34
Hannah Mackin

Hannah Mackin Portfolio

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Hannah Mackin Portfolio

Hannah Mackin

Page 2: Hannah Mackin Portfolio
Page 3: Hannah Mackin Portfolio

Contact

[email protected]

H a n n a h M a c k i n

E d u c a t i o n

Washington State University / May 2016Bachelor in Interior DesignMinor in Construction Management

Study Abroad, Italy / Fall 2015Washington State University Interior Design 16 Week Program in Florence, Italy

Chicago Study Tour / Fall 2013A week long faculty led architecture and design experience.

Interior Design Intern / NAC ArchitectureSpokane, Washington / Summer 2015 Paid internship position assisting interior designers and architects with several projects. Worked on various softwares including Revit, AutoCAD, Sketchup, and Indesign. Responsible for organizing the materials room.

Student Ambassador / WSUPullman, Washington / May 2014- Present Leadership responsibility as a student representative for Interior Design. Responsible for giving perspective students guided tours of the program, from a current students perspective. Link the outside community to the university community.

Waitress / Fireside GrillePullman, Washington / May 2014- Oct 2014 Started as an evening waitress, while going to school full time, moved up to a manager position and was responsible for closing the restaurant.

E x p e r i e n c e

Pursuing LEED Green Certification / 2016

Computer Skills:

-Efficient on Mac and PC-AutoCAD Architecture-Revit 2015-Sketchup Pro-Adobe Photoshop, Illustrator, Indesign -Microsoft Word, Excel, Powerpoint, Project

Design Skills:-Hand and computer rendering, hand sketching-Strong graphic design abilities-Model building-Ability to read and draft construction documents-Space Planning-ADA Knowledge-LEED Knowledge

ASID VP of Student Representative to the State Board / Spring 2015

Student Ambassador SDC / Fall 2015

Alpha Chi Omega Sorority2013- Present

International Interior Design Association2014- Present

American Society of Interior Designers2014-Present

C e r t i f i c a t i o n s

Q u a l i f i c a t i o n s

L e a d e r s h i p

A f f i l i a t i o n s

V o l u n t e e r

Habitat for Humanity / Fall 2013 Pullman, WA

Orti Dipinti / Fall 2015 Florence, Italy

Page 4: Hannah Mackin Portfolio

Contents

Global Workplace

CommercialAn office space in Sao Paulo, Brazil that integrates what the future workplace will look like.

ONE PAGE 1

Luxury Apartment

ResidentialA historic apartment renovation in Florence, Italy

TWO PAGE 9

Page 5: Hannah Mackin Portfolio

Little Free Library

Construction DetailingA group build project, a little free library that will be used in Rosalia, Washington.

THREE PAGE 15

Pop-Up Restaurant

CommercialDesigned for legendary chef Tom Douglas, a mobile restaurant to promote his brand.

FOUR PAGE 19

Boutique Hotel

CommercialA boutique hotel located in the heart of Florence, Italy.

FIVE PAGE 23

Page 6: Hannah Mackin Portfolio

One

1

Page 7: Hannah Mackin Portfolio

Global WorkplaceDesign Challenge:To design a 15,000 sq.ft. global workplace five years into the future while being considerate of Sao Paulo, Brazil’s culture. After extensive research the future office space will be a touchdown base to collaborate with other employees. Brazilians are known for being hard working individuals. Although they love time away from work, they enjoy being at work. The design reflects this with a balance between social and workplaces.

Application:First began with extensive research on the workplace today and how it is differs in cultures. Focused on the future of work place as a touchdown space. Then moved into concept development, complying to IBC 2012 codes, fire and life safety codes, sustainable design methods, materiality research, and construction documents.

Page 8: Hannah Mackin Portfolio

3

LEVEL 1 FLOOR PLAN

Page 9: Hannah Mackin Portfolio

TOUCHDOWN PERSPECTIVE

BREAK-OUT PERSPECTIVE

Page 10: Hannah Mackin Portfolio

5

LEVEL 2 FLOOR PLAN

Page 11: Hannah Mackin Portfolio

SOCIAL BREAK-OUT PERSPECTIVE

MATERIALITY

Page 12: Hannah Mackin Portfolio

7

LOBBY PERSPECTIVE

Page 13: Hannah Mackin Portfolio

HANNAH DESIREE MACKIN

Scale

Project number

Date

Drawn by

Checked by

HDM

A1

WSU / IA

ASSIGNMENT 6

SAO PAULOWORK TO LIVE

5/7/2015HANNAH MACKIN

KR & GWE

GENERAL NOTES:1. DO NOT SCALE DRAWINGS2. VERIFY FEILD CONDITIONS PRIOR TOCOMMENCEMENT OF EACH PORTION OF THE WORK3. THE CONTRACT DOCUMENTS ARE COMPLEMENTARYAND WHAT IS REQ. BY ONE SHALL BE BINDING AS IFREQ. BY ALL. THE CONTRACTOR SHALL COORDINATEALL PORTIONS OF THE WORK AS DESCRIBED IN THECONTRACT DOCUMENTS. NOTIFY THE ARCHITECTSFOR RESOLUTION OF ALL DISCREPENCIES PRIOR TOCONSTRUCTION4. DIMENSIONS ARE TO THE STRUCTURAL GRID OR TOTHE FINISH SURFACES UNLESS OTHERWISE NOTED5. DOORS INDICATED NEARBY WALL INTERSECTIONS,SHALL BE LOCATED SO THAT THE FINISH OPENINGSFOUR INCHES FROM THE FACE OF THE NEARBY WALLUNLESS OTHERWISE NOTED6. GENERAL CONTRACTOR RESPONSIBLE FORPROVIDING GENERAL SPECIFICATION ANDINFORMATION TO ALL SUBCONTRACTORS

CODE SUMMARY:TENANT SQUARE FOOTAGE: ROUGHLY 15,000SQUARE FEETCONSTRUCTION TYPE: BOCCUPANT TYPE: IIIAPPLICATION BUILDING CODE2015 INTERNATIONAL BUILDING CODE2015 INTERNATIONAL FIRE CODEIBC 60684 (INTERNATIONAL ELECTROTECHNICALCOMMISIONS INT'L STANDARD)2015 INTERNATIONAL MECHANICAL CODE2015 INTERNATIONAL PLUMBING CODE

ADDRESS:THE PROJECT LOCATION IS BRAZIL AV DAS NACOESUNIDAS, WHICH IS IN THE NEIGHBORHOOD BROOKLINNOVO KNOWN AS THE "NEW BROOKLYN" IT IS ONE OFTHE MOST EXPENSIVE NEIGHBORHOODS

CODE SUMMARY:A1: TITLE PAGE

A2: PARTITION PLANS

A3: FURNITURE PLANS

A4: FINISH PLANS

A5: FLOORING PLANS

A6: FIRE & LIFE SAFETY PLANS

A7: RCP W/ SURPRESSION & LIGHTING

001 SCHEMATIC DESIGN 4/22/2015

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

UP

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

DN

-

-

-

-

211 SFBreak Out

292 SFBreak Out

48 SFP. Office45 SF

P. Office

61 SFP. Office

50 SFP. Office

63 SFP. Office

67 SFP. Office

46 SFP. Office

46 SFP. Office

49 SFP. Office

46 SFP. Office

60 SFP. Office

429 SFBenching (10)

394 SFBenching (10)

50 SFP. Office

261 SFBenching (4)

250 SFBenching (4)

330 SFBenching (4)

198 SFBenching (4)

166 SFBenching (4)

157 SFBenching (4)

164 SFBike Room

257 SFFlex Room

468 SFAV Conference (10)

186 SFAV Conference (4)

378 SFAV Conference (6)

325 SFAV Conference (6)

184 SFBenching (3)

141 SFBenching (2)

72 SFPhone Booth

1157 SFBreak Out

286 SFLobby

CH1

CH2 CH1CH1

CH1

CH2CH2 CH2

CH2CH2CH2CH2

CH2 CH2CH2

CH1

CH1

CH1

CH1

CH2CH2 CH2

CH2CH2CH2

TBL 2

CH2

CH2CH2

CH2

CH2CH2 CH2 CH2CH2

CH2 CH2 CH2

CH2CH2CH2CH2

CH2 CH2 CH2

CH2CH2

TBL1

TBL1

TBL 2

TBL 2

TBL 2

TBL 2TBL 2

TBL 2TBL 2

TBL 2

TBL 2

TBL 2

TBL 2TBL 2

TBL 2 TBL 2

TBL 2 TBL 2

TBL 2 TBL 2

TBL 2

TBL 2 TBL 2 TBL 2 TBL 2

TBL 2TBL 2TBL 2

TBL 2 TBL 2 TBL 2 TBL 2

TBL 2TBL 2TBL 2

TBL 2 TBL 2

CH2

CH3 CH3

CH2 CH3CH3

CH3

CH2 CH3CH3

CH3

CH3 CH3

CH3 CH3

CH3

CH3

CH3

CH3

CH3

CH 4

CH 4

CH 4CH 4

CH 4

CH 4 CH 4 CH 4 CH 4

CH 4 CH 4 CH 4

CH5CH5

CH5CH5

CH5

CH5CH5

CH5CH5

CH5CH5

CH5CH5

CH 6 CH 6

CH 6CH 6

CH 6 CH 6

CH 6CH 6

CH5CH5

CH5CH5

CH7

CH7

CH7

CH7

CH8 CH8

CH8CH8

CH8 CH8

CH8CH8

CH8 CH8

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1

DSK1 DSK1

DSK1

TBL 3

TBL 3CH4 CH4

CH8CH8

CH9

CH9

CH4 CH4

TBL4

TBL4TBL4

TBL4

TBL4 TBL4

TBL4TBL4

TBL5

TBL6

TBL5

CH10

CH11 CH12CH11

CH12

CH11CH11CH11

CH11

CH11TBL7

CH11

CH2

CH11

TBL7

CH12

CH12CH11

CH11

CH11 CH11

TBL7

-

-

-

-

627 SFWork Out Facility

225 SFWomans Locker

247 SFMens Locker

3846 SFBreak Out

60 SFPhone Booth

128 SFBack of House

324 SFBistro

264 SFKitchenette

CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1

CH1 CH1 CH1 CH1 CH1 CH1

CH1

CH1

CH1

CH1 CH1

CH1

CH1

CH1CH1

CH1

CH1

CH1

CH1CH1CH1CH1CH1CH1CH10TBL7CH10

CH10

CH4TBL7

CH1CH1CH1CH1CH1CH1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

LCKR1LCKR1

LCKR1

LCKR1

LCKR1

LCKR1

CH4

CH13 CH13

CH14 CH14

CH14 CH14

CH14 CH14

CH14CH14

CH14 CH14

CH14CH14

CH14

CH14

CH14

CH14

CH14

CH14

CH14

CH14

CH15

CH15

CH15

CH15

CH15

CH15

CH15

CH15

CH15

TBL5

TBL5

TBL5

TBL8

TBL8

TBL5

TBL8

TBL5

TBL5TBL5

TBL8

TBL5

TBL8

TBL9 TBL9 TBL9

TBL10

TBL11TBL11TBL11

TBL9TBL9TBL9

HANNAH DESIREE MACKIN

Scale

Project number

Date

Drawn by

Checked by

HDM

1/16" = 1'-0"

A3

FURNITURE PLANS

ASSIGNMENT 6

SAO PAULOWORK TO LIVE

5/7/2015Author

Checker

001 SCHEMATIC DESIGN 4/22/2015

1/16" = 1'-0"1 LEVEL 1 FURNITURE PLAN 1/16" = 1'-0"2 LEVEL 2 FURNITURE PLAN

Furniture Schedule

Type Mark ModelManufactur

er Description Cost

CH 6 Very Haworth Very TaskChair

LCKR1 PSL722424BDRD

SpacesaverCorporation

PersonalStorageLocker -DoubleDoorw/BenchDrawer

TBL1 PT2000 HighTower Spinal,MultiPurpose

TBL5 FC9048 HighTower 4Mat TableTBL7 HT12950 HighTower Ayre Side

TableTBL8 HT3060 HighTower Hudson,

StandingHeight

TBL9 PT1060S HighTower Spinal,Cafe

TBL10 PT7600 HighTower Spinal,Meeting,Boatshape

TBL11 PT1050B HighTower Spinal,Side/Coffee

TBL 2 HT3030 HighTower Teton,SINGLEUSERWorksation

TBL 3 HT3690 HighTower Tombolo,CoffeeTable

Grand total: 306

Furniture Schedule

Type Mark ModelManufactur

er Description Cost

HT12500 HighTower Ayre Benchw/ WoodSlats

CH1 FC12500 HighTower Four CastFOUR

CH2 FC13511 HighTower Four CastXL

CH3 SA-747 HighTower AvalonLoungeChair

CH4 HT3635 HighTower 3 Seat Sofaw/Arms

CH5 Very Haworth Very TaskChair

CH7 PT205 HighTower ASAPCH8 Haworth_C

ollaborate_Chair-Lounge

Haworth Haworth_Collaborate_Chair-Lounge

CH9 HT3645 HighTower 4 Seat Sofaw/Arms

CH10 GZ7950 HighTower ShelterHighbackChair

CH13 HT3625 HighTower 2 Seat Sofaw/Arms

CH14 KLS193 HighTower AdamBarstool,Birch Seat

CH15 SS 200W HighTowerGroup

30" Simon,Wood Seat

CH 4 Haworth_Chair_Zody-Task

Haworth Haworth_Chair_Zody-Task

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

-

-

-

-

60 ft.

59 ft.

86ft.

79 ft.

117 ft.79 ft.

78 ft.

Area of RefugeArea of Refuge

80 ft.

114 ft.

R 2' - 6

"

4' -

10"

6' - 9 15/32"

R2'

- 6"

10' - 9 3/32"

-

-

-

-

90 ft.

82 ft.

Area of Refuge Area ofRefuge

88 ft.

78 ft.

HANNAH DESIREE MACKIN

Scale

Project number

Date

Drawn by

Checked by

HDM

1/16" = 1'-0"

A5

FIRE & LIFE SAFETYPLANS

ASSIGNMENT 6

SAO PAULOWORK TO LIVE

5/7/2015Author

Checker

001 SCHEMATIC DESIGN 4/22/2015

1/16" = 1'-0"1LEVEL 1 FIRE/ SAFETY/ ADA/ SECURITYPLAN

1/16" = 1'-0"2LEVEL 2 FIRE/ SAFETY/ ADA/ SECURITYPLAN

CODE SUMMARY:TENANT SQUARE FOOTAGE: ROUGHLY 15,000SQUARE FEETCONSTRUCTION TYPE: BOCCUPANT TYPE: IIIAPPLICATION BUILDING CODE2015 INTERNATIONAL BUILDING CODE2015 INTERNATIONAL FIRE CODEIBC 60684 (INTERNATIONAL ELECTROTECHNICALCOMMISSIONS INT'L STANDARD)2015 INTERNATIONAL MECHANICAL CODE2015 INTERNATIONAL PLUMBING CODE

LIFE SAFETY:-MAIN ENTRY TO LOBBY WILL BE ACCESSIBLE TO THEPUBLIC FROM 8AM-5PM-THE ENTRY DOOR OTHER HOURS WILL BE LOCKEDAND ONLY ACCESSIBLE BY DOOR CODE ACCESS TOEMPLOYEES-MAIN LOBBY WILL BE MONITORED 24/7 WITH VIDEOSURVEILLANCE-MAIN LOBBY ACCESS WILL ALSO BE MOTIONSENSORED

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

UP

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

DN

-

-

-

-

-

-

-

-

HANNAH DESIREE MACKIN

Scale

Project number

Date

Drawn by

Checked by

HDM

1/16" = 1'-0"

A4

FINISH PLANS

ASSIGNMENT 6

SAO PAULOWORK TO LIVE

5/7/2015Author

Checker

001 SCHEMATIC DESIGN 4/22/2015

1/16" = 1'-0"1 LEVEL 1 FINISH PLAN 1/16" = 1'-0"2 LEVEL 2 FINISH PLAN

Room Finish ScheduleName Floor Finish Wall Finish Ceiling Finish

Break Out CPT.1 SW 7077 GYP.1Break Out CPT.1 SW 7077 GYP.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1P. Office CONC. SW 7077 ACT.1Benching (10) CONC. SW 7077 GYP.1Benching (10) CONC. SW 7077 GYP.1P. Office CONC. SW 7077 ACT.1Benching (4) CONC. SW 7077 GYP.1Benching (4) CONC. SW 7077 GYP.1Benching (4) CONC. SW 7077 GYP.1Benching (4) CONC. SW 7077 GYP.1Benching (4) CONC. SW 7077 GYP.1Benching (4) CONC. SW 7077 GYP.1Bike Room CONC. SW 6880 GYP.1Flex Room CONC. SW 6880 GYP.1AV Conference(10)

CPT.1 SW 7077 ACT.1

AV Conference(4)

CPT.1 SW 7077 ACT.1

AV Conference(6)

CPT.1 SW 7077 ACT.1

AV Conference(6)

CPT.1 SW 7077 ACT.1

Benching (3) CONC. SW 7077 GYP.1Benching (2) CONC. SW 7077 ACT.1Phone Booth CONC. SW 7077 ACT.1Break Out CONC. SW 7077 ACT.1Lobby BAMBOO SW 6880 GYP.1Work OutFacility

RUBBER SW 6683 ACT.1

Womans Locker RUBBER SW 6683 ACT.1Mens Locker RUBBER SW 6683 ACT.1Break Out CPT.1 SW 7077 GYP.1Phone Booth CONC. SW 6683 GYP.1Back of House CONC. SW 6683 GYP.1Bistro CONC. SW 6683 GYP.1Kitchenette CONC. SW 7077 GYP.1

-

-

-

-

-

-

-

-

PENDANT LIGHT, DISK

PENDANT LIGHT, MEDIUM

PENDANT LIGHT, SMALL

RECESSED 6"

PENDANT LIGHT, BULB

PENDANT LIGHT, LINEAR

HANNAH DESIREE MACKIN

Scale

Project number

Date

Drawn by

Checked by

HDM

As indicated

A6

RCP W/ SUPRESSION& LIGHTING PLANS

ASSIGNMENT 6

SAO PAULOWORK TO LIVE

5/7/2015Author

Checker

001 SCHEMATIC DESIGN 4/22/2015

1/16" = 1'-0"1 Level 1 1/16" = 1'-0"2 Level 2

1/4" = 1'-0"LIGHTING

Lighting Fixture Schedule

Family andType

AssemblyDescription Efficacy Illuminance

LuminousFlux

LuminousIntensity Ballast Loss

Initial ColorTemperatur

e

HighTower_Caravaggio_Small: P1

Lighting -Incandescent

149 lm/W 15 lx 1800 lm 143 cd 3200 K

PendantLight - Disklight sorce:100W -120V

Lighting -Incandescent

17 lm/W 14 lx 1690 lm 134 cd 1 2800 K

PendantLight - Disklight sorce:100W -277V

Lighting -Incandescent

17 lm/W 14 lx 1690 lm 134 cd 1 2800 K

PendantLight -Linear - 1Lamp: 48" -277V

Lighting -Fluorescent

79 lm/W 27 lx 3150 lm 251 cd 0.88 4230 K

Grand total: 350

Lighting Fixture Schedule

Family andType

AssemblyDescription Efficacy Illuminance

LuminousFlux

LuminousIntensity Ballast Loss

Initial ColorTemperatur

e

Downlight -RecessedCan: 6"Incandescent - 120V

Lighting -Incandescent

14 lm/W 7 lx 855 lm 68 cd 1 2800 K

Downlight -RecessedCan: 8"Incandescent - 277V

Lighting -Incandescent

18 lm/W 15 lx 1750 lm 139 cd 1 2800 K

HighTower_BulbFiction_P1: P1

Lighting -Incandescent

100 lm/W 36 lx 4193 lm 334 cd 3200 K

HighTower_Caravaggio_Large:HighTower_Caravaggio_Large

Lighting -Incandescent

149 lm/W 15 lx 1800 lm 143 cd 3200 K

HighTower_Caravaggio_Medium:P2

Lighting -Incandescent

149 lm/W 15 lx 1800 lm 143 cd 3200 K

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

UP

Y2 Z2 A3 B3

C3

D3

E3

18B19B

20B21B

Botoeira

DN

-

-

-

-

Bike Room

Flex Room

Break-Out

Reception

Benching Station

Individual Workstation

Social Break-Out

Open to Above

Conf. AV (6)

Conf. AV (6)

Conf. AV (10)

Conf. AV (4)

Break-Out

Phone Booth

Benching Station

86' -

10

3/4"

13' -

10

15/3

2"27

' - 6

5/1

6"11

' - 9

5/1

6"

166' - 3 17/32"

18' - 7 3/32"

86' -

10

3/4"

14' -

10

3/4"

-

-

-

-

Bistro

Kitchenette

Work-OutFacility

MaleLockerRoom

FemaleLockerRoom Social Break-Out

Open to Below

Back of theHouse

Phone Booth15' - 10 1/16" 18' - 9 7/8"

86' -

10

3/4"

21' -

7 3

/8"

15' -

0"

166' - 3 17/32"

12' - 0"54' - 11 5/16"28' - 5 3/16" 55' - 0 1/32" 16' - 0"

9' - 0"

7' -

6"

HANNAH DESIREE MACKIN

Scale

Project number

Date

Drawn by

Checked by

HDM

1/16" = 1'-0"

A2

PARTITION PLANS

ASSIGNMENT 6

SAO PAULOWORK TO LIVE

5/7/2015Author

Checker

1/16" = 1'-0"1 LEVEL 1 PARTITION PLAN 1/16" = 1'-0"2 LEVEL 2 PARTITION PLAN

001 SCHEMATIC DESIGN 4/22/2015

Space Program

Name Area Level

Benching (4) 157 SF Level 1Bike Room 164 SF Level 1Flex Room 257 SF Level 1AV Conference (10) 468 SF Level 1AV Conference (4) 186 SF Level 1AV Conference (6) 378 SF Level 1AV Conference (6) 325 SF Level 1Benching (3) 184 SF Level 1Benching (2) 141 SF Level 1Phone Booth 72 SF Level 1Break Out 1157 SF Level 1Lobby 286 SF Level 1Work Out Facility 627 SF Level 2Womans Locker 225 SF Level 2Mens Locker 247 SF Level 2Break Out 3846 SF Level 2Phone Booth 60 SF Level 2Back of House 128 SF Level 2Bistro 324 SF Level 2Kitchenette 264 SF Level 2

Space Program

Name Area Level

Break Out 211 SF Level 1Break Out 292 SF Level 1P. Office 48 SF Level 1P. Office 45 SF Level 1P. Office 61 SF Level 1P. Office 50 SF Level 1P. Office 63 SF Level 1P. Office 67 SF Level 1P. Office 46 SF Level 1P. Office 46 SF Level 1P. Office 49 SF Level 1P. Office 46 SF Level 1P. Office 60 SF Level 1Benching (10) 429 SF Level 1Benching (10) 394 SF Level 1P. Office 50 SF Level 1Benching (4) 261 SF Level 1Benching (4) 250 SF Level 1Benching (4) 330 SF Level 1Benching (4) 198 SF Level 1Benching (4) 166 SF Level 1

CONSTRUCTION DOCUMENTS

Page 14: Hannah Mackin Portfolio

Two

9

Page 15: Hannah Mackin Portfolio

Luxury ApartmentDesign Challenge:To renovate an existing flat in an apartment building to a luxurious home in Florence, Italy with no budget constraints. This space is unique because many of the walls are structural and cannot be moved making renovation challenging. The space also includes a flex space that can be used as a spare studio or as second income that could be rented out.

Application:Materiality was a focus because of the luxurious aspect. Italians take pride in craftsmanship and bespoke, in luxurious spaces especially. Throughout the floor plan the Italian design differs by hiding services areas such as bathrooms and the kitchen, this is reflected on the floor plan.

Page 16: Hannah Mackin Portfolio

11

FLOOR PLAN

Page 17: Hannah Mackin Portfolio

LIVING ROOM PERSPECTIVE

Page 18: Hannah Mackin Portfolio

13

MATERIAL FLOOR PLAN

Page 19: Hannah Mackin Portfolio

MASTER BEDROOM PERSPECTIVE

MASTER BATHROOM ELEVATION

Page 20: Hannah Mackin Portfolio

Three

15

Page 21: Hannah Mackin Portfolio

L ittle Free L ibraryDesign Challenge:To work within a group and to draw construction documents based on a Rural Community Design Initiative student design for a free little library project. After completing the construction documents and detail drawings moved on to the creation and fabrication of design. This project is now in use in Rosalia, Washington.

Application:To complete a project from the construction document phase to the final built phase. Be able to apply construction documents to an actual built product. Focused on materiality for outdoor use and actual built construction.

Page 22: Hannah Mackin Portfolio

FRONT

BACK

A1

A3

A2

A4A5 RIGHTLEFT

TOP OF R

2' - 0"

0' - 11"0' - 5"0' - 8"

1' -

0"

0' -

0 3/

4"

17

Page 23: Hannah Mackin Portfolio
Page 24: Hannah Mackin Portfolio

Four

19

Page 25: Hannah Mackin Portfolio

Pop-Up RestaurantDesign Challenge:To design a mobile pop-up restaurant for Seattle’s legendary chef Tom Douglas. The space will include a kitchen and some seating. The pop-up will also sell Tom Douglas retail merchandise including rubs and his hot stove knives. The mobile restaurant will share with the community who Tom Douglas is and what he stands for.

Application:Tom Douglas is known for being an honest chef, such as his farm to table concept of cooking. The pop-up restaurant highlights his simple approach with food and is seen throughout the design. The pop-up will be a mobile parklet that will travel and share the fresh food of Tom Douglas.

Page 26: Hannah Mackin Portfolio

21

NORTH ELEVATION

SOUTH ELEVATION

WEST ELEVATION

Page 27: Hannah Mackin Portfolio

EXTERIOR PERSPECTIVE

Page 28: Hannah Mackin Portfolio

Five

23

Page 29: Hannah Mackin Portfolio

Boutique HotelDesign Challenge:A historical building redesign in Florence, Italy into a luxurious boutique hotel. Required to design twelve rooms on each floor to maximize the design of the luxurious. This building is also historic so keeping all this in mind through the schematic design process.

Application:Applied the Italian luxurious design in every detail. To make the guest feel at home while being away from their own home.

Page 30: Hannah Mackin Portfolio

25LEVEL 1 FLOOR PLAN

Page 31: Hannah Mackin Portfolio

LIBRARY PERSPECTIVE

LEVEL 2 FLOOR PLAN

Page 32: Hannah Mackin Portfolio

27

CLASSIC ROOM

JUNIOR SUITE

SUPERIOR SUITE

Page 33: Hannah Mackin Portfolio
Page 34: Hannah Mackin Portfolio

Thank youHannah Mackin

509.481.1427

[email protected]