Heartland Coast-to-CoastCorridor Study
___________________
Presented Sept. 11, 2007Sanibel Harbour Resort Spa
Heartland Coast-to-CoastCorridor Study
___________________
Presented Sept. 11, 2007Sanibel Harbour Resort Spa
Heartland Coast-to-CoastStudy Corridor
Heartland Coast-to-CoastStudy Corridor
130-mileCorridor
130-mileCorridor
150-mileCorridor
150-mileCorridor
Typical Roadway SectionTypical Roadway Section
(not to scale)
(not to scale)
Florida’s Future CorridorsAction Plan
Florida’s Future CorridorsAction Plan
Corridor Study SummaryCorridor Study Summary
• Conceptual corridor & typical section
• Project cost estimate
• Travel demand forecast (traffic volumes)
• Gross revenue / net revenue estimate
• Calculation of bonding capacity
• Determination of toll funding contribution
• Conceptual corridor & typical section
• Project cost estimate
• Travel demand forecast (traffic volumes)
• Gross revenue / net revenue estimate
• Calculation of bonding capacity
• Determination of toll funding contribution
Project Cost Estimate(2007 Present Day Dollars)
Project Cost Estimate(2007 Present Day Dollars)
I-75 to Florida’s Turnpike (130 miles)Construction $3,765,000,000Engineering 565,000,000Right of Way 260,000,000
TOTAL $4,590,000,000
I-75 to Florida’s Turnpike (130 miles)Construction $3,765,000,000Engineering 565,000,000Right of Way 260,000,000
TOTAL $4,590,000,000
I-75 to I-95 (150 miles)Construction $4,345,000,000Engineering 652,000,000Right of Way 303,000,000
TOTAL $5,300,000,000
I-75 to I-95 (150 miles)Construction $4,345,000,000Engineering 652,000,000Right of Way 303,000,000
TOTAL $5,300,000,000
Travel Demand ForecastsTravel Demand Forecasts
• Used Turnpike State Model• Open-to-traffic year = 2015• Modeled years 2015 and 2035• Toll rates = $0.10/mile and $0.12/mile• Toll increase 25% every 10 years• State road improvements per Work
Program through 2015• Local road improvements
• Used Turnpike State Model• Open-to-traffic year = 2015• Modeled years 2015 and 2035• Toll rates = $0.10/mile and $0.12/mile• Toll increase 25% every 10 years• State road improvements per Work
Program through 2015• Local road improvements
Year 2035 Traffic (AADT)Year 2035 Traffic (AADT)
4,3004,3004,9004,9007,2007,2004,6004,6002,3002,3005,5005,500
To Tpk.To Tpk.
Year 2035 Traffic (AADT)Year 2035 Traffic (AADT)
25,40025,40018,70018,70017,60017,60016,90016,90010,20010,2006,1006,1008,7008,700
4,3004,3004,9004,9007,2007,2004,6004,6002,3002,3005,5005,500
To Tpk.To Tpk.
To I-95To I-95
4,6004,6002,3002,300
Revenue ForecastsRevenue Forecasts
• Estimates for $0.10/mile and $0.12/mile
• Toll increase 25% every 10 years
• Gross revenue stream year 2015 – 2044
• Subtract O&M costs to get net revenues
• Calculate bonding capacity
• Compare bonding capacity vs. costs
• Estimates for $0.10/mile and $0.12/mile
• Toll increase 25% every 10 years
• Gross revenue stream year 2015 – 2044
• Subtract O&M costs to get net revenues
• Calculate bonding capacity
• Compare bonding capacity vs. costs
Toll Revenue EstimatesToll Revenue Estimates
East Terminus at Turnpike Gross Net
Year 2015 $2.1 M N/A
Year 2044 $40.9 M $2.7 M
East Terminus at Turnpike Gross Net
Year 2015 $2.1 M N/A
Year 2044 $40.9 M $2.7 M
Bonding Capacity = N/ABonding Capacity = N/A
Toll Revenue EstimatesToll Revenue Estimates
East Terminus at Interstate 95 Gross Net
Year 2015 $8.0 M N/A
Year 2044 $135.8 M $87.0 M
East Terminus at Interstate 95 Gross Net
Year 2015 $8.0 M N/A
Year 2044 $135.8 M $87.0 M
Bonding Capacity = $434 MBonding Capacity = $434 M
Toll Funding Contribution(assumes 2012 construction start)
Toll Funding Contribution(assumes 2012 construction start)
East Terminus at Turnpike
Bonding Capacity N/AProject Costs (escalated) $ 5,720 M
SHORTFALL $ 5,720 M
East Terminus at Turnpike
Bonding Capacity N/AProject Costs (escalated) $ 5,720 M
SHORTFALL $ 5,720 M
East Terminus at Interstate 95
Bonding Capacity $ 434 M
Project Costs (escalated) 6,603 M
SHORTFALL $ 6,169 M
East Terminus at Interstate 95
Bonding Capacity $ 434 M
Project Costs (escalated) 6,603 M
SHORTFALL $ 6,169 M
-10%-10%-22%-22%-24%-24%-9%-9%NCNC-1%-1%
SR 60 Traffic Impacts(projected Year 2035)
SR 60 Traffic Impacts(projected Year 2035)
21,700 / 16,60021,700 / 16,600
SR 70 Traffic Impacts(projected Year 2035)
SR 70 Traffic Impacts(projected Year 2035)
-13%-13% -10%-10% -46%-46%-17%-17%-16%-16%-17%-17%-8%-8%
13,000 / 10,80013,000 / 10,800
What Next?What Next?
• Organization of stakeholders
• Regional growth vision
• Environmental stewardship plan
• Protection of corridors
• Organization of stakeholders
• Regional growth vision
• Environmental stewardship plan
• Protection of corridors
Heartland Coast-to-CoastCorridor Study
___________________
Presented Sept. 11, 2007Sanibel Harbour Resort Spa
Heartland Coast-to-CoastCorridor Study
___________________
Presented Sept. 11, 2007Sanibel Harbour Resort Spa