Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Maximize your plant energy efficiency by deploying "Quick Win" solutions
Energy Management & BeyondHaytham Amin
15-17 May 2017
1
Solution
Landscape
Objectives
Engagement
Model
Objectives
2
Modernization Program Initiatives
3
© 2016 by Honeywell International Inc. All rights reserved
Streamline current concession processes and
expand concession agreement portfolio
Investment
Attraction
Structuring
Reform
Create single SOE coverage across the value chain,
and rationalize portfolio of both operations and
companies involved in the Egyptian industry
People AgendaIntroduce comprehensive talent management
system and redeploy people to drive efficiency
Downstream
Optimize downstream and petrochemical sourcing,
output and mass balancing. Drive operations
performance transformation
Upstream Drive operations performance transformation
Regional Oil &
Gas Hub
Optimizing and leveraging existing oil and gas
transport and storage infrastructure
The country’s vision is for the oil
and gas sector to continuously
unlock the sector’s full value
chain potential as a growth and a
sustainable development engine
for Egypt to achieve financial
sustainability, become regional
oil and gas hub and a role model
for the future of modernized
Egypt by 2021
Org
aniz
ation H
ealth
Perf
orm
ance
Process Optimization & Energy Efficiency – Downstream
4
© 2016 by Honeywell International Inc. All rights reserved
Process Performance
Maximize yield
Reduce specific raw material consumption
Minimize waste
Minimize Energy Cost
Real-time optimization
Demand forecasting
Utility production planning
Performance Management
Continuous monitoring of Key Performance Indicators (KPIs)
Economic indicators of improvements and deviations
Collaboration platform across entities to streamline data flow
Energy Efficiency
Minimize specific energy consumption
Reduce emissions
Equipment Performance
Maximize equipment efficiency
Early detection of faults
Honeywell proposition
5
© 2016 by Honeywell International Inc. All rights reserved
• Our value proposition
- focus on Process Performance & Energy Efficiency
• Objective
- implementing low cost solution in short time period with significant ROI
• Approach
- based on technology deployment of predictive controls and not mechanical modifications
• Result in
- quick wins that build the trust to the leadership and provides funding for further improvements
Solution
Landscape
6
Business Processes
Utilities
Scheduling
Production
Planning
Real-Time
Optimization
& Control Production
Scheduling
weekly
Business targets
Scheduling targets
Utility Plant
Process Plant(s)
Energy
& Process
Monitoring
Current objectives
Set pointsobjectives
Set pointsobjectives
Current objectives
• OFF LINE optimizer for industrial power
plant (MINLP Solver)
- Resource allocation planning
fuel, equipment
- Optimal plant configuration planning
Boilers, Turbines, Feed pumps
- Optimal production planning
Electricity, Export steam
• Find and plan the best plant configuration
for forecasted steam demand and power
production.
Utilities Scheduling
Utilities Scheduling
Cooling demand
Power demand
Steam demand
Refining & Petrochemicals Management System (LP Models)Power price
Gas price
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
CHP2_1
CHP1_1
elin_1
CASE I
0
200
400
600
800
1000
1200
1400
1600
1800
2000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
CHP2_1
CHP1_1
elin_1
CASE II
Gas Turbine 2 generation
Purchased power
Gas Turbine 1 generation
0
100
200
300
400
500
600
1 25 49 73
B4_1
B3_1
B2_1
B1_1
Static optimizer resultsdetermines a production schedule in the neighborhood of maximal system efficiency, disregarding costs of unit starts.
0
100
200
300
400
500
600
1 25 49 73
B4_1
B3_1
B2_1
B1_1
VERA Optimizer resultsVERA recommends realistic solutions that include start-up costs and optimize fuel selection.Inappropriate unit switching does not happen.
Complex unstable situation –switching cannot be resolved
by operators optimally
Optimal schedule is realistic and immediately
applicable
Boilers operation
Optimal Schedule for Boilers
Utilities Modelling
Plant scheme
Software model
Business Processes
Utilities
Scheduling
Production
Planning
Real-Time
Optimization
& Control Production
Scheduling
weekly
Business targets
Scheduling targets
Utility Plant
Process Plant(s)
Energy
& Process
Monitoring
Current objectives
Set pointsobjectives
Set pointsobjectives
Current objectives
• ON LINE closed loop optimization for
industrial power plant
- Advanced Process Control (specially built for
IPP)
- Optimization in real time under constraints for
given plant configuration
- Continuous balance between produced vs.
consumed utilities
- Reduce fuel consumption
- Stabilize emissions
• Economic optimization to minimize
production cost and maximize profit
Utilities Real-Time Optimization – drive energy efficiency
Utilities Real-Time Optimization
• Economic load allocation for overall demands
• Optimal schedule to meet demands at lowest cost
• Ensures economically efficient operations
• Real-time power generation vs consumption monitoring
• Total generation prediction and trajectory optimization
• Real-time Optimization of power generation
• Advanced predictive control to stabilize steam pressure
• Guarantees continuous balance between produced and consumed steam
• Advanced control of combustion process
• Tightly control fuel and air ratio
• Multiple fuel co-firing
• Reduces fuel consumption & stabilizes emissions within given limits
ACC MPC
ELATRGO
Advanced Combustion Controller - ACC
• Objectives:
- Closely follow the released heat/fuel
demand trajectory computed by ELA
Needed for maintaining stable steam
pressure
Released heat demand replaces fuel
demand for multi-fuel boilers and for
CFB boilers
- Adjust combustion air to maintain the
optimal air/fuel ratio trajectory
computed by ACC optimizer
Ratio optimized for max combustion
efficiency while keeping risks of
exceeding emission limits small
EL
A-B
ACC
coordinator
ACC
optimizer
MPC
ACC
coordinator
ACC
optimizer
ATC
ATC
To
tal fu
el
de
ma
nd
Steam pressure /
steam flow from Hp header
fuel
demand
fuel
demand
O2, CO, NOx
O2, CO, NOx
A/F
A/F
Air & Fuel SP
Air & Fuel
Air & Fuel
Fu
el
Fu
el
Wate
r
SP
Wate
r
SP
Ste
am
tem
p/f
low
Noticeable Transformation – Utilities Optimization
16
Air/Fuel ratio histogram, representing boiler combustion quality
BEFOREAFTER
Industrial Power AES
• Master Pressure Control - MPC
- Control steam networks balances + estimate
unknown disturbances
• Economic Load Allocation - ELA
- Steam/Power optimization
Produce planned energy with minimum costs
Maximize energy production
Under constraints
• Cases
Produce given process steam and planned
MWe with minimum costs
Maximize MWe while process steam demand
satisfied
90 100 110 120 130 140 150 160 170 180
20
25
30
35
40
45
50
Total steam flow
Ste
am
flo
w
Optimum allocation
A
B
C
D
• ON LINE closed loop optimization for
process plants
- Advanced Process Control techniques
- Maximize Yields
- Minimize specific consumptions of raw
materials
- Energy duty optimization
• Optimal compromise between yield
maximization vs. energy consumption
Real-Time Process Optimization
Layered Optimization
Profit Optimizer
Process
PVO OBJECTIVE FUNCTION
{PRODUCT VALUES, FEED COSTS, ENERGY COSTS, FEED LIMITS}
SS
Model
Profit
Bridge
Planning &
Scheduling
Furnace 6
Profit Controller
DC1
Profit Controller
DC2
Profit Controller
DC3
Profit Controller
C2S
Profit Controller
C3S
Profit Controller
Furnace 1
Profit Controller
Business Processes
Utilities
Scheduling
Production
Planning
Real-Time
Optimization
& Control Production
Scheduling
weekly
Business targets
Scheduling targets
Utility Plant
Process Plant(s)
Energy
& Process
Monitoring
Current objectives
Set pointsobjectives
Set pointsobjectives
Current objectives
• ON LINE real-time energy and process
efficiency monitoring
- Unified environment for Energy & Process
monitoring
- Identifying issues and opportunities as they
happen
- Detailed equipment monitoring to identify
reason for inefficiencies
- Monitoring your performance against
Dynamic targets
• Generating process intelligence & using
that intelligence to make effective decisions
Process & Energy Monitoring
© 2016 by Honeywell International Inc. All rights reserved.
Static Targets vs. Dynamic Targets
False targets won’t take you to right objectives
You could do better!Good job!Really…?Not really…
Green….. actuals
Red ........ static target (Statistical)
Blue ....... dynamic target (Dynamic)
Calculate actual energy use per unit/equipment (KEIs)
Calculate Tons or Steam/T production; GJ fuel/T production and MW Power /T production
Breakdown according to major units or items of equipment
Also calculate dynamic efficiency targets to provide guidance
Dynamic efficiency targets that help identify when and where Energy targets is being in deviation
Examples include targets for Excess Air; Stack Temp; Overflash; Reflux Ratio; Col Pressure; Off-gas vent; recycle ratio, etc
What Calculations are needed?
Refinery
Crude Unit FCCU Reformer
Preheat Furnace Tower
Fuel Steam Power KEIs
Furnace Inlet Temp
Furnace Excess Air
Furnace Efficiency
Furnace Stack Temp
Furnace Outlet Temp
Fuel LHV
Units and Equipment Models
Real-time Monitoring
25
© 2016 by Honeywell International Inc. All rights reserved
Embedded TrendPerformance Trends Equipment Status Displays
Labor Intensive / Periodic / Informal
Real-time vs. Ad-hoc
26
Tag, Lab & Other Data Reports
Tag Name Tag Desc.XUTT901.PV HE91 Shell In Temp
XUTT902.PV HE91 Shell Out Temp
Excel & Other Tools
Manually Search & Collect
Cumbersome Isolated Tools
Manual Periodic
Calculations
Informal Work Processes
T1 T2 T3
Blind Spots
Time Consuming Missed Opportunities
Difficult to Sustain
Varied Approaches & Results
Silos of Information
86.19
88
91.4
© 2016 by Honeywell International Inc. All rights reserved
27
© 2016 by Honeywell International Inc. All rights reserved
… AND BEYOND?
Enterprise Performance Monitoring
Business Processes
CollaborationAcross Functions
Management
Maintenance & Reliability
OperationsEngineering
Utilities
Scheduling
Production
Planning
Real-Time
Optimization
& Control Production
Scheduling
weekly
Business targets
Scheduling targets
Utility Plant
Process Plant(s)
Energy
& Process
Monitoring
Current objectives
Set pointsobjectives
Set pointsobjectives
Current objectives
Comprehensive metrics management solution drives actions!
Enterprise KPI Management
KPI Category
Number lost time accidents HSE
Number environmental issues HSE
Unit effectiveness Operations
Unit material balance Operations
APC constraints at limit Operations
Critical process parameters Operations
Alarm rate Operations
Unplanned downtime Reliability
Operating envelope exceptions Reliability
Variable cost Financial
Energy/ton of product Energy
Heater efficiency Energy
Quality giveaway Quality
KPI Categories
Safety
Operations
Reliability
Financial
Energy
Emissions
Personnel
Vision
Goals
Strategies
Objectives
KPIs
Metrics
Actions
Enterprise Dashboards
Rich and Interactive Dashboards
• Quickly perform data exploration, analysis and
visualization through highly performant
dashboards
• Advanced analytics with hierarchies and time
dimensions enabling powerful drill-downs and
multi-dimensional analysis
• Enable situational awareness using mobility
Engagement
Model
31
© 2015 by Honeywell International Inc. All rights reserved.
Additional Disclaimers As Needed (Consult Legal)
Replicate Common Standard Across Enterprise
Moving the needle via enterprise optimization
Optimization
across all Sites
Site Functional
Excellence
Corporate Roll-out
SMART Approach
How we Deliver
Validate Program
objectives
Developing top KPIs that
would be the main
success criteria
Defining competency
management framework
required to support the
vision
Phase 1Vision & Concept
Identify, quantify (ROI)
specific opportunities
Develop an ROI Based
Deployment Road-map
Phase 2Discovery Process &
Opportunity
Assessment
Develop solution, KPI
driven execution plan,
organization teams for
deployment.
Review/update business
processes (BPM)
Phase 3Quick Wins
(Low/No Cost
Opportunities)
Deployment of
technology with
transformed work
processes
Facilitate Change
management
Program management to
monitor progress, track
benefits
Phase 4Program Execution
Develop a Support
model (remote, site
visits) to assist in
ensuring continued
business results
Scheduled
audits/reviews of KPI
Performance based
support models
Phase 5Life Cycle
Management
34
Solution
Landscape
Objectives
Engagement
Model
© 2016 by Honeywell International Inc. All rights reserved
Digital Transformation to help improve
performance, availability, reliability and safety.
www.hwll.co/IIoT