HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018

Community Board 2 – Working Group Presentation

Page 2: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

HAVE N G R E E N: AGE NDA

HPD Introduction (5 Minutes)• Review purpose of presentation • Provide brief description of Land Use Actions• Provide brief description of Environmental Review• Introduce development team

Development Team Presentation (20 Minutes)• Project Overview• Land Use and Zoning analysis• Design Features• Participatory Design & Community Engagement

Question & Answer Period Led by CB2 • CB2 Board Members• Audience

Page 3: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

HAV E N G R E E N: H P D OVE RVI E W

• Background/RFP Process• Land Use Actions• Environmental Review

Page 4: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

• Lead developer

• Local office with activity across New York City + State

• 45+ years of experience in 16 states and DC

• 16,000 units developed in 200+ properties

• Co-developer, supportive service provider and property

manager

• 40+ years of experience in NYC, beginning in 1973

• 3,000+ units developed, 2,000+ currently managed

• Co-developer and ground floor tenant

• 30+ years of experience in NYC

• Hundreds of affordable homes built and preserved

• History in the community, beginning with Mascot Flats

HAV E N G R E E N: D E VE LO P M EN T TEA M

Page 5: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

The shortage of high-quality affordable housing is a crisis abound in NYC. It traverses neighborhood lines and affects New Yorkers of all colors and creeds.

Accessible, safe, and well maintained public space are essential components of vibrant and healthy urban environments.

Well capitalized and engaged community facilities promote the health and well-being of their constituents, and celebrate the inimitability of those who otherwise go unnoticed.

Neighborhood retail activates street fronts, contributes to the local economic base, and enlivens street life.

HAV E N G R E E N: P ROJ EC T P RO GRA M S

123 affordable rental Senior Residences

8,400 GSF of

Public Space

(6,700 GSF open to sky1,700 GSF covered space)

15,600 GSF of

Community Facility & Retail Space

Page 6: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

• Affordable housing is part of the bedrock of what makes New York City work. And yet today, we face a crisis of affordability.

• In CB2 alone, there are 4,600 seniors awaiting affordable housing. Average wait time is currently 7 years.

• Since 2014, only 93 new units of affordable housing have been constructed in all of CB2.

• The designated site for Haven Green is the only currentlydevelopable site within CB2 that is controlled by HPD.

• Fair and equitable housing policy calls for all community districts, and all neighborhoods, to participate in alleviating the affordability crisis.

Housing NYC projects located in CB2

HAVE N G R E E N: P ROJ EC T P RO GRA MAFFORDABLE HOUSING FOR SENIORS

Page 7: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

SUPPORTIVE SERVICES + LGBTQ FRIENDLY

Senior housing coupled with integral on-site supportive services tailored to both an aging and LGBTQ population to foster housing security and stabilization, community building and quality of life.

RiseBoro, Habitat for Humanity NYC and Services and Advocacy for Gay Elders (SAGE) will work as service providers and community service facilitators to all building residents.

HAVE N G R E E N: B E YO ND H O U S I NG

Source: LiveOn NY

Entitlement Advocacy• Ongoing case management• Healthcare & other benefitsWellness• Yoga, Tai Chi and Zumba classes• Fostering self-sufficiency • Gardening classes• Monthly social events• Maintaining optimal healthConnectivity• Computer classes• Educational programming

Source: LiveOn NY

Page 8: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

• 100% of units with incomes at or below 60% AMI

• 80% of units with incomes at or below 40% AMI

• 30% of units set-aside for formerly homeless tenants with supportive services provided by RiseBoro

HAV E N G R E E N: A F FO RDAB IL ITY

Number of Units AMI Rent Income

37 < 30% Formerly Homeless

35 30% $401 $18,774

25 40% $558 $25,032

26 60% $871 $37,548

Figures above use the 2018 AMI for NYC and assumes a household of 1 person, with a household factor of 0.6 per HPD guidelines.

Page 9: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

Site Location

Park

Museum

Library

Church

CitiBike

Health Center

Supermarket

Community Center

Soccer Field

Basketball Court

Community Garden

Subway Station (J, Z)

Subway Station (6)

Subway Station (F)

Subway Station (R,W)

Bus Stop

Building Height

Street Direction

Map LegendHAV E N G R E E N: S I TE A N A LYSI S

Page 10: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

Compliant with Existing Zoning

• Borough: Manhattan

• Block: 493, Lot: 30

• Lot Area: 20,045 SF

• Little Italy Special District Preservation Area “A”

• Zoning: C6-2

• Permitted FAR: 4.1

• Permitted Height: 7 Stories

• No Zoning Bonus Being Sought

• Open Space will not be POPS

(MAP 12C)

HAV E N G R E E N: E X I ST I N G ZO N I N G

Page 11: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

RESIDENTIAL – 77,600 SF

• 123 New Affordable Housing Units for Seniors

• Common Laundry Facilities on each floor

• 1,100+ SF Common Room

• 1,600 SF Exterior Terrace for Residents

• 300 SF Supportive Service Space

• 540 SF Case Manager Office

• Passive House Design for Energy Efficiency

COMMERCIAL – 4,400 SF

• Partitioned into Small-Scale Retail

COMMUNITY FACILITY – 11,200 SF(5,200 SF at Street Level)

• Habitat for Humanity NYC

• 600+ SF Meeting Room Available to Neighborhood Groups

HAV E N G R E E N: B U I L D I N G F EATU R ES

Page 12: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

ELI

ZA

BE

TH

ST

RE

ET

COMMERCIAL SPACES

COMMERCIAL SPACE

RES.LOBBYHABITAT FOR

HUMANITY NYC

MEETING ROOM AVAILABLE TO

NEIGHBORHOOD GROUPS

COMMERCIAL ENTRIES

RESIDENTIAL ENTRIES

COMMERCIAL ENTRY

BREEZEWAY / PUBLICLY ACCESSIBLE OPEN SPACE ENTRY

COMMUNITY FACILITY ENTRY

HAV E N G R E E N: G RO U N D F LO O R B LO C K I N G P L A N

Page 13: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

Zoning Compliance

• Consistent with Zoning Regulations, including Little Italy Special District Requirements

• Design Reviewed and Certified by DCP

• Height restricted by Little Italy Special District Requirements

HAV E N G R E E N: ZO N I N G A N A LYS IS

AXON DIAGRAM

PLOT PLAN

Page 14: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

• Designed for functionality of outdoor public space

• Building sited at north/east portion of site for solar exposure to outdoor space

• Public access from both Mott Street and Elizabeth Street

HAV E N G R E E N: S I TE L AYO U T

Page 15: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

PUBLIC ACCESS to Open Space

PUBLIC ACCESS to Open Space

2ND FLOOR – Resident Access

MAXIMIZE Access to Sunlight

HAV E N G R E E N: S I TE L AYO U T

Public PARTICIPATORY DESIGN of Open Space

Page 16: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

ILLUSTRATIVE RENDERING FACING ELIZABETH STREET

HAV E N G R E E N: I L LU STR ATIV E R E N D E R IN G S

Page 17: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

ILLUSTRATIVE RENDERING AT PUBLIC BREEZEWAY ENTRY

HAV E N G R E E N: I L LU STR ATIV E R E N D E R IN G S

Page 18: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

ILLUSTRATIVE RENDERING AT PUBLIC BREEZEWAY - LANDSCAPE DESIGN TO BE UPDATED WITH COMMENTS FROM PUBLIC DESIGN AND REVIEW PROCESS

HAV E N G R E E N: I L LU STR ATIV E R E N D E R IN G S

Page 19: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

ILLUSTRATIVE RENDERING OF PUBLIC OPEN SPACE & MOTT ST ENTRANCE - LANDSCAPE DESIGN TO BE UPDATED WITH COMMENTS FROM PUBLIC DESIGN AND REVIEW PROCESS

HAV E N G R E E N: I L LU STR ATIV E R E N D E R IN G S

Page 20: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

Charrette exercise during participatory design meeting Group discussion during design charrette

Participants discuss design ideas Design meeting #1

HAV E N G R E E N: PA RTI C I PATO RY D ES IGN OVE RVI E W

Page 21: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

Community Outreach & Participatory Design

May / June

• CB2 Working Group Presentation

• Introduce Team and Project to Community

April / September

• Grassroots Relationship-building meetings and

participation in garden activities

• Smaller meetings between Dev. Team and community

stakeholders

September – Participatory Design Meetings

• Design Meeting 1: 9/5/2018

• Design Meeting 2 (YMCA): 9/12/2018

• Design Meeting 3: 9/15/2018

• Design Meeting 4: 9/24/2018

1500 FLYERS distributed throughout neighborhood.

850+ EMAILS to community contacts for each of the 4 design meetings.

Local gardeners we met during outreach

HAV E N G R E E N: CO M M U N I TY E N GAGE M E N T

Page 22: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

PREFERENCE BOARDS

Preference board data on plants from the Participatory Design Report

Completed preference boards

Participants working with preference boards

HAV E N G R E E N: PA RTI C I PATO RY D ES IG N

Page 23: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

STORYTELLING

Stories from participants Stories from participants

HAV E N G R E E N: PA RTI C I PATO RY D ES IGN

Page 24: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

DESIGN CHARRETTES

Word mapping from the design charrettes

A facilitator sketches participant ideas

Participants discuss design ideas during a design charrette

HAV E N G R E E N: PA RTI C I PATO RY D ES IG N

Page 25: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

SURVEYS

Sample survey results from Participatory Design ReportSample survey page

HAV E N G R E E N: PA RTI C I PATO RY D ES IG N

Page 26: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

WHAT WE LEARNED

Conclusions of the participatory design process

Conclusions of the participatory design process

THE FULL PARTICIPATORY DESIGN REPORT IS AVAILABLE AT:

https://www.havengreencommunity.nyc/

HAV E N G R E E N: PA RTI C I PATO RY D ES IG N

Page 27: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

NEXT STEPS

PUBLICLY ACCESSIBLE OUTDOOR SPACE

PUBLICLY ACCESSIBLE BREEZEWAY

HAV E N G R E E N: PA RTI C I PATO RY D ES IG N

SITE DESIGN TO BE INFORMED BY THE PUBLIC PROCESS

Page 28: HAVEN GREEN OVERVIEW - DECEMBER 5th, 2018 Community Board ... · CB2 Working Group Committee Presentation –December 5th, 2018 Site Location Park Museum Library Church CitiBike Health

PENNROSE, LLC | RISEBORO COMMUNITY PARTNERSHIP | HABITAT FOR HUMANITY NYC

CURTIS + GINSBERG ARCHITECTS LLP | PAUL A. CASTRUCCI ARCHITECT | MELILLO + BAUER ASSOCIATES INC

CB2 Working Group Committee Presentation – December 5th, 2018

-

Thank you For more information on Haven Green please visit: