19
HardRock Directional Drilling Company Overview 1

HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

  • Upload
    trinhtu

  • View
    224

  • Download
    3

Embed Size (px)

Citation preview

Page 1: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

HardRock Directional DrillingCompany Overview

1

Page 2: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Directional Drilling Fleet2

2

Agenda

Company Overview1

Page 3: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Safety is the most important responsibility of our company, and our resulting safety track record proves successful implementation

Operated by a seasoned management team and drilling professionals fully trained in the complex HDD process

Adhere to a strict training program

Internal development and promotion program ensures HardRock is above and beyond the competition

Comprehensive, new drilling and support fleet

Provide a true Turn-Key Service:

• Field Operations are supported by: In-house Maintenance, Fabrication Department, Extensive Support Equipment, Internal Survey, Pre- and Post-Profile, and Potholling Capabilities;

• HardRock’s Turn-Key Service results in:

– Reduced downtime, delays, and/or calls on the customer’s equipment

– High reliability and on-time delivery

– Negates the need to rely on 3rd party contractors or our customers for any back-up services

Leading provider of Horizontal Directional Drilling (HDD) and field services

Headquartered in San Antonio, TX with additional operating locations in Pearsall, and Monahans

Operates a comprehensive, new drilling and support fleet

13 years in business and over 100 years of combined experience

Over 50+ MSA’s with “Blue Chip” & broad customer base

Provide a comprehensive range of services including:

• Engineering & Bore design

• Total turn-key HDD installation

• Utility infrastructure installation

• Field services

Since inception in 2003, Hard Rock has successfully installed over 3.5 million ft. of pipe, with sizes ranging from 2”–54”

Since 2012 HardRock has successfully installed over 66miles of product.

l

About Us

3

Company Profile

Key Differentiators

Page 4: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

2003 2010 2011 2012 2013 2014 2015 2016

4

Company History

Founded in July 2003 1 drilling rig Mainly served Utility &

Telecommunication industries 5 drilling rigs Installed approximately

1.3 million feetof production

Majority of revenue from oil & gas

273,867 feet of production

11 drilling rigs Opened Pearsall

office / maintenance facility

Acquired Valley Boring

435,969 feet of production

Added yard in Edinburg

Opening West Texas yard

85 employees 16 drilling rigs 410,000 feet of

production

20 drilling rigs 135 employees New yard in

Monahans, TX 440,000 feet of

production

Got it

22 drilling rigs Over 150

employees 380,000 feet of

production

Aquired Million Lb. rig

Over 150 employees

260,000 feet of production

Page 5: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

CEO

Corporate Operations

Business Development

Safety Financial Field Operations

5

Seasoned Management Team and Deep Infrastructure (I)

• Fully staffed corporate and regional development staff

• Fully staffed corporate infrastructure department

• Dedicated staff members assigned to ensure internal safety procedures are followed

• Corporate and regional safety reps

• CFO• Controller• Fully staffed

internal accounting department

• Annual audits by outside CPA firm

• Next slide details our Field structure

Page 6: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

6

Seasoned Management Team and DeepInfrastructure (II)

Drilling Operations are supported by both Superintendents and Crew Leaders

Field Operations General

Superintendent

Superintendent

Crew Leader

Crew

Crew Leader

Crew

Superintendent

Crew Leader

Crew

Crew Leader

Crew

Crew Leader

Crew

Superintendent

Crew Leader

Crew

Crew Leader

Crew

Crew Leader

Crew

Superintendent

Crew Leader

Crew

Crew Leader

Crew

Crew Leader

Crew

Superintendent

Crew Leader

Crew

Crew Leader

Crew

Crew Leader

Crew

Superintendent

Crew Leader

Subcontractors

Page 7: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

HardRock is a member in good standing with and compliant with the standards of:

• ISNetworld

• Veriforce

• SafeLand

• NCCER

• PEC Premier

• Houston Area Safety Council

• NCMS

• PHMSA

HardRock allocates extensive resources and has an assigned staff that is dedicated to insure that the company remains an industry leader in safety

Fully compliant with all necessary safety requirements

HardRock is insured by AFHIC, Winchester Fire Insurance Company, and Texas Mutual Insurance with coverage that includes commercial general liability, any auto, hired auto, non-owner auto, and umbrella liability (Noth River Insurance)

Safety policy:

• Projects are subject to regular safety audits

• Daily crews are required to follow the job safety analysis (JSA) procedure which HardRock has expanded to total job analysis and is reviewed each day with the crews on-site

• Supervisors are evaluated based on their safety records and the safety records of the employees they supervise

• Require employees to actively participate in internal training and service programs relevant to their employment and complete any training programs required by law or relevant to the specific project

• Adhere to a strict drug policy where employees are subject to pre-employment and random drug screens

Internal

7

Impeccable Safety Record

External

HardRock has a strong safety record over its 12 year history that is superior to the industry average

Page 8: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

8

ISNetworld

Page 9: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Engineering & Bore Design

• Atlas Bore Planner

• AutoCAD

• DCE Datalog

• GPS surveying equipment

• Gyro locating system

• Tensor tool

• 2 Paratrack downhole wireline guidance systems

• Access to bore profiles via website

Extensive Support Equipment

• Dedicated Fleet Manager-DOT Program

• Track hoes

• Trailers/haul trucks

• Mud/water trucks

• Vacuum trucks

• Field Servicing trucks

• Hydro excavation – also have air capabilities

• Wireline

Corporate Office – San Antonio

• Unparalleled office support team

• Engineering Department

Dedicated Fabrication Department

• Can customize tools required for any job

• Can build cooling/heating & trash trailers

• CAD Machine

Pearsall Yard

• On-site mechanics & service trucks

• Storage

• Admin support/ in addition to San Antonio

• Employee housing facilities

West Texas Yard (Monahans)

• Support equipment

• Storage

• Employee housing facilities

• On site mechanics & Service trucks

9

True Turn-Key Operations

HardRock’s field operations are supported by:

True Turn-Key service negates the need to rely on 3rd party contractors or the customer for any back-up services

Page 10: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Robert Myers got his start in telecommunication business in the mid 1990’s. Since its inception in 2003, HardRock has been involved in numerous projects across the country in both urban and rural areas. Performing turnkey service, HardRock’s capabilities range from a single duct to 54” casing. HardRock has worked with such industry leaders as:

Michaels

Valley Telephone

Infra source

AT&T

Level 3

Municipalities

Gilbert Southern (Kiewit)

Hill Country Telephone

Williams Communications

Mastec

10

Fiber/Telecommunications

Page 11: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Potholing Services

Hard Rock offers safe, precise, cost-effective, and environmentally friendly hydro and air excavation services to its clients with its fleet of 6 vacuum trucks

Hard Rock’s vac services are used for visual inspection to verify existing infrastructure without damaging the product

Vacuum Trucks

– 2 Kenworth w/Vactor HXX Units

Advantages of Vac Services

– Reduces risk of injury to personnel

– Reduces risk of damage to underground infrastructure

– Reduces delays, costly repairs, liability, and service interruption due to damage of underground infrastructure

11

Utilities damaged by a backhoe

Utilities excavated by hydro vac

Page 12: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Hard Rock Facts

12

250 Total pieces of equipment

Key Operating Assets

– 1 Vermeer 24 x 40 (w/ Air Hammer)

– 2 Vermeer 36 x 50 drills

– 3 Vermeer 36 x 50 DR (rock drills)

– 2 Vermeer 60 x 90 drills

– 3 Vermeer 100 x 140 drill

– 1 Universal 250 x 400 drill

– 1 Vermeer 330 x 500 drill

– 1 Vermeer 500 x 500 drill

– 1 American Augers 440T

– 1 Vermeer 1000 x 900

– 2 High-Volume Super Vac Trucks

Comprehensive, New Drilling and SupportFleet

Page 13: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Drilling Fleet

13

Drilling Rig Number of Rigs Thrust/Pullback Torque

Vermeer 36 x 50 2 36,000 lbs (160 kN) 4,995 ft-lb (6,772 Nm)

Vermeer 36 x 50 DR 3 38,000 lbs (169 kN) 6,000 ft-lb (8,135 Nm)

Vermeer 60 x 90 2 60,000 lbs (267 kN) 9,000 ft-lb (12,202 Nm)

Vermeer 100 x 140 2 100,000 lbs (445 kN) 14,000 ft-lb (18,982 Nm)

Universal 250 x 400 1 250,000 lbs (1,112 kN) 40,000 ft-lb (54,237 Nm)

Vermeer 330 x 500 1 330,000 lbs. 50,000 ft-lb (67,791 Nm)

Vermeer 500 x 500 1 500,000 lbs (2,224 kN) 50,000 ft-lb (67,791 Nm)

American Augers 440T 1 440,000 lbs (1,957 kN) 60,000 ft-lb (81,349 Nm)

Vermeer 1000 x 900 1 1,000,000 lbs 90,000 ft-lb

HardRock operates an extensive drilling fleet that is capable of handling any pipe size and distance required

Page 14: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

14

Drill Rod Specs

Size Lgth. Wght. Bend RadiusFt. of Rod to

Bend 90 degrees

Max. Angle in

degrees/Rod

Max. % Slope

%/RodTorque Rating

D 36 x 502.625" (6.7 cm) X.40" (1 cm) wall thickness with 3.1" (7.9 cm) upset

15' (4.6 )

165 lb/stem(74.8 kg)

145' (44 m)228'

(69.4m)5.9 10.3

5,000 ft-lb(6779.1 Nm)

D 36 x 50 DR2.625" (6.7 cm) OD x .281" (.7cm) wall thickness with 3.31" (8.4 cm) upset

10' (3 m)

86 lb/stem (39.0k)

169' (52m)265'

(80.8 m)3.4 5.9

6,000 ft-lb (16779.09 Nm)

D60 x 903.5" (8.9 cm) OD X .449" (1.14 cm) wall thickness with 3.625" (9.2 cm) upset

15' (4.6 )

250 lb/stem(113.4 kg)

197.4' (60.2 m)310'

(94.5m)4.3 7.5

10,000 ft-lb (13,558.2 Nm)

D100 x 2003.5" (8.9 cm) OD x .476" (1.2 cm) wall thickness with 4.375" (11.1 cm) upset

20' (6.1 cm)

374 lb/stem(169.6 kg)

197.4' (60 m)310'

(94.5m)5.8 10.2

15,000 ft-lb (20,337.3 Nm)

D2505” .362 wall thickness

20’ 550 lb/stem 500’

4.2 38,044

D330 x 5005.5” .415 wall thickness

31’ 858 lbs../stem 458 3.6 12.5° 73,20

D440 x 5005.5” .415 wall thickness

31’ 858 lbs../stem 458 3.612.5°

73,20

D1000 x 9005.5” .415 wall thickness

31’ 858 lbs../stem 458 3.6 12.5° 109,226

Page 15: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

1515

Work SpaceWork Space Requirements

Machine Size

Minimum Work Space

Requirements

36 x 50 50’ x 50’

60 x 90 100’ x 100’

100 x 120 150’ x 120’

250, 330, 440, 500, 1000 150’ x 150’

Page 16: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

AgendaAgenda

Summary 1

Page 17: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Recent Notable Projects

17

With over 100 years of combined experience, the HardRock team has successfully completed hundreds of HDD projects of all pipe sizes for national, state and local firms

Plains (Diamond) 20”• Location: Arkansas – Memphis, TN• 35,000’ of 20” pipe• LF Range: 1000’-5,300’

(Included Mississippi & Cache Rivers)

Dow – 12” – Gulfstream• Location: Texas City, TX• 33,000’ of 12” pipe• LF Range: 100’-3,300’• 4 Corp of Engineer Drills

Oneok – 16” – Sterling• Location: Crockett, TX• 22,000’ of 16” pipe• LF Range: 100’-2,400’

Magellan – 20” & 24” – Bridge Tex• Location: Houston, TX• 10,000+’ of 20” pipe• LF Range: 1,450’-4,200’• 7,400’ of 24” pipe• LF Range: 1,400’-2,500’

Phillips 66 – 30” – BLC Crude Line• Location: Orange, TX• 18,000’ of 30” pipe• 4 Drills-LF Range: 3,200’-5,300’

Atmos – 30” – Groesbeck• Location: Groesbeck, TX• 5,500’ of 30” pipe• LF Range: 800’-1,400’

Phillips 66 Sweeney Midstream – 2-10”, 12”, 2-16”, 18”, 20” – Sweeney• Location: Sweeney, TX • 97,000’ HDD – 50,000’ Road Bores •Linear foot range 100’-5,000’

• Included 408 Corp of Engineers Drills – and Bundled Drills of 20 & 80- 18, 16,10

Page 18: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Broad & Blue Chip Customer Base

18

Page 19: HardRock Directional Drilling - Horizontal Direction · PDF file6 Seasoned Management Team and Deep Infrastructure (II) Drilling Operations are supported by both Superintendents and

Why Hard Rock?

19

Provides superior service to its customers and ensures that each job is completed efficiently while adhering to the strictest safety protocols

Proven success with over 3+ million feet of pipe installed

A broad operator with the sophistication and capabilities to serve the most demanding customers and provides a “one-stop shop” for both customers’ small and larger projects

Has the MSA’s, insurance coverage, safety record, working capital, infrastructure, and employee training to support the large projects demanded by the industry

Operates a sizable fleet of equipment and has multiple locations that allows it to respond quickly to breakdowns/interruptions, thereby reducing delays and cost overruns