Republic of the PhilippinesAutonomous Region in Muslim MindanaoDEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENTPANTAWID PAMILYANG PILIPINO PROGRAMBrgy.Semba, Datu Odin Sinsuat, Maguindanao

ACCOMPLISHMENT REPORT MAY 2013

DatePlace VisitedActivities ConductedRemarks/Output

May 1-3 2013RESWADMonitored network error-no error or bugs detected in the database.-slow connection of the internet due to the poor signal given by the pldt.

May 6-10, 2013RESWADSpliting of ARs and burning into CD Meeting with mayor Mussah Muksan of Siasi regarding the Sabah Displaced Families.

Presentation of Mcct on how to cater the Displaced Families in the Municipality of Siasi.

The mayor of Siasi also consults how other poor families can avail the Mcct program

Sept. 5, 2013Provincial Capitol, Patikul, SuluPresentation of MCCT program to the Governor The National Program Management Office presented the overview of Modified Conditional Cash Transfer for the Sabah Displaced.

The RPMO team introduced the Biometric system to be in the Sabah Displaced Families for the their data capturing

Sept. 6-7, 2013Santanina Covered Court, Jolo, SuluBiometric Enrollment Served the Sabah Displaced Families in the Biometric Enrollment.

180 Beneficiaries enrolled in the first day of Biometric Enrollment.

On the second day of Biometric enrollment 20 beneficiaries were Registered in the system.

Facilitate other concerns of the beneficiaries

Sept. 8-9, 2013Jolo Siasi

Travel from Jolo to Siasi The NMPO and RMPO team traveled to the Municipality of Siasi, Sulu to cater the Sabah Displaced Families.

21 beneficiaries were enrolled in the Biometric including the nearby Municipality which is Pandami.

Sept. 10-16, 2013Siasi JoloTravel from Siasi to Jolo Traveled back to Jolo to cater the remaining Beneficiaries who did not come during their Scheduled time.

Consolidation of the report gathers during the Biometric Enrollment.

The NPMO, RMPO and POO team Meeting for the next step of Biometric Enrollment.

Sept. 17-28, 2013RESWADSupervised Supervised the encoder in the encoding of the updates.

Consolidate the output of the data encoder per day.

Sept. 29-30, 2013RESWADSplitting of ARs Split the period 4 Ars per Province and per Set.

Prepared by:Noted by:

MENNALDZ A. AMLHASANNIDA O. IBOT, RSWCMT II4ps Deputy Program Manager