HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER
ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT
OF THE ROAD, PROJECT CONSTRUCTED IN 1 DAY, MARCH 10, 2009
BY PIKE COUNTY PUBLIC WORKS DEPT, LaDON ATKINSON, ROAD
SUPERVISOR
HAW CREEKGENERAL INFORMATION
Bank erosion is threatening county road, threatening public safety
Stream wildly meandering in response to historic straightening
Decent riparian areas in places Bed material: gravel-sand. Channel is incised Pool-riffle-pool regime, slope less than 1% Average width 30-40 ft, 15 ft tall banks Funding, equipment, and manpower provided by
Pike County, MO
DIRECTIONS TO HAW CREEK, From Hwy 61 (Pike County, 15 miles south of Hannibal, MO), turn east on Rt. B, then left on Rt. 107. 3-4 miles
project is on the south side after a long straight section, then “S” bend.
Contact: Jaynie Doerr, regulatory, St. Louis Dist.
PRE-PROJECT PHOTOSby
JAYNIE DOERR, REGULATORY,
ST. LOUIS DISTRICT FEBRUARY 25, 2009
Looking US at the bend US of the project bend.
PRE PROJECT-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking DS @ the upper end of the project bend.
PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR 2-25-09
LOCKED LOGS
We utilized the two existing logs (next picture) that had fallen in by
placing them angled downstream and building the LPSTP on top to “lock”
the logs in place.
Looking DS @ the center of the bend & the threatened County Road 107, Pike County, MO. We used the two trees as Locked Logs.
PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR 2-25-09
Looking DS @ the lower end of the project bend
PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR 2-25-09
Looking DS @ exit conditions to the project bend
PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR 2-25-09
Looking US @ the project bend. Road is 4 ft from 14 ft tall eroding bank.
PRE-PROJECT - HAW CREEK-PIKE COUNTY MO. PIX BY JAYNIE DOERR 2-25-09
Down at the farm & feed store, education !!!!
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
CONSTRUCTION PHOTOS
by Dave Derrick, COE; Jaynie Doerr, COE; & Matt Methaney, MDC
MARCH 10, 2009
We have 500 willows, stone, diesel, equipment, and time on our hands! A dangerous combination!!
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Forest
Pike County Highway 107
The vertical eroding bank is 14 ft tall & 4 ft from the
shoulder of the road.
WE NEED SPACE!!!!
Haw Creek, MO Pre-project
Forest
Pike County Highway 107
110 ft of Longitudinal
Peaked Stone Toe Protection with
Single Stone Bendway Weirs
Haw Creek, MO. Highway protection plan
30 ft long vegetated key with soil cover
Straight vegged key
15 ft wide engineered floodplain bench with Living Dikes, poles, & Live Siltation
Pike County Highway 107
Haw Creek, MO. Highway protection plan
Self-Adjusting, Self-Filtering Stone Depending on size, angularity, and gradation, stone can be
neither, either, or both!! Self-Adjusting Stone:
Stone must be well-graded (from coarse to fine) so that it has the ability to "launch", or self-adjust into, and armor, scour holes formed on the streamward side, and/or stream end, of a river training structure.-Charlie Elliott says a good rule of thumb in Mississippi sand-bed streams {CAUTION: this might not apply equally well to every stream in the world} is that one ton of rock per linear ft will armor three ft of scour
Self-Filtering StoneA soil analysis should always be performed to
determine stability and erodability of bank materials and whether a filter material, (either granular or synthetic) is required.
A self-filtering stone that has worked well on the Mississippi River, and numerous other rivers and smaller streams (acting as a granular filter to prevent loss of underlying bank material) has 10% to 15% of the gradation either less that 4 inches in diameter, or less than one pound in weight, depending on how the stone is specified.
QUESTIONABLE STONE
Stone used for keys & LPSTP was a sub-standard shot rock of questionable hardness. The amount of fine material was close to 20-30%. This was a self-
filtering stone, but not well-graded, & not self-
adjusting.
Stone is not well-graded & too many fines. The stone is self-filtering, but not self-adjusting, but only $4.70/ton delivered.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
STONE COSTS However, the stone was extremely inexpensive. The 432 tons of rock
used in the project, at $4.70 per ton (delivered) total cost of stone =
$2032. That was very cost effective for what we accomplished.
THE PLAN
HAW CREEKMETHODS EMPLOYED
110 ft of Longitudinal Peaked Stone Toe Protection (LPSTP), crest built to 4 ft above the base flow water surface elevation
Locked Logs A vegetated floodplain bench Single-Stone & Short Bendway Weirs Live Willow Pole Plantings Vegetated & curved upstream key, straight DS key Living Dikes Slit Brush Layering (Joint Planting) in riprap bank Live Siltation
We will construct from
upstream (US) to
downstream (DS)
THE UPSTREAM
KEY
A KEY HAS ONE MAIN JOB, TO CONNECT THE
RIVER TRAINING STRUCTURE TO THE REST
OF THE WORLD (DON’T LET THE STREAM GET BEHIND {FLANK} RIVER TRAINING STRUCTURES)
THE STEP-BY-STEPS FOR HAW CREEK,
TRIB. TO SALT RIVER, PIKE
COUNTY, FRANKFORT, IOWA
All drawings by Dave Derrick
Detail for key
Cross-section for keywayFlow
Looking DS at hoe digging the upstream key.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking DS. Setting topsoil aside for use as backfill topping
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Place Willow Poles against the DS side of the trench
Detail for key
Flow
Looking DS. Placing willow poles against the DS side of key trench.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Place stone in trench
Detail for key
Flow
Choke stone with gravel (white areas) & water in.
Detail for key
Flow
Looking DS. Placing stone and creek gravel choke in US key trench.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Backfill and overfill with native soils, then compact
(some settling will still occur)
Detail for key
Flow
Looking DS. Backfilling key with quality top soil.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Hydro seed
DONE
Detail for key
Flow
LONGITUDINAL PEAKED
STONE TOE PROTECTION
(LPSTP)
ENHANCED LONGITUDINAL PEAKED STONE TOE
PROTECTION (LPSTP) WITH SINGLE-STONE BENDWAY WEIRS, LOCKED LOGS, SOIL CHOKING,
LIVE SILTATION, POLE PLANTINGS, LIVING DIKES,
ROOTED – STOCK PLANTS, & A FLOODPLAIN BENCH
Stream channel
Top bank
Eroding bank
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
Road
“Locked Logs” placed on bed of river for improved aquatic habitat & energy dissipation. Locked Logs should be angled downstream 25 to 35 degrees so as to shed debris.
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
Road
LONGITUDINAL PEAKED STONE
TOE PROTECTION {LPSTP} Description: A continuous stone dike placed
longitudinally at, or slightly streamward of, the toe of the eroding bank. Cross-section is triangular. The LPSTP does not necessarily follow the toe exactly, but can be placed to form a "smoothed" alignment through the bend. Smoothed alignment might not be desirable from the environmental or energy dissipation points of view . Amount of stone used (2 tons/linear ft, 1 ton/ft, or less) depends on depth of scour at the toe, estimated stream forces (impinging flow) on the bank, and flood durations and stages.
Tie-backs are short dikes connecting the LPSTP to the bank at regular intervals. Tie-backs are usually the same height as the LPSTP or elevated slightly toward the bank end, and are keyed into the bank. If tie-backs are long they should be angled upstream to act as bendway weirs.
Longitudinal Peaked Stone Toe Protection (LPSTP)
As-built
After a couple of high flow events stream has scoured at the
toe & stone has self-adjusted
Sediment has deposited landward of the LPSTP
Locked Logs are then “locked” under the Longitudinal Peaked Stone Toe Protection (LPSTP).
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
Looking US @ completed US key. Forming stone into Longitudinal Peaked Stone Toe Protection (LPSTP)
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking US. LPSTP crest is 4 ft above base flow stage
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
Tree or shrub poles (called Live Siltation)
installed on top of LPSTP
Willow, dogwood, river birch poles can then be laid on the stone and up against the bank. Basal ends should be in vadose
zone (capillary zone). Willow used on this project.
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
Live Willow poles were then laid up against the eroded bank
Looking DS. Class laying willow on LPSTP & against bank.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DOERR 3-10-09
Looking US. Class laying willow poles against eroding bank.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking US. LPSTP with willow on both sides of floodplain bench.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking DS. Derrick teaching during construction
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DOERR 3-10-09
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
Backfill material from point bar to form a floodplain bench at the Q-2 flood elevation
Looking DS. Backfilling between LPSTP & bank to form floodplain bench @ the Q-2 elevation.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
LIVING DIKES are dense rows of deep-planted adventitious
rooting poles oriented perpendicular to the direction of high flow
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
At intervals, install willow Living Dikes (densely deep-planted adventitious poles perpendicular to direction of high flow)
Floodplain bench
planted on a grid
patternF
low
AERIAL VIEW OF ENHANCED LPSTP WITH A FLOODPLAIN BENCH WITH VEGETATION PLANTED ON
A GRID PATTERN.
Living Dikes-plants
perpendicular to flow
Live Siltation
Live Poles
Looking US. Willow poles on bank (part of the floodplain bench) near the road we are protecting
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking US. Installing Living Dikes perpendicular to high flow, Live Siltation & Live Poles are parallel with the stream.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
A Living Dike (perpendicular to high flow) on the floodplain bench.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking US @ the completed Floodplain bench.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking DS. Nice S-shaped creek alignment.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
ENHANCED LONGITUDINAL PEAKED STONE TOE PROTECTION (LPSTP)
Install appropriate rooted-stock plants on the floodplain bench & seed and
mulch, or hydro-seed.
Floodplain bench will be seeded and mulched, & rooted-stock plants added shortly.
Looking US. Raining & but we still building & teaching
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Flo
w
AERIAL VIEW OF ENHANCED
LPSTP WITH SINGLE- STONE
BENDWAY WEIRS, & A
FLOODPLAIN BENCH. NOTE ROAD IS ONLY
4 FT FROM BANK
Single-Stone Bendway Weir
Single-Stone Bendway Weir
Looking from top bank. Placing a Single-Stone Bendway Weir (SSBW) against the LPSTP. SSBW were spaced 20-25 ft apart.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking from top bank. Single-Stone Bendway Weirs
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking US. Single Stone Bendway Weirs will move thalweg from toe of LPSTP out to the ends of the SSBW’s
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking US @ Single Stone Bendway Weirs, LPSTP, & Live Siltation, the US key, & floodplain bench.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
JOINT PLANTING IN EXISTING RIPRAP The county got a little ahead of us by placing
riprap against the bank @ the DS end, so we left it, but I wanted to show how
hard it was to vegetate that new existing riprap.
Looking DS. LaDon grabbing poles, some poles in.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
Looking DS. Track hoe had a very hard time digging & raising stone a few inches to insert the willow stakes.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Looking DS. Hoe had a very hard time digging in & raising stone so stakes can be inserted into the riprap
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Looking DS. Row of willow stakes have been inserted into the riprap bank. It was hard to do.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX BY DERRICK 3-10-09
THE DOWNSTREAM
KEYIn this case the key is
vegetated & parallel to the bank so that flow will not
cross and erode the opposite bank.
Look sideways @ the downstream key with live poles.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Looking US @ the downstream key.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
PROJECT CONSTRUCTED
IN 1 DAY, MARCH 10, 2009
PROJECT COMPLETE
LOOKING FROM UPSTREAM TO DOWNSTREAM
Looking DS @ entrance conditions to the project bend.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Looking DS. SSBW, LPSTP, 500 willows, floodplain bench
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Looking DS @ floodplain bench, willows, LPSTP, SSBW.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Looking DS. Note straight exit flow does not adversely affect DS opposite bank.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
PROJECT COMPLETE
LOOKING FROM DOWNSTREAM TO UPSTREAM
Looking US@ floodplain bench, willows, LPSTP, US key, & US bend.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Looking US @ flow attack angle into project bend.
CONSTRUCTION-HAW CREEK-PIKE COUNTY, MO. PIX-METHANEY 3-10-09
Bank Protection redundancy:
Fully functioning both hydraulically & environmentally. Multiple protection redundancy. LPSTP provides a robust, adjustable, direct armor bank toe protection. Single-Stone Bendway Weirs move scour & thalweg away from attacked bank, with velocities reduced within weir field. Locked Logs & vegetation roughness reduces near-bank velocities. Roots strengthen bank & bind soil. Floodplain bench plantings reduce flow velocities, provide stability & a continuous riparian corridor.
Stream Project Functions: LPSTP provides scour protection at toe Integrated Live Siltation provides vegetative roughness, increases
height of protection “soft protection”, shades stone & water, & has many wildlife functions {everything from carbon input to structure cover to insect production, beneficial to pollinators, etc.}
Vegetation on bank planted to slow floodwaters, capture alluvium, colluvium, woody debris, carbon, and native seed.
Bendway Weirs increase stream roughness, provide mini pool-riffle-pool sequences, reduce toe scour, & provide diversity & complexity of depth, velocity (horizontal & vertical) & substrate, & move the thalweg away from the toe of the eroding bank
Integrated Locked Logs dissipate energy, reduce near-field scour, provide toe protection & aquatic habitat complexity
Container plants on bank & overbank (to be added soon) will provide a diversity of plant species for fully functioning riparian corridor.
LESS THAN 2 MONTHS AFTER
PROJECT COMPLETION Looking US to DS
Photos by LaDon Atkinson MAY 4, 2009
LaDon Atkinson, Pike County Road Supervisor says “The veg is looking
great! This little creek has been hammered with water. We have had
several rains and the last one was 3.5" in a couple of hours. The water
has been on the floodplain bench 3 or 4 times now, notice all the sediment
that has dropped out.”
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking DS @ LPSTP, Bendway Weirs, poles & floodplain bench.
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking DS @ willow poles in US key
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Close-up looking DS @ willows in US key
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking DS @ the floodplain bench (overtopped 3 times in 2 months)
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Deposition on floodplain bench from being overtopped 3 times in 2 months
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking DS @ section of project parallel with road.
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
From road looking DS @ project.
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking downhill @ Slit Brush Layering in riprap bank
LESS THAN 2 MONTHS AFTER
PROJECT COMPLETION
Looking DS to US. Photos by LaDon Atkinson
MAY 4, 2009
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking US @ entire almost the entire project.
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking US @the floodplain bench. Note deposition on bench.
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking US @ the upper end of the project.
2 MONTHS LATER-HAW CR.-PIKE COUNTY, MO PIX-ATKINSON 5-4-2009
Looking US @ flow into project & floodplain bench
4 MONTHS AFTER PROJECT
COMPLETION Looking US to DS Photos by LaDon
Atkinson JULY 11, 2009
4 MONTHS LATER-Looking DS @ the project bend.
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking DS @ the US key. Great willow growth
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking DS @ key, floodplain bench, & LPSTP
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking DS @ the thalweg trace, LPSTP, Single Stone Bendway Weirs & the floodplain bench.
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking DS @ LPSTP & Slit Brush Layering in riprap
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
After 4 months, great growth from the 500 willows we planted!
LaDon says the floodplain bench has
about 6 inches of sediment deposition on it.
4 MONTHS LATER-Looking DS @ floodplain bench
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking DS @ Slit Brush Layering in riprap
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS AFTER PROJECT
COMPLETION Looking DS to US Photos by LaDon
Atkinson JULY 11, 2009
4 MONTHS LATER-Looking US @ thalweg, SSBW & LPSTP.
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking US @ SSBW, LPSTP & Live Siltation
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-From top bank looking US @ project bend
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking US @ project & road
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking US-close-up of floodplain bench. Fantastic growth & great hydraulic roughness.
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
4 MONTHS LATER-Looking US @ a Living Dike on the floodplain bench
4 MONTHS LATER - HAW CREEK–From LaDon Atkinson-7-11-09
Haw Creek Project
April 20, 2010 PhotosOne Year After Completion
By Jaynie Doerr, Regulatory,St. Louis District, U.S. Army Corps of Engineers
Looking DS
Look at that Veg!
Busy Beavers
Looking US
Drainage Just DS of Project
Haw Creek Project (5 inch rain 48 hours prior to photos)
September 20, 2010Two Growing Seasons After Completion
Photos By Rob Gramke, Regulatory,St. Louis District, U.S. Army Corps of Engineers
Looking upstream from road
Sep 2010-notice how wide the shoulder appears now
March 2009-bank 4 feet from road
Looking upstream
May 2009
April 2010
Looking upstream – September 2010
Looking downstream
March 2009
September 2010
Looking downstream from left descending bank. The vegetation has almost completely grown over the rock – Sept 2010
From the road-notice height of willows (Sept 2010) These are happy willows!
Rock toe & short Bendway Weirs
Locked log still in place
This PowerPoint presentation was developed & built by Dave Derrick.
Any questions or comments, call my personal cell @ 601-218-7717, or email @ [email protected]
Enjoy the information!!
Bad dog & sneering babyCLEOPHUS & PEYTON
1947 Wurlitzer & Cleophus Speed Elvis Derrick