HIGH RADIATION TO MATERIALS:STATUS OF THE EXPERIMENTAL AREA
Ans Pardons HiRadMat Hearing, 27th of July 2011
Outline Location of HiRadMat facilities Table assemblies Status of experimental area
Status July 2011 Remaining work for Q3 2011 Shut-down work 2011-2012
Operation with test table Handling Life cycle
EDMS 1155004
Location of HiRadMat Facilities2
User access: When all safety conditions are
met: access until assembly & preparation area in TJ7
Access to TNC only with special permission and planned in advance
Control room
Surface lab
Handling test tablesTest object is mounted on table in
lab with BA7 overhead craneBA7-TJ7: custom-made trailerTJ7-TNC: remote handling with
overhead crane
Assembly & Preparation
area
Ans Pardons HiRadMat Hearing, 27th of July 2011
Table assemblies3
Test object mounted on movable table = test table
3 base tables in tunnel, with a dummy table in the surface lab for aligning & test before beam
Remote plug-in connectors Water cooling, signal (2011) &
power (2012) Remote handling of test table with
crane, using mechanical guides
Assembly of test object and movable table – installed on base table
4
4 Base table
1
3
2
Movable table
Connectors
Test object (e.g. LHC collimator) mounted on movable table in lab
1
3
2
Ans Pardons HiRadMat Hearing, 27th of July 2011
Status of the experimental area4
Status after the last technical stop (TS 4-8/7/2011):Status July 2011 & remaining work 2011
3 base tables installed and aligned to the beam
All signal cables pulled from TNC to TJ7 and from TJ7 to control room (installation rack in TJ7 and connection cables to tables planned for next TS)
Table cooling circuit installed (connection to tables and pressure test planned for next TS)
Also to be done in the next TS: quick connector on gas line opposite tables + completion gas line from TJ7 to surface
Ans Pardons HiRadMat Hearing, 27th of July 2011
Status of the experimental area5
Status after the last technical stop (TS 4-8/7/2011):Status July 2011 & remaining work 2011
3 supports for test tables installed in cool-down zone
Extensive handling tests done with movable table (remote tests planned for next TS, when final camera system installed)
Ans Pardons HiRadMat Hearing, 27th of July 2011
Shut-down work6 Activities for 2011-2012 shut-down:
Cabling of tables 1 and 3 from table to control room Installation of power line (4kV) from table 2 to surface Additional remote handling tests if needed Exchange of entrance window of TED-style beam dump
(remote handling of upstream collimator, shielding &TED) Remote handling of 2011 test tables from cool-down area
to surface (after RP green light) ??? Disposal of former-T9 copper blocks currently stored
in sarcophagus in downstream T9 (only if RP green light, possibly delayed until 2013-2014 shut-down)
Ans Pardons HiRadMat Hearing, 27th of July 2011
Handling of test table7
Set of 5 Pan-Zoom-Tilt optic fibre network cameras on crane frame(also on lifting beam)
Cameras installed right before intervention
Viewing station with screens in TJ7 – test during next TS
Operation
TNC
TJ7
To material lift and BA7
Ans Pardons HiRadMat Hearing, 27th of July 2011
Life cycle of test table8 Operation
Reminder: Test objects must be contained, cable feed-throughs and portholes must be tight
Installation of table is 100% remoteEach access to TNC must be duly justified. They must be requested before the test table installation.
After the beam test, the test table will be moved remotely to the downstream cool-down zone for a cool-down period defined by the radioprotection team.
After the cool-down period, the object will be transported to the surface and brought to an adapted (CERN-RP) lab for dismantling. HiRadMat project recovers the mobile table, the user is responsible for treatment of the test object (disassembly, analysis, disposal).
Ans Pardons HiRadMat Hearing, 27th of July 2011
9
Thank you for your attention – Any questions?
High Radiation to Materials: EXPERIMENTAL Area DESIGN
Ans Pardons HiRadMat Hearing, 27th of July 2011
Spare slides
Test tables
HiRadMat Review, 26th of May 2011
11 Mobile table: geometry and services
Test table geometry Mostly aluminium Weight 450kg Base plate 50mm thick
Available for test object: Volume: 2 m x 0.7 m x (H) 1.5m
(or cylinder of R=0.35m around beam) Weight: 2000kg Plug-in connectors
Remote handling with overhead crane Test object mounted in surface lab
1
3
2
1
1
2
13
2
Movable table
Connectors
Test object (e.g. LHC collimator) mounted on table as in lab
Test tables12 Mechanical guides
Base table: mechanical guides for remote installation 3 V- shaped supports per mobile table(Extra V-shaped supports allow for different table sizes) Lab-tested (<0.1mm), tunnel exercises planned
1
2
3
1 2
3
Cooling test tables
IEFC Workshop Mar. 22, 2011
13 (more details in presentation of Paul Pepinster/Magali Mendez)
Ans Pardons
Detection pressure drop safety valves
close
B. Lacarelle, Y. Lupkins
TJ7
TNC
TA7
, 9 bar
Handling of test tables
HiRadMat Review, 26th of May 2011
14
1. From lab to test zone (non-radioactive object) Surface lab: overhead crane to trailer Trailer: from BA7 material lift TJ7 TJ7: transfer to overhead crane Remote with crane: TJ7 test zone in TNC
Lab to test zone
Custom-made trailer
Handling of test tables15 Cool-down zone
Cool-down zone for test tables with test objects Downstream in TNC, within reach of crane 3 places (supports) foreseen for 2011, 5 more for 2012
Downstream end of TNC
Test table supports 100% Aluminium Mechanical guides for remote
installation (also remote dismantling) Handling exercises in tunnel planned
Handling of test tables16 Test zone to cool-down zone
2. From test zone to cool-down zone (radioactive object) Remote with crane: TJ7 cool-down zone in TNC Remote with crane: place on cool-down zone supports
Handling of test tables17 Cool-down zone to surface
3. From cool-down zone to surface (radioactive object) Remote, with crane: cool-down zone in TNC TJ7 Remote, with crane: place on trailer Manually, protected by distance (and shielding if needed):
TJ7 material lift surface Manually and in truck with container (and shielding if needed):
surface CERN radioactive lab for disassembly When needed, followed by waste disposal (CERN) If dose rate negligible empty mobile table can be re-used