Original ConstrucƟon Date: 1970 Total Gross Square Feet: 317,071 SF Student Enrollment 2015: 827 School ConstrucƟon Budget: $26,952,210 Percent of ConstrucƟon Budget: 50% Interior space / classroom improvements: 42,200 sq. Ō. addiƟon to include new performing arts center, band & choir rooms along with support spaces for the performing arts center Remodeling of oce area to create a secure entry into the building Remodeling as needed for ADA compliance Remodeling/upgrades to the Media Center, Science Labs, Cafeteria, Servery and Computer Labs Replacing classroom casework; furniture; ceiling Ɵles; ooring and lockers as needed InformaƟon Technology: Technology to include improved security surveillance systems; improved communicaƟon sys- tems, new technology equipment, and improved infrastructure to support technology iniƟaƟves. Mechanical / Electrical improvements: Mechanical improvements include replacing heaƟng, venƟlaƟng, and air condiƟoning systems in the 1970 building to improve energy eciency and air quality; providing air condiƟoning where appropriate and designing the system to allow for air condiƟoning in the future; replacing the exisƟng steam boilers with new high eciency hydronic boilers and piping; replacing tempera- ture controls to improve energy eciency. Electrical improvements include providing addiƟonal power and data capabiliƟes at classrooms; upgrading the power system throughout the 1970 building; replacing lighƟng and installing occu- pancy sensors to improve energy eciency and to enhance the learning environment; upgrading the re alarm system, emergency lighƟng system, emergency generator, and exit signs to im- prove safety; replacing the exisƟng clocks with a wireless clock system; replacing exterior build- ing and site lighƟng to improve safety. HasƟngs High School

Hastings schools building projects

Embed Size (px)

DESCRIPTION

Proposed projects at Hastings Area School System if a $55 million bond issue is approved by voters on Tuesday, May 5.

Citation preview

  • Original Construcon Date: 1970 Total Gross Square Feet: 317,071 SF

    Student Enrollment 2015: 827

    School Construcon Budget: $26,952,210 Percent of Construcon Budget: 50%

    Interiorspace/classroomimprovements:42,200 sq. . addion to include new performing arts center, band & choir rooms along with

    support spaces for the performing arts center

    Remodeling of oce area to create a secure entry into the building Remodeling as needed for ADA compliance Remodeling/upgrades to the Media Center, Science Labs, Cafeteria, Servery and Computer Labs Replacing classroom casework; furniture; ceiling les; flooring and lockers as needed InformaonTechnology:Technology to include improved security surveillance systems; improved communicaon sys-

    tems, new technology equipment, and improved infrastructure to support technology iniaves. Mechanical/Electricalimprovements:Mechanical improvements include replacing heang, venlang, and air condioning systems in

    the 1970 building to improve energy eciency and air quality; providing air condioning where appropriate and designing the system to allow for air condioning in the future; replacing the exisng steam boilers with new high eciency hydronic boilers and piping; replacing tempera-ture controls to improve energy eciency.

    Electrical improvements include providing addional power and data capabilies at classrooms; upgrading the power system throughout the 1970 building; replacing lighng and installing occu-pancy sensors to improve energy eciency and to enhance the learning environment; upgrading the fire alarm system, emergency lighng system, emergency generator, and exit signs to im-prove safety; replacing the exisng clocks with a wireless clock system; replacing exterior build-ing and site lighng to improve safety.

    Hasngs High School

  • Exteriorimprovements:Remodeling of south exterior faade to improve main entry visi-

    bility; replacing exisng windows, entrances and finishes to im-prove energy eciency and appearance

    Sitework for new Performing Arts Center Milling and replacing exisng asphalt surface in bus drive; sta,

    student and stadium parking lots; replace storm catch basin in drive at NW corner of CERC

    Reconstrucng exisng track and (8) tennis courts New home and visitor bleachers along with press box

    Hasngs High School cont.

  • Original Construcon Date: 1917 Total Gross Square Feet: 118,441 SF

    Student Enrollment 2015: 640

    School Construcon Budget: $14,239,341 Percent of Construcon Budget: 26%

    Interiorspace/classroomimprovements:51,000 sq. . addion to replace the 1917 poron of building. Addion will include classrooms,

    special educaon classrooms, computer labs, science labs, art room, cafeteria/gym, kitchen, servery; and expansion of the exisng band room.

    Replacing original exterior doors , flooring, ceilings, casework, and lockers as needed in the 1954 building.

    New classroom furniture InformaonTechnology:Technology to include improved security surveillance systems; improved communicaon systems,

    new technology equipment, and improved infrastructure to support technology iniaves. Mechanical/Electricalimprovements:Mechanical improvements include replacing heang, venlang, and air condioning systems to

    improve energy eciency and air quality; providing air condioning where appropriate and design-ing the system to allow for air condioning in the future; replacing the exisng steam boilers with new high eciency hydronic boilers and piping; replacing temperature controls to improve energy eciency; replacing sanitary piping and domesc water piping.

    Electrical improvements include replacing the power supply as a result of the 1917 building demo-lion; providing addional power and data capability at classrooms; replacing lighng and in-stalling occupancy sensors to improve energy eciency and to enhance the learning environment; providing a new emergency generator, upgrading the emergency lighng system, and replacing the exit signs to improve safety; replacing the exisng clocks with a wireless clock system; replac-ing exterior building and site lighng to improve safety.

    Exteriorimprovements:Site improvements to support new addion

    Hasngs Middle School

  • Hasngs Middle School

  • Original Construcon Date: 1930 Total Gross Square Feet: 69,400

    Student Enrollment 2015: 314

    School Construcon Budget: $4,108,658 Percent of Construcon Budget: 8%

    Interiorspace/classroomimprovements:Remodeling of main oce and vesbule to create secure entry vesbule including installaon of

    camera, intercom and door hardware

    Remodeling as needed for ADA compliance Replacing of door hardware, flooring, wall le, damaged plaster walls in kindergarten room, stu-

    dent lockers, and providing acousc treatments in exisng art room New classroom furniture InformaonTechnology:Technology to include improved security surveillance systems; improved communicaon systems,

    new technology equipment, and improved infrastructure to support technology iniaves. Mechanical/Electricalimprovements:Mechanical improvements include a new heang plant with high eciency boilers; replacing

    heang, venlang, and air condioning systems in the 1930 building to improve energy eciency and air quality; providing air condioning where appropriate and designing the system to allow for air condioning in the future; replacing temperature controls to improve energy eciency; replac-ing the sanitary piping and the domesc water piping.

    Electrical improvements include providing addional power and data capability at classrooms. Replacing the power system throughout the 1930 building; replacing lighng and installing occu-pancy sensors to improve energy eciency and to enhance the learning environment; replacing the auditorium and stage lighng with energy ecient LED lighng; providing an emergency gen-erator, upgrading the emergency lighng system, and upgrading exit signs to improve safety; re-placing the exisng clock system; installing a new PA system with speaker coverage for the play-ground.

    Exteriorimprovements:Installaon of ADA compliant ramps at north building entry from Walnut Street Remodeling the site for improved parking and dedicated parent-drop/bus-drop Demolion of Annex

    Hasngs Central Elementary

  • Original Construcon Date: 1953 Total Gross Square Feet: 48,000 SF

    Student Enrollment 2015: 331

    School Construcon Budget: $3,194,190 Percent of Construcon Budget: 6%

    Interiorspace/classroomimprovements:Remodeling of main oce and vesbule to create secure entry vesbule including installaon of

    camera, intercom and door hardware. Remodeling door hardware with ADA compliant lever hardware Replacing exisng casework with new casework New classroom furniture InformaonTechnology:Technology to include improved security surveillance systems; improved communicaon systems,

    new technology equipment, and improved infrastructure to support technology iniaves. Mechanical/Electricalimprovements: Mechanical improvements include replacing heang, venlang, and air condioning systems in the

    1953 and 1964 building to improve energy eciency and air quality; providing air condioning where appropriate and designing the system to allow for air condioning in the future; replacing temperature controls to improve energy eciency; installing addional domesc hot water heang capacity, and installing hot water piping to sinks; replacing the domesc water piping throughout the 1953 and 1965 building.

    Electricalimprovements include providing addional power and data capability at classrooms. Up-grading the power system throughout the 1953 and 1965 building; replacing lighng and installing occupancy sensors to improve energy eciency and to enhance the learning environment; provid-ing an emergency generator, upgrading the emergency lighng system, and upgrading exit signs to improve safety; replacing the exisng clocks with a wireless clock system; installing a new PA system with speaker coverage for playground.

    Exteriorimprovements:Reconstrucng face brick at main entry; reconstrucng masonry and lintels at southeast corner of

    the building Replacing windows and metal panels above windows on 1953 building and 1965 addion to im-

    prove energy eciency. Replacing hollow metal doors/frames to improve energy eciency Replacing roof with single ply membrane at 1953 building and 1965 addion Replace galvanized pipe handrail at south entry stairs Install push buon operator at 1997 corridor entry for access to play area Provide ADA access to play areas Remove exisng wood play structures; replace non-conforming swing sets and provide surfacing in

    use zone; replace surfacing around play structures Provide drainage improvements at playground and courtyard Reconstruct exisng asphalt paving and sidewalks

    Hasngs Northeastern Elementary

  • Original Construcon Date: 1953

    Total Gross Square Feet: 47,000 SF

    Student Enrollment 2015: 256

    School Construcon Budget: $2,748,231

    Percent of Construcon Budget: 5%

    Interiorspace/classroomimprovements:Remodeling of main oce and vesbule to create secure entry vesbule including installaon of

    camera, intercom and door hardware. Remodeling door hardware with ADA compliant lever hardware New classroom furniture InformaonTechnology:Technology to include improved security surveillance systems; improved communicaon systems,

    new technology equipment, and improved infrastructure to support technology iniaves. Mechanical/Electricalimprovements: Mechanical improvements include replacing heang, venlang, and air condioning systems in the

    1953 and 1964 building to improve energy eciency and air quality; providing air condioning where appropriate and designing the system to allow for air condioning in the future; replacing temperature controls to improve energy eciency; installing addional domesc hot water heang capacity, and installing hot water piping to sinks; replacing the domesc water piping throughout the 1953 and 1965 building.

    Electrical Improvements include providing addional power and data capability at classrooms; up-grading the power system throughout the 1953 and 1965 building; replacing lighng and installing occupancy sensors to improve energy eciency and to enhance the learning environment; provid-ing an emergency generator, upgrading the emergency lighng system, and upgrading exit signs to improve safety; replacing the exisng clocks with a wireless clock system; replacing exterior building lights with energy ecient LED fixtures.

    Exteriorimprovements:Develop separaon of bus and student drop-o trac for student safety Replacing deteriorated face brick at pier near main entrance & masonry pier at northeast corner of

    boiler room Replacing windows and metal panels above windows on 1953 building and 1965 addion to im-

    prove energy eciency Replacing hollow metal doors/frames to improve energy eciency Replacing roof with single ply membrane at 1953 building and 1965 addion Install push buon operator at 1997 south entry Remove exisng wooden play structures; replace (3) non-conforming swing sets and provide surfac-

    ing in use zone; replace surfacing in play area on east side of building Improve drainage in play area on east side of building Reconstruct exisng asphalt paving and sidewalks

    Hasngs Southeastern Elementary

  • Original Construcon Date: 1997 Total Gross Square Feet: 55,000 SF

    Student Enrollment 2015: 318

    School Construcon Budget: $1,839,038 Percent of Construcon Budget: 3%

    Interiorspace/classroomimprovements:Installaon of casework in classrooms Install pairs of 4-0 wide doors between classrooms for team teaching Paral replacement of teraflex sports floor in exisng gymnasium Replacing carpet as need InformaonTechnology:Technology to include improved security surveillance systems; improved communicaon sys-

    tems, new technology equipment, and improved infrastructure to support technology inia-ves.

    Mechanical/Electricalimprovements: Mechanical improvements include upgrading temperature controls to improve energy ecien-

    cy; replacing all dielectric unions on heang piping; adding zone isolaon valves.Electrical Improvements include replacing lighng at the media center, gym, and entry; in-

    stalling occupancy sensors to improve energy eciency; replacing emergency lighng ballasts; replacing the exisng clocks with a wireless clock system.

    Exteriorimprovements:Renovaons to correct ground water and humidity issues Replace damaged guer near receiving area Mill and repave exisng asphalt surface in parking lots Develop separaon of bus and student drop-o trac; increase the sidewalk width to 8-0 to

    improve student safety

    Replace surfacing in playground; reconstruct nature trail structures

    Hasngs Star Elementary

  • Original Construcon Date: New Building

    Total Gross Square Feet: 4,284

    Student Enrollment 2015: NA

    School Construcon Budget: $1,180,737

    Percent of Construcon Budget: 2%

    TransportaonFacilityNew building for maintenance and oce space Purchase of four (4) new buses

    Hasngs Transportaon Facility