Hard Lanscape BQs

Embed Size (px)

Citation preview

  • 7/31/2019 Hard Lanscape BQs

    1/14

    CADANGANLANDSKAP

    JALAN PROTOKOLKEM BINA NEGARA

    ULU SEPRIDAERAH REMBAUNEGERI SEMBILAN

    DARUL KHUSUS

  • 7/31/2019 Hard Lanscape BQs

    2/14

    LANDSCAPE PLAN OFJALAN PROTOKOLKEM BINA NEGARA

    ULU SEPRI

  • 7/31/2019 Hard Lanscape BQs

    3/14

    SCOPE OF LANDSCAPEWORKS

    1.SOFT LANSDCAPE

    a. Site Clearanceb. Plants and materialc. Protection of plant

    2.HARD LANDSCAPE

    a. Fencing

    b. Road paving

  • 7/31/2019 Hard Lanscape BQs

    4/14

    b.q1

    EM

    O.

    DESCRIPTION UNIT QUANTITY

    GATEWAY

    EXCAVATION

    Excavate pit for pit pad footing commencing

    from ground level with maximum depth not

    exceeding 2.00m depth m3 2

    Excavate for concrete base commencing fromground level with maximum depth not

    exceeding 0.25mm deep m3 1

    Extra Over excavation for excavation in rock m3 2

    Disposal excavated material through

    spreading and levelling on site where directed

    by the engineer including all necessary

    multiple handling m3 1

    Allow to keep all excavation free from ground

    water Item

    Allow to keep site and all excavation free from

    surface and percolating water Item

    Filling to excavation using material a rising

    from excavation including all compaction of

    the soil as directed by engineer m3 3

    Allow for preparing and applying of '2 stage'

    preconstruction anti-termite treatment to be

    carried out by approved soil treatment

    specialist including preparation of surfaces to

    receive treatment working progressively to

    accomodate the construction works m2 7

    MASS CONCRETE GRADE 15 as described

    Blinding spread and levelled to receive pad

    footing (m/s) thickness not exceeding 100mm m2 4

    VIBRATED REINFORCED CONCRETE

    GRADE 20 as described

    In pad footing m3 1

  • 7/31/2019 Hard Lanscape BQs

    5/14

    b.q2

    EM

    O.

    DESCRIPTION UNIT QUANTITY

    GATEWAY(cont'd)

    VIBRATED REINFORCED CONCRETE

    GRADE 20 as described (cont'd)

    In column stump m3 1

    SAWN FORMWORK as described

    To sides of pad footing not exceeding 250mm

    high m 24

    To sides of column stump m2 12

    HIGH TENSILE ROD REINFORCEMENT as

    described

    10mm Diameter in pad footing kg 41

    10mm Diameter in column stump kg 12

    MILD STEEL ROD REINFORCEMENT as

    described

    6mm Diameter as links in column stump kg 21

    PRECAST REINFORCED CONCRETE

    GRADE 30 as described

    283mm (average) Diameter decorative column

    with paint finish to match colour schame No 4

    200mm x 75mm Decorative beam with paint

    finish to match column

    WROT PRESSURE TREATED GROUP 'B'

    TIMBER as described

    160mm x 15mm Thick fascia board m 54

    CLAY TILES ROOF

    Clay tiles roof laid to 35o pitch on

    prefabricated roof trusses (m/s) to be nailed

    (measured nett-no allowance made for laps) m2 20

    RIDGE COVER

    Flutted ridge cover bedded, jointed and

    pointed in cement and sand (1:3) mortar m 6

  • 7/31/2019 Hard Lanscape BQs

    6/14

    b.q3

    EM

    O.

    DESCRIPTION UNIT QUANTITY

    GATE

    Mild steel decorative gate overall size 900mm

    x 1800mm (extreme) high complete with hasp

    and staple, and hanging to fold on and

    including 2 Nos. approved stout side hinges

    welded on all as per Drawing No.

    BL/BTN/GATE/01/04 No 1

    Mild steel sliding gate overall size 5800mm x

    2260mm high constructed of 20mm x 75mm

    mild steel frame with 15mm x 15mm hollow

    mild steel intermediate rail complete with

    locking hasp and staple all welded together

    including 20mm thick R30mm gate wall all a No 1

    FENCING

    Mild steel fencing overall size 2800mm x

    1000mm high constructed of 20mm x 20mm

    hollow mild steel rails to 150mm c/c, fixed

    between decorative column on brickwall all as

    per Drawing No. BL/BTN/GATE/01/04 and

    BL/BTN/GATE/02/05 m 11

    BRICKWORK

    150mm Thick x 550mm high brickwall in

    common clay brick in strecher bond bedded

    and jointed in cement and sand (1:3) mortar

    including 'EXMET' brick reinforcement laid at

    every fourth course as described fencing wall m 12

    150mm Thick x 2100mm (extreme) high

    brickwall in common clay brick in strecher

    bond bedded and jointed in cement and sand(1:3) mortar including 'EXMET' brick

    reinforcement laid at every fourth course as

    described fencing wall m 9

    20mm Thick cement and sand (1:3) with an

    approved plasticiser externally as described

    plainface to suface of fencing wall m2 24

    PLANTER BOX

    150mm Thick x 500mm high planter box fixedin front of gate wing m 9

  • 7/31/2019 Hard Lanscape BQs

    7/14

    b.q4

    EM

    O.

    DESCRIPTION UNIT QUANTITY

    FENCING(cont'd)

    PRECAST REINFORCED CONCRETE

    GRADE 30 as described

    300mm Diameter precast reinforced concrete

    decorative column complete with decorative

    footing and capping (cornice) No 6

    WROT PRESSURE TREATED GROUP 'B'

    TIMBER as described

    400mm x 400mm x 35mm Thick timber base

    to be anchored in column with 10mm

    diameter threaded iron rod achor and washer m2 1

    75mm x 75mm Thick timber column post

    fixed to timber base with polyfilla as described m2 12

    50mm x 30mm Thick beam to be fixed at the

    top of timber column to receive roof rafter m 4

    35mm x 35mm Thinck decorative beam to be

    jointed horisonatll through timber column m 22

    50mm x 25mm rafter m 42

    15mm x 15mm Thick frame m 38

    GLAZING

    5mm Thick frosted gloss m2 1

    ROOF

    5mm Thick stainless steel sheet with brush

    finish m2 2

  • 7/31/2019 Hard Lanscape BQs

    8/14

    b.q5

    EM

    O.

    DESCRIPTION UNIT QUANTITY

    PAVEMENT

    Extra over excavate for tarmacadam

    maximum depth not exceeding 0.25m

    commencing from ground level m2 639

    Disposal excavated material off the site to an

    approved location including all necessary

    payments in relation the disposal m3 1

    Hardcore filling consisting of hard broken brick

    and blinded with sand thickness 400mm

    spread and levelled with rammed and

    consilidated materials and blinded with layer

    of sand to receive metalled tar road (m/S) m2 639

    Prepare and apply a prime coat of approved

    bitumen emulsion on hardcore m2 639

    Prepare and apply a tack coat of approved

    bitumen emulsion on binder course m2 639

    60mm Thick premix binder course on surface m2 639

    CONCRETE KERB as described

    150mm x 700mm High precast concrete

    Grade 20 kerb with one tap edge chamfered,bedded on concrete haunch and base

    including all excavation, formwork,

    reinforcement and finish fair on exposed

    edges and paint kerb in black and white or

    other equal and appro m 212

    Mild steel grating overall size 660mm x

    601mm generally constructed of 660mm x4mm thick angle bar frame and 650mm x

    9mm thick mild steel flat bars at 60 c/c, the

    whole in welded connection, prime and

    painted with two coats of ICI or other equal

    and appro No 22

  • 7/31/2019 Hard Lanscape BQs

    9/14

    b.q6

    EM

    O.

    DESCRIPTION UNIT QUANTITY

    PAVEMENT(cont'd)

    REINFORCED CONCRETE GRATING as

    described

    1570mm Wide (internal) cast insitu

    Reinforced Concrete Grade 20 covered

    existing drain laid to falls including allnecessary as mentioned by enginer m 212

    PRECAST CONCRETE DRAIN as described

    415mm x 415mm Precast concrete Grade 20

    drain laid to falls, generally constructed of

    100mm thick concrete slab and 235mmconcrete base foundations, and 285mm thick

    brickwall, including all necessary excavation,

    formwork, reinforcement, outlets, junction m 212

  • 7/31/2019 Hard Lanscape BQs

    10/14

    harga

    BUTIRAN/PERKARA AMAUN

    EHENDAK PERMULAAN DAN

    YARAT-SYARAT AMRELIMINARIES) 20,000.0

    ERJA-KERJA PENYEDIAAN AWAL

    AN PEMBERSIHAN TAPAK 5,600.0EMBEKAL BAHAN BAHAN

    ANAMAN 180,167.0ENYEDIAAN LUBANG DAN

    ENANAMAN 31,752.0EMANCANGAN 26,040.0

    ENYELENGGARAAN 9,000.0

    NTU MASUK

    50,430.0UANG PEJALAN KAKI 31,513.7

    ONGKANG 27,540.0

    ROVISIONAL SUM 32,000.0

  • 7/31/2019 Hard Lanscape BQs

    11/14

    TOTAL SUM OF

    THE PROJECT =

    414,042.75

  • 7/31/2019 Hard Lanscape BQs

    12/14

    PROJECT :

    CADANGAN TAMBAHANAN 1 BLOK PAMERAN DAN BLOKMEKANIKAL KEPADA BANGUNAN SEDIAADA

    GELARIA PERDANA, MUKIM AIR HANGAT, DAERAHLANGKAWI , KADEH DARUL AMAN UNTUK TETUAN

    LEMBAGA PEMBANGUNAN LANGKAWI (LADA)

    CLIENT:

    LEMBAGA PEMBANGUNAN LANGKAWI

    (LANGKAWI DEVELOPMENT AUTHORITY)

    (LADA)

    ARCHITECT:

    DBA AKITEK SDN.

    BHD.

    QUANTITY SURVEYER:CKP NIZARUDDIN JURUKUR BAHAN SDN.BHD.

    CONTRACTOR:

    PRODRABENA SDN. BHD

    CASE STUDY

  • 7/31/2019 Hard Lanscape BQs

    13/14

    BIL DESCRIPTION PAGES AMOUNT

    RM C

    A

    B

    C

    D

    E

    PRELIMINARIES

    SOFT LANDSCAPE WORKS

    HARD LANSCAPE WORKS

    MECHANICAL AND

    ELECTRICAL WORKS

    EXTERNAL WORKS

    SITE PREPARATION AND

    EARTHWORKS

    A/61

    B/1

    C/1

    D/1

    E/1

    38,000

    308,415

    313,067

    39,600

    19,395

    00

    20

    15

    00

    00

    TO COLLECTION 718,477 35

    EXAMPLE SUMMARY

    OF TENDER

  • 7/31/2019 Hard Lanscape BQs

    14/14