HEALTH SAFETY ENVIRONMENT QUALITY
A fresh perspective on building
2015
The company monitors and measures all aspects of its health, safety and environmental management performance. We are committed to ensuring the health and safety of everyone involved in our projects, protecting the natural environment throughout all of our operations, and encouraging a culture where we can continue to improve our overall business performance.
HEALTH SAFETY ENVIRONMENT QUALITY
Accreditations
→ OHSAS18001→ ISO14001→ ISO9001→ Safe-T-Cert→ Chas → SSIP→ CIOB → Investors in People→ Workplace Health & Wellbeing Pledge → CORE Standard → Chartered Building
Company → Royal Institute of
Chartered Surveyors (RICS)
→ Construction Line → ISO9001→ ISO14001→ OHSAS18001
MARK OFAPPROVAL
AccidentFocus→ Manual handling→ Scaffolding → Temporary hand rails→ Manual handling of plaster board→ Working at height → Slips trips & falls
SiteManagementFocus→ Induction process→ Corporate branding→ FEE compliance → Pile cropping→ Fire Safety & Fire Marshal
Duties → Dust suppression & silica dust → Asbestos awareness
Training→ Skin health management → Behavioral safety → Silica & dust management → CDM Regulations 2015→ Men’s health & wellbeing → HAV’s→ Alcohol & drugs awareness
Health & Safety Management 2015
HEALTH & SAFETY
AVERAGE SITE
PERFORMANCE
KPI FOR 2015
86%
2015
Gilbert-Ash and Whitbread Hotels & Restaurants picked up a golden Green Apple at the 2015 Green Awards for integration of climate adaptation measures at the Premier Inn at Worcester Cricket Club.
Find out more about this project by clicking this link: www.bitcni.org.uk/casestudy/climate-adaptation-in-action-at-worcester-cricket-club-premier-inn/
Environmental Management Performance Statistics
ISO14001Company has implemented the International Environmental Management System ISO14001
ENVIRONMENTAL
91%Waste divertedfrom landfill 2015
2015 Total Waste Arising %
52% Excavation33% Demolition15% Construction
2015 Total Waste Diverted from Landfill %
15% Construction
52% Excavation33% Demolition
2015 Main Waste Materials
In addition the following carbon reduction initiatives are in place within the company:
Bike to Work Scheme
→ Hardcore→ Bricks→ Concrete→ Inert→ Insulation→ Metals
→ Packaging→ Plasterboard→ Plastic→ Timber→ Mixed C&D
2015 & Breakdown of CO2 Emissions
2015 Carbon Footprint % breakdown
Office Electricity 9%
Projects Electricity 48%
Diesel (Plant) 33%
Gas (Projects) 0.05%
Water (Projects) 3%
Transport (Projects) 7%
CLIMATE ADAPTATION AT WORCESTER CRICKET CLUB PREMIER INN CASE STUDY
Four electric vehicle charge points have been installed at Head office to facilitate those employees driving an electric or hybrid vehicle.
Electric vehicle charge points installed at head office charge points
REQUEST FOR FURTHER INFORMATION / CONTACT DETAILS
If you require further information or would like to discuss our approach to Health, Safety & Environmental initiatives please get in touch: