2

Click here to load reader

HARC Working With Cranes

Embed Size (px)

Citation preview

Page 1: HARC Working With Cranes

8/12/2019 HARC Working With Cranes

http://slidepdf.com/reader/full/harc-working-with-cranes 1/2

Schlu

mbergerPrivate

Hazard Analysis and Risk Control Record

Revision: Rev. 0Task/ProcessAssessed:

Lifting and Handling with Crane

Date: 14/12/03 ocation:  All SDS Managed Rigs

!"eration: Assessment Team: Hamdy Salem/James Thorn/Ronald Ayllon, Milind !m"har#ar 

Activity Ste"

HA#ARD $%$T$A R$S& C!%TR! '(AS)R(S R(S$D)A R$S&

Hazard Descri"tionand *orst CaseConse+uence ,ith no

Prevention or 'itigation 'easures in

Plac

ossCategory

Po"ulationA--ect

      i   k  e   l   i   h  o  o

   S  e  v  e  r   i   t

   R   i  s   k     e  v  e ist all Current and Planned Control 'easures. taking into Account all

Contributing and (scalating actors

      i   k  e   l   i   h  o  o

   S  e  v  e  r   i   t

   R   i  s   k     e  v  e

Current and Planned Prevention'easures to reduce ikelihood

Current and Planned 'itigation'easures to reduce Severity

$re%aring &heload 'or li'&ingand (rane%osi&ioning

- Ma(hinery/)*!i%men&/Hand Tools

- $o&en&ial )nergy + ravi&a&ional-S&e%%ing, Handling,i'&ing

1. ollision i&he*!i%men& , or r igs&r!(&!re.

2. r!shing o' (remem"ers hile g!iding&he (rane in %osi&ion.

3. all ing ' rom &he loadhile a&&a(hing i&.

$ersonnel-(re involved,o&hers, (raneo%era&or,

 Asse&s -rane,rig e*!i%men&,rig s&r!(&!re,slings, &hird

%ar&y and (lien&asse&s.

)nvironmen&-load (on&en&s%illed, (rane'l!ids s%illed.

   $  o  s  s   i   "   l  e

   -   3   /

   M  a     o  r   -     3   /

   )  n   d  e  s   i  r  a   b   l  e   0  1   2   3

- rane o%era&or5s *!ali'i(a&ionsassessed and re(er&i'ied reg!larly.

- re &raining in li'&ing o%era&ions-Ro!s&a"o!& mod!le, S6$$, and "an#sman&raining.

- Third %ar&y and s!" (on&ra(&orsa!di&ing 'or (om%lian(e in li'&ing o%era&ions-%ersonnel &raining 7 li'&ing gear in&egri&y.

- ranes shall (om%ly i&h SDS sa'e&yre*!iremen&s and shall only "e o%era&ed "ySDS a%%roved (rane o%era&ors.

- Reg!lar (rane main&enan(e,ins%e(&ions and re(er&i'i(a&ion.

- 8eigh&s are mar#ed on heavy rigloads.

- Reg!lar ins%e(&ion o' li'&ing gear andmain&aining a regis&er.

- i'&ing gear sho!ld (om%ly i&h &he(!rren& (olor (ode.

- $ro%er sele(&ion o' &he li'&ing gear &o!se and vis!al ins%e(&ion "e'ore !sage.

- on&rolled !se o' nylon s&ra%s -M6

a%%roval 7 $T8.- rane "oom shall no& "e moved

i&ho!& &he (rane o!&riggers de%loyed9Mo"ile (ranes s%e(i'i(:.

- Rig s%e(i'i( o%era&ing %ro(ed!reregarding (rane o%era&ion %ossi"le (on'li(&i&h o&her o%era&ions.

6&em 3.; o'' a%%endi< 4 S%e(i'i( SDS %ro(ess&o =S s&andard > 13 -Me(hani(al li'&ing

-

- ond!(& &ool "o< mee&ing &o dis(!ss&he o" i&h involved %ersonnel.

- )<(l!de all non essen&ial %ersonnel'rom area.

- =nly one %erson &o signal &he (raneo%era&or 

- Revie, Suitability o- "ick1u" areaand "re1de-ine the lay do,n area4

- rane o%era&or ill res%ond &o anemergen(y s&o% signal -only i' given"y any one.

- rane o%era&or a!&hori?ed &o s&o% &he o" i' load is no& %ro%erly sl!ng or no&'i&&ed i&h &ag lines.

- $ersonnel no& %ermi&&ed &o ride on &he(rane hile in mo&ion.

- re shall no& (onne(& any load &o &he(rane !nless &he (rane o!& riggers are'!lly e<&ended and %ro%erly %osi&ioned9Mo"ile (ranes s%e(i'i(:.

- Signal man &o ma#e s!re &ha& &here areno one in a %osi&ion here &hey (an "e

&ra%%ed or (r!shed i&h &he (rane.- rane o%era&or &o main&ain a %osi&ive

eye (on&a(& i&h &he signal man.

- Con-irm that the load to be handledis secured 5stable5 be-orea""roaching it to eliminate the risko- load movement or overturning4

- Availability o- suitable/a""rovedli-ting "oints on load

- (nsure the "ick u" and lay do,nareas are ,ell lit4

- Closely coordinate the craneo"eration ,ith the truck drivers/boatcre,s4

   @  n   l   i   #  e   l  y   -   2   /

   .   i  g   h   &   -     1   /

   A  (  (  e  %   &  a   "   l  e   -     2   /

HAR Re(ord Tem%la&e =SHS)S020 $age 1 o' 2 Tem%la&e RevisedB 31 Mar 2003

Page 2: HARC Working With Cranes

8/12/2019 HARC Working With Cranes

http://slidepdf.com/reader/full/harc-working-with-cranes 2/2

Schlu

mbergerPrivate

$i(#ing !% aload

oad inTransi&

rane o''  loading

- Ma(hinery/)*!i%men&/Hand Tools

- $o&en&ial )nergy + ravi&a&ional-S&e%%ing, Handling,i'&ing

- 8a&er &rans%or&

1. oad (ollision i&h%eo%le, e*!i%men&, or rig s&r!(&!re.

2 . Dro%%ed load3. rane over&!rning

4. all ing ' rom &he loadhile dis(onne(&ing i&.

$ersonnel-(re involved,o&hers, (raneo%era&or, &hird%ar&y,

 Asse&s -rane,rig e*!i%men&,rig s&r!(&!re,slings, &hird%ar&y and (lien&asse&s.

)nvironmen&-load (on&en&s%illed, (rane'l!ids s%illed.

Con %rod!(&ive&imeS,(lien&, Third%ar&y.

   .   i   #  e   l  y   -   4   /

   0  a   &  a  s   &  r  o  %   h   i  (

   -     4   /

   6  n   &  o   l  e  r  a   "   l  e   -     1   ;   /

6n addi&ion &o &he a%%li(a"le meas!res a"ove B

- ranes shall "e e*!i%%ed i&h a9load a&(her:, giving a (on&in!o!sindi(a&ion o' &he hoo# load and ra&ed load'or ea(h radi!s. The indi(a&or shall give a(lear and (on&in!o!s arning hena%%roa(hing &he ra&ed (a%a(i&y o' &he(rane.

-  All non environmen&ally 'riendlygoods &o "e %ro&e(&ed agains& !n(on&rolleds%ill/dis(harge.

- ri&i(al e*!i%men& shall "e s!i&a"ly%ro&e(&ed agains& %ossi"le damage hileloading.

- The rig s!%erin&enden& or hisdelega&e shall ade*!a&ely s!%ervise li'&ingo' (ri&i(al e*!i%men&..

-

6n addi&ion &o &he a%%li(a"le meas!resa"ove B- Co load is &o "e li'&ed !nless i&s eigh&

is #non and i& is %ro%erly sl!ng i&h&ag lines %ro%erly a&&a(hed.

- oad shall no& "e g!ided i&h hands,&ag lines shall "e !sed ins&ead.

- Co load is &o "e li'&ed or o'' loaded!nless all %ersonnel are (lear o' &heload

- Co load is &o "e %!& in or removed 'roma "as#e& or "in i' &here are any

%ersonnel in or near &he "as#e& or "in.- oad sho!ld "e loaded or o'' loaded in

a manner &o minimi?e dynami(/sho(#loading a%%lied &o &he (rane s&r!(&!re.

- )ns!re %ro%er alignmen& o' (rane "lo(#and load %rior &o li'& (ommen(emen&.

- he(# 'or o"s&r!(&ions a& %i(# !%, laydon lo(a&ions as ell as on &hero!&e/%a&h.

- )ns!re &he load ro!&e %a&h is (lear o' all %ersonnel.

- @se %ro%er &e(hni*!e hen de&a&(hing&he load, only do i& hen &he line issla(#ed and load is s&a"le.

   $  o  s  s   i   "   l  e   -   3   /

   S  e  r   i  o  !  s   -     2   /

   @  n   d  e  s   i  r  a   "   l  e   -     ;   /

Removing &he(rane and%ar#ing i&

- Ma(hinery/)*!i%men&/Hand Tools

- $o&en&ial )nergy + ravi&a&ional-S&e%%ing, Handling,i'&ing

1. oll is ion i&h %eo%le,e*!i%men& , or r igs&r!(&!re.

2. rane over&!rning.

$ersonnel-(re involved,o&hers, (raneo%era&or,

 Asse&s -rane,rig e*!i%men&,rig s&r!(&!re

   @  n   l   i   #  e   l  y   -   2   /

   M  a     o  r   -     3   /

   @  n   d  e  s   i  r  a   "   l  e   -     ;   /

 As a"ove. 6n addi&ion &o &he a%%li(a"le meas!resa"ove B

- Ma#e s!re &he (rane "oom iss&oed %ro%erly and lo(#ed in %osi&ioni&h &he "lo(#s are in &he %ar#ed%osi&ion.

- Res%e(& &he lo(a&ion s%eed limi&.

- $ar# &he (rane in i&s designa&ed%ar#ing s%o&.

   6  m  %  r  o   "  a   "   l  e   -   1   /

   .   i  g   h   &   -     1   /

   C  e  g   l   i  g   i   "   l  e   -     1   /

HAR Re(ord Tem%la&e =SHS)S020 $age 2 o' 2 Tem%la&e RevisedB 31 Mar 2003