High Court Chandigarh2

Embed Size (px)

Citation preview

  • 7/31/2019 High Court Chandigarh2

    1/26

    High CourtChandigarh-sector 1

    Completion 1955

    .

    Architect-Le Corbusier

  • 7/31/2019 High Court Chandigarh2

    2/26

    Capitolcomplex

    The Capitol Complex is the focal point if the city, both visually and symbolically .

    The three major components of the Capitol are the Assembly (Legislation), theSecretariat (Administration) and the High Court (Judiciary).

  • 7/31/2019 High Court Chandigarh2

    3/26

    Location

    While the linear faade of the

    Secretariat marks the edges of

    the Complex on the left side,

    the Assembly and the HighCourt are placed on the

    opposite ends of the Cross

    axis, facing each other across a

    450 mtrs.

  • 7/31/2019 High Court Chandigarh2

    4/26

    Project Brief

    The program of the high court building specified provision for eight law courts and a high

    court, together with necessary office space of many Administrative Branches such as

    Registrar's Office, Establishment Branch, Gazette Branch and Copying Branch etc. TheOffices of Advocate-Generals of Punjab and Haryana

  • 7/31/2019 High Court Chandigarh2

    5/26

    Project

    In plan the building took the form of an

    abbreviated L-shape with the long

    facade facing the capitol plaza to contain

    the courtrooms and the small rear

    extension to accommodate offices.

    The building has a rectilinear frame with

    eight nos. courtrooms located on the

    main faade, separated from the larger

    Chief Justice Court by a monumental,

    pillared entrance, extending to the full

    height of the entrance.

    The small Courts are 8x8x12 meters. The

    dimensions of the over all design were

    governed by the Modular combined

    with triangular regulating lines.

  • 7/31/2019 High Court Chandigarh2

    6/26

    ProjectPARASOL ROOF

    FORMING ARCHES

    DOUBLE ROOF

    GAP LEFT BETWEEN

    TWO ROOFS

    FULL HT ENTRANCE

    REAR VIEW

    DOUBLE ROOF

    [APPROACHED THROUGH ROADS]

    ENTRANCE THROUGH THE PIAZZA

  • 7/31/2019 High Court Chandigarh2

    7/26

    Project

    . The three vertical piers,rising 60 feet from the floor and

    painted in bright colours form the grand entrance to the

    building

  • 7/31/2019 High Court Chandigarh2

    8/26

    Project

    ROUGH CONCRETE

    FINISHED RAMP

  • 7/31/2019 High Court Chandigarh2

    9/26

    Project

  • 7/31/2019 High Court Chandigarh2

    10/26

    Project

  • 7/31/2019 High Court Chandigarh2

    11/26

    Project

  • 7/31/2019 High Court Chandigarh2

    12/26

    Concept

    Early sketches for the building show a multiplicity of arch forms on the

    facades, with the main courtroom floor raised above ground level on pilots

    and approached by a ramp.

    In the final version, however, the building rises directly from the earth, the

    main facade defined by a fullheight concrete brise-soleil and the arch forms

    restricted to the underside of the arasol roof.

  • 7/31/2019 High Court Chandigarh2

    13/26

    Concepts

    In the general plane of the building, which includes the development has the

    shade from the sun of the bureaus and of course, the modular has made the unit in

    all places textured.-Translated from French.

    As Le Corbusier developed the design for the high court, it evolved toward an expression

    increasingly massive, plastic, and abstract. The perhaps excessive horizontality of earlierschemes was countered by an increase in vertical dimension, while what were originally

    narrow columns in the main entrance hall became three massive flattened piers leading

    inward.

  • 7/31/2019 High Court Chandigarh2

    14/26

    It is the visual drama of these piers rising sixty feet from the ground to meet the

    heavy outward thrust of the roof which creates the focal emphasis of the present

    plan. What in early drawings was expressed as a lightly framed pavilion,

    horizontal in dimension, has become a vertically expanding space in which the

    void is defined and dramatized by strongly assertive sculptural elements. Within

    the simple and rather static outer frame, the building embodies a constantlyactive balance of tensions

    Concepts

  • 7/31/2019 High Court Chandigarh2

    15/26

    Concepts

    An effort to shade the entire structure has

    resulted in the use of a double roof, the

    upper roof cantilevered out over the office

    block in the manner of a parasol shading the

    lower roof and also providing a trough from

    which monsoon rain water spills through

    heavy spouts at either end, falling sixty feet

    to channels connected with the reflecting

    pools.

    The space between the two roofs is leftopen to enable currents of air to move

    between the flat roof of the office block and

    the underside of the parasol roof which

    slopes toward the center in the form of a

    row of arches.

  • 7/31/2019 High Court Chandigarh2

    16/26

    Plans

  • 7/31/2019 High Court Chandigarh2

    17/26

    Sections

  • 7/31/2019 High Court Chandigarh2

    18/26

    Claustraus

    On the main facade the deep (4 ft. 7 in.), fixed concrete brise-soleil

    gives a strong and scale less pattern to the building, and only human

    beings and the unobtrusive courtroom doors can be used as visual keys

    for reading the dimensions of the surface.

    Commented the architect, "here the brise-soleils take the place of the

    weather-drips on a classical facade, but they cover not only the

    windows but the entire facade, and influence the whole structure.

  • 7/31/2019 High Court Chandigarh2

    19/26

    It is the concrete screen which gives the main facade its overall unity, so that it is perceived notas an assemblage of floor levels and courtroom chambers, but as a single entity of plastically

    interwoven elements, in which the horizontal ground line, repeated in the two roof levels, is

    countered buy the powerful upward thrust of the entrance piers and the pillars between the

    courtrooms, whose vertical line is echoed in the roof supports.

    Claustraus

  • 7/31/2019 High Court Chandigarh2

    20/26

    Finish

    Within sheet metal formwork one can

    insert swan planks, cut more or less

    according to ones wish.

    When the pouring of concrete is

    completed recessed moulding appear

    in the face of the concrete.

    This situation is similar to the

    sculptured frescos in Egyptian temples

    built some 5000 years ago. It is done so as to bring forth the

    surface and volume, the materials,

    their place of work, the meaning of

    times and also the rigorous schedule of

    the job site are also recognized.

  • 7/31/2019 High Court Chandigarh2

    21/26

    Main Facade

    Le Corbusier once described the complex of which the high courtformed a part as "a great architectural venture using very poor

    materials and a labor force quite unused to modern building

    techniques, with the tremendous obstacle of the sun and the

    necessity of satisfying Indian ideas and needs, rather than to impose

    Western ethics and aesthetics.

  • 7/31/2019 High Court Chandigarh2

    22/26

    Main Facade

  • 7/31/2019 High Court Chandigarh2

    23/26

  • 7/31/2019 High Court Chandigarh2

    24/26

    TapestriesThe counterbalance of complexities

    and the tree as a symbol of

    perfection. Air-conditioning ducts

    puncture the tapestry

    indiscriminately, mutilating motifs.

    In the middle, top part, the sky with a starlit night

    and a sun. The clouds around open on a blue sky. On

    the left, the meander of the rivers that signifies that

    its run may sometimes be very long, very agitated,

    very unreasonable. It is the meander of complicationsand of complexities.

  • 7/31/2019 High Court Chandigarh2

    25/26

  • 7/31/2019 High Court Chandigarh2

    26/26