CADANGAN PEMBANGUNAN WISMA JABATAN PELAJARAN NEGERI SABAH DI ATAS LOT SEBAHAGIAN 017523974 UNTUK TETUAN KEMENTERIAN PELAJARAN
MALAYSIA
Item Description Unit Quantity Rate Amount
ROOF AND FINISHES
Roofer
Roof Structures
Price for the roof trusses shall include all steel members,
connection plates, bolts, etc. including all necessary steel
plate, etc. with and including design fees, fabricaton,
installation and manufacturer's guarantee and all as per
Architect's drawings.
The tender is requested to submit shop drawings,
specification and calculation sheet together with tender
document for approval. Only designs from specialist
Properieotory Roof Trusses Manufacturer's together with
their Professional Engineer endorsement will be accepted
A Design, fabricate , supply, transport, and install a minimum
of ten(10) yesrs warranty (commencing from the date of the
Certificate of Making Good Defects LYSACT Zincalume
structural roof system or approved equivalent to support
roofing material (measured separately) at 25 degrees pitch
approx. 193m2 and hoisting to a height of approximately
3.30m above ground level using approved Roof System to
suit the architectural drawings and other related drawings
and project information complete steel roof trusses with
including battens, accessories, fasteners and plate as
described all to the manifacturer's instruction and to the
approval of the S.O. The Contractors is to study and fully
understand the drawing for steel roof trusses. M2 92
Roof finishes
B One layer approved double sided aluminium foil laid on
galvanised mesh wire netting (measured separately) well
lapped at joints. M2 92
C Approved 50mm thick fibre glass wool insulation (40kg/m3)
laid on aluminium foil (measured separately). M2 92
D Approved 50mm thick galvanised mesh x 12 swg wire
netting with approved straining wire (measured nett-no M2 92
allowance made for laps).
To Collection (RM)