4 MeV/u

0.0

0.3

0.6

0.9

1.2

0 20 40 60 80 100

Hor

. Bea

m E

mitt

ance

[m

m]

Fraction [%]

238U28+

N2-Target, 4.5 emA

H2-Target, 7.8 emA

H2-Target, 9.7 emA

Gain of intensity:

Increased particle number inside same hor. emittance

higher beam brilliance 0.0

0.3

0.6

0.9

1.2

0 2 4 6 8 10

Hor

. Bea

m E

mitt

ance

[m

m]

I [emA]

238U28+

0.45 mm ... fixed particle number

... fixed relative fraction

General analysis of fraction emittance

X [mm]

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 15: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

15

0

10

20

30

40

0 2 4 6 8 10

Hor

. Bea

m B

rillia

nce

[mA/m

m]

I [emA]

238U28+ 4.0 emA5.0 emA7.8 emA9.7 emA

Horizontal Beam Brilliance Analysis

Fractional Beam Brilliance for I = 3 emA

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 16: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

5

10

15

20

25

30

35

40

3 5 7 9 11

Bx [

mA/

µm]

IU28+ [emA]

k 4.3

I = 1 emA Bx = 4.3 [mA/mm] (for a fractional current of 3 emA)

16

Fractional Beam Brilliance for a fixed Particle Number I = 3 emA

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 17: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

Emittance Beam Analysis

17

Proton beam emittance

0.0

0.4

0.8

0 5 10 15

Hor

. Bea

m E

mitt

ance

[m

m]

I [emA]

238U28+

17 emA (rescaled, 2 mA, p)9.7 emA7.8 emA4.5 emA

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Uranium beam emittance

Page 18: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

6. U28+-beam brilliance at SIS18 injection

• Determination of U28+-beam brilliance at SIS18 injection: High current U28+-beam brilliance measurement at 1.4 MeV/u Front-to-end high-current proton beam measurements (up to 11.4 MeV/u)

• UNILAC parameters scale with the mass-to-charge ratio m/q:

• Proton beam transmission TMfin (stripper until) SIS18-injection:

• Proton rms emittance growth EWfin(p+); considering particle loss:

• Resulting proton beam brilliance loss BL(p+):

• Assuming brilliance loss scales with ion current density brilliance loss BL(U28+) for the measured maximum uranium beam current (for charge state 28+) of 9.70emA:

18

15.8

)(

)()(

28

pqm

Uqm

scalqm

%75)( pTM fin

%3)( pEW fin

%23%100)(%100

)(%100)(

pEWpTM

pBLfin

fin

%.15%236.0)()(2

70.9)( 28

pBLscal

qmemA

emAUBL

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 19: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

Loss free (high current) U28+-beam injection into the GSI-synchrotron SIS18

19

• UNILAC beam measurement at 1.4 MeV/u • Reduced UNILAC beam brilliance at SIS18 injection • SIS18-beam intensity to achieve space charge limit (2•1011 part. per pulse) • SIS18-beam intensity after multi turn injection (𝑰𝒔𝒄𝒍 = 𝟏𝟖𝟕. 𝟓 𝒆𝒎𝑨)

30 turn injection

S. Appel, private communication (2016) 0

50

100

150

200

0

4

8

12

16

0 0.5 1 1.5 2 2.5 3 3.5

ISIS18 [emA]

I 0 [m

A]

hor. emittance [mm mrad]

measured (1.4 MeV/u)

UNILAC (11.4 MeV/u)

SIS18-injection

ISIS18 [emA]

𝑰𝒔𝒄𝒍 = 𝟏𝟖𝟕. 𝟓 𝒆𝒎𝑨

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 20: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

7. Summary and Outlook

20

Loss-free injection into the SIS18 is a necessary condition, especially for operation with high intensity heavy ion beams.

By horizontal collimation of the UNILAC beam emittance in the transfer line, the SIS18 space charge limit could be reached at significantly lower peak currents, but accordingly longer injection times (55 µs 138 µs)

The conducted high current proton beam emittance measurement throughout the UNILAC shows a loss of horizontal beam brilliance of 23% the high current uranium beam brilliance (measured at 1.4MeV/u) grows until SIS18 injection accordingly.

The horizontal beam brilliance growths strongly with the beam intensity

For higher currents the core of the uranium phase space distribution perhaps remains constant during acceleration and beam transport

30 turns have to be injected in the SIS18 to fill up to the SCL (Design: 12 turns; Iunilac = 15 emA)

For further confirmation, it is evident to perform uranium measurements at full UNILAC energy.

Through horizontal collimation (2mmmrad), the number of measured uranium particles in this phase space area could be sufficient to fill the SIS18 up to the space charge limit (2•1011 part. per pulse).

W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR

Page 21: High Current Uranium Beam Measurements at GSI-UNILAC …accelconf.web.cern.ch/AccelConf/hb2016/talks/tuam7y11_talk.pdf · High intensity proton beam measurements at GSI-UNILAC 3

Thank You for Your Attention!

21 W. Barth, High Current Uranium Beam Measurements at GSI-UNILAC for FAIR